AIR FORCE DI-SESS-81771-2009 REUSE MANAGEMENT REPORT (ReMR)《再用管理报告(ReMR)》.pdf
《AIR FORCE DI-SESS-81771-2009 REUSE MANAGEMENT REPORT (ReMR)《再用管理报告(ReMR)》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE DI-SESS-81771-2009 REUSE MANAGEMENT REPORT (ReMR)《再用管理报告(ReMR)》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、DATA ITEM DESCRIPTION Title: REUSE MANAGEMENT REPORT (ReMR) Number: DI-SESS-81771 Approval Date: 20090520 AMSC Number: F9071 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Preparing Activity: 13 (ESC/AQT) Applicable Forms: Worksheet Questions for Reused As-is/Modified Software Worksheet
2、Questions for COTS/GOTS Software Use/Relationships: The Reuse Management Report (ReMR) provides information about existing software products intended to be reused as-is or modified as part of the delivered operational software. The report also provides the acquirer insight into the current status of
3、 the activities associated with the reuse of these products as compared to the planned activities, and alternative approaches. This Data Item Description (DID) contains the format, content and intended use information for the data product resulting from the work tasks described in the contract. Requ
4、irements: 1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as cited in the contract. 2. Format. Contractor format is acceptable. 3. Content. The report shall contain the
5、 following: 3.1 Executive Summary. This section shall identify and briefly describe all software products that will be reused as-is or modified (existing software requiring change) and integrated into the delivered operational software. Both commercial off-the-shelf (COTS) and government off-the-she
6、lf (GOTS) shall be included. 3.2. Current Status. This section shall present the current status of the software reuse activities compared to the contractors planned activities. Status shall include progress made and accomplishments for the engineering and management activities for each software reus
7、e product. 3.3. Variance. This section shall identify any activities where work is not progressing in accordance with the plans and schedules, including the reasons for this lack of progress. 3.4. Milestones. This section shall describe the progress made against program milestones during the reporti
8、ng period. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DI-SESS-81771 2 3.5. Alternative Approaches. This section shall describe alternative approaches for any reused as-is/modified and COTS/GOTS software products that are 1) considered high or mo
9、derate risk or 2) not available (i.e., fully documented and tested) at contract award. Alternative approaches provide options if these software reuse products cannot be implemented as planned. 3.6. Impacts of Implementing Alternative Approaches. This section shall include an assessment of the techni
10、cal impacts to the program and estimates of the programmatic (i.e., effort and schedule) impacts of implementing alternative approaches. 3.7. Decision Points. This section shall include the decision points for implementing alternative approaches. These decision points shall identify when the alterna
11、tive approach would need to be implemented in the event that the planned software reuse products are not available in time to preserve the program schedule. 3.8. Worksheet Questions. This section shall include the completed forms (updated, if needed) for all reused as-is/modified and COTS/GOTS softw
12、are products in accordance with the instructions embedded in the forms. Forms will be included for any newly identified software reuse products. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DI-SESS-81771 3 WORKSHEET QUESTIONS FOR REUSED AS-IS/MODI
13、FIED SOFTWARE The questions below should be answered in the corresponding worksheet format for each software product for which the Contractor plans to assume responsibility for the performance of the product. Software products may be reused as-is or modified. Information about the commercial off-the
14、-shelf (COTS) or Government off-the-shelf (GOTS) software products that will be reused as-is should be provided in the worksheet format titled “Worksheet Questions for COTS/GOTS Software.” Product and Contact Information 1. What is the name of the software product to be reused as-is or modified? 2.
15、What is the version number and date of release for the software product that is being reused as-is/modified? 3. What are the programming language(s) of this software? 4. For which system/program was the software originally developed? 5. Provide contact information, including the contacts name, the o
16、ffice symbol (if applicable), phone number and address for the: - Program manager currently responsible for the reused as-is/modified software - Responsible entity or source of the software, if the Government is not responsible for the software Applicability 6. To which Computer Software Configurati
17、on Item (CSCI) (and Computer Software Component (CSC), if known) is this reused as-is/modified software product assigned? 7. What functions/requirements will the software provide? (Attach a separate sheet that shows performance requirements cross referenced to the Technical Requirements Document (TR
18、D). Identify any mismatches in requirements between the TRD and the reused as-is/modified software product.) 8. Has the Contractor conducted an internal demonstration(s) to evaluate the applicability of this software product for this system/program? - If yes, provide additional information 9. Have t
19、he software products interfaces that provide access to the functionality been evaluated? - If yes, provide additional information 10. Has the software products architecture been evaluated for compatibility with the system architecture? - If yes, provide additional information 11. Has the software pr
20、oduct been used on a hardware/software platform similar to the one proposed for this system/program? Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DI-SESS-81771 4 - If yes, provide additional information Extent of Modification 12. Briefly describe
21、the tasks (e.g., modification, integration, test) required to make the reused as-is/modified software functional within this system. 13. What organization will perform the modifications to this software product? 14. What organization will integrate the reused as-is/modified software with the systems
22、 software? 15. What is the effective size of the reused as-is/modified software product and extent of the modification, if applicable? Complete this table, in an Excel workbook, according to the definitions and instructions attached. A B C D E F G H I JTotal Delivery or Delivered BuildID Number of C
23、SCI Contained In Name of CSCI Contained InCSC NameModule or Class LevelDevelopment Contractor/ SubcontractorSizing MethodNew SoftwareTotal Pre-existing SoftwareDeletedSoftwareK L M N O P Q RModified SoftwareRedesign Required (%)Reimple- mentation Required (%)RetestRequired (%)Weight for Design Phase
24、 (%)Weight for Implementation Phase (%)Weight for Test Phase(%)Effective Size for Modified SoftwareS T U V W XReused As-is/ Lifted SoftwareReuse As-is/ Lift Factor Required (%)Effective Size for Reused As-is/Lifted SoftwareTotal Effective SizeEffective Size Representing Software GrowthTotal SizeMatu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEDISESS817712009REUSEMANAGEMENTREPORTREMR 再用 管理 报告 REMR PDF

链接地址:http://www.mydoc123.com/p-427386.html