NAVY MIL-V-24272 B-1985 VALVE MANIFOLDS HIGH PRESSURE GAS REDUCING《高压天然气减少阀组》.pdf
《NAVY MIL-V-24272 B-1985 VALVE MANIFOLDS HIGH PRESSURE GAS REDUCING《高压天然气减少阀组》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-V-24272 B-1985 VALVE MANIFOLDS HIGH PRESSURE GAS REDUCING《高压天然气减少阀组》.pdf(29页珍藏版)》请在麦多课文档分享上搜索。
1、T NIL-V-24272B 4 9999906 0274748 5 400 1500 3000 6000 10 40 75 150 so that flow o 9 -. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-24272B Li manufacturers name, PMR11GH-2, and so forth). In addition to the subassembly drawings, a drawing of
2、 the manifold block (not necessarily in cross-section) shall be required. affixed parts as identification plates and studs, the block may be included in the drawings of the subassemblies which they attach. The internal parts details shall be included either with the asso- The model designation shall
3、 uniquely define This shall include only the block plus such permanently Capscrews threading into 3.6.2 Technical manuals. In addition to the general requirements specified in the data ordering document (see 6.2.2), the following shall be included as part of the manual contents. (a) The engineering
4、drawings for the valve (including certification data sheet). These drawings shall be supplemented by additional illustrations where necessary to adequately illustrate operation and maintenance. blowouts, partial or full sections, and so forth, and may eliminate extraneous lines and details to clarif
5、y the interaction of parts. alent procedures) for making up all joints and threaded assemblies. providing procedures for the complete disassembly and reassembly of the equipment, maintenance and troubleshooting sections shall contain, or refer to, only the limited disassembly and reassembly required
6、 to accomplish each particular operation. to reduce the possibility of unnecessary disassembly and unnecessary disturbance of adjustments when performing specific or limited maintenance or troubleshooting operations. These additional illustrations may consist of (b) (c) Detailed disassembly and reas
7、sembly procedures. In addition to Table listing wrench sizes and assembly torques (or other equiv- This is intended (d) Adjustment procedures. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the con- tract or purchase order, the contractor is responsi
8、ble for the performance of all inspection requirements as specified herein. in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government res
9、erves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Except as otherwise specified 13 Provided by IHSNot for ResaleNo reproduction or networking permitted witho
10、ut license from IHS-,-,-4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of th
11、e responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. The inspection set forth in
12、 this specification shall Sampling in quality conformance does not authorize submission of I 4.5 Examination. 4.2 Classification of inspection. The inspection requirements specified herein are classified as follows: (a) (b) First article inspection (see 4.3). Quality conformance inspection (see 4.4)
13、. 4.3 First: article inspection. First article inspection shall consist of The the examination of 4.5.1 and the tests specified in 4.6.1 through 4.6.19. manifold assembly submitted for first article inspection shall be accompanied by the following items: (a) Internal replaceable trim; poppets, sprin
14、gs, filter elements, (b) Nonmetallic parts: O-rings, seating inserts, gaskets, and so (e) (d) (e) and so forth - one complete set per manifold. forth - two complete sets per manifold, Special tools required for installation, operation and maintenance - one complete set per manifold. Instruction book
15、 or preliminary technical manual for installation, operation and maintenance - one per manifold. Drawings of test manifold in accordance with 3.6.1. 4.3.1 First article test pr0cedure.s. Procedures covering all tests and inspections to be conducted for first article shall be prepared in accordance w
16、ith the data ordering documents specified (see 6.2.2). 4.3.2 First article inspection report. A first article inspection report shall be prepared in accordance with the data ordering documents epecif ied (see 6.2 . 2) . 4.4 Quality conformance inspection. Each production manifold shall be examined a
17、s specified in 4.5.2 and tested as specified in 4.6.1, 4.6.4, 4.6.8, 46.9, 4.6.10, 4.6.11 and 4.6.14. Any discrepancies or failures shall be corrected prior to acceptance. with the data ordering document included in the contract or order (see 6.2.2). Test reports shall be prepared in accordance 4.5.
18、1 First article examination. Upon receipt of the first srticle, it shall be disassembled and visually examined to determine conformance with the requirement6 of this specification. On reassembly, all nonmetallic parts, except the end connection O-rings, shall be replaced with spares, randomly select
19、ed from those provided with the manifold. entirely by test personnel using only the technical manual supplied with the manifold for guidance. This shall be accomplished 14 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-2Ll272B Ll 7773906 027LI
20、762 T MIL-V-24272B(SH) 4.5.2 Quality conformance examination. The manifold shall be examined to determine conformance with the requirements as specified i.n 3.2, 3.3 and 3.4. Examination shall be limited to external examination without disassembly. 4.6 Tests. 4.6.1 Proof, Each portion of the manifol
21、d (that is upstream and downstream of the regulator cutout valve) shall be proof tested at the applicable pressure specified in 3.4.2. Pressure shall be applied for 2 minutes, depressurized and pressure applied again for 2 minutes. Water, nitrogen or air may be used. distortion or structural failure
22、. There shall be no external leakage, permanent 4.6.2 High-impact shock. The manifold shall be subjected to and meet the high-impact shock tests for grade A, class I as specified in MIL-S-901 pressurized with water, air or nitrogen. to the manifold or any sub-components. There shall be no degradatio
23、n to the performame capability of the manifold. There shall bo no structural damage 4.6.3 Vibration. The manifold shall be vibration tested in accordance There with type I of MIL-STD-167-1 pressurized with water, air or nitrogen. shall be no resonance in the range of frequency tested. structural dam
24、age or degradation to the performance capability of the Ilianifold. There shall be no 4.6.4 Accuracy of regulation. The manifold shall be tested for accuracy of regulation at each inlet pressure/set pressure combination defined below. Flow rate at each condition shall be varied over the full operati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILV24272B1985VALVEMANIFOLDSHIGHPRESSUREGASREDUCING 高压 天然气 减少 PDF

链接地址:http://www.mydoc123.com/p-983056.html