1、Public Lessons Learned Entry: 5796 Lesson Info: Lesson Number: 5796 Lesson Date: 2011-06-13 Submitting Organization: JPL Submitted by: Matthew Wallace Subject: MSL Backshell Crane Incident Abstract: In May 2011, the Mars Science Laboratory (MSL) Flight Backshell was inadvertently lifted while attach
2、ed to the Backshell Cart. The incident occurred at Kennedy Space Center (KSC) in the Payload Hazardous Servicing Facility (PHSF). The weight of the Backshell Cart imparted loads into the Backshell structure through the flight hardware ground support interfaces. The event was caused by a crane operat
3、or error in which the operator drove the crane in the up direction instead of the commanded down direction. The MSL project identified a set of actions to address the vulnerability experienced in this operation. Immediate corrective actions have been implemented, and longer-term corrective actions a
4、re in progress. Description of Driving Event: A “near miss” handling incident (Reference (1) occurred during an Aeroshell Mass Properties Test conducted at the NASA Kennedy Space Center (KSC) on the Mars Science Laboratory (MSL) spacecraft Flight Backshell. Designed and built by the NASA/Caltech Jet
5、 Propulsion Laboratory (JPL), the MSL spacecraft (Figure 1) consists of a Cruise Stage, an Entry, Descent, and Landing System that ejects the protective Backshell immediately following Parachute Descent and just prior to Powered Descent, and the Rover. Provided by IHSNot for ResaleNo reproduction or
6、 networking permitted without license from IHS-,-,- Figure 1. Major elements of the MSL spacecraft A crane was used for the installation of the Descent Stage Simulator (DSS) into the Backshell in preparation for a Backshell to Heatshield fit-check (see Figures 2 and 3). Just prior to the incident, t
7、he DSS had been secured to the Backshell, and the system test team prepared to unload the crane and remove the rigging. A “Hydra Set” load positioning system was used to lower the crane hook until the lifting slings went slack and the load cell read zero. The lift conductor then gave the “down slow“
8、 command. The “down slow“ command was repeated by the crane operator, but the crane operator commanded the crane to go “up slow.“ The team observed the tautening of the lifting slings, and the “Stop” command was immediately issued. The crane was stopped, and then lowered. It was noted that the load
9、cell peaked at 4,400 lbs., and it appeared that two of the legs (jacks) of the Backshell Cart were lifted slightly off the floor. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Figure 2. Backshell and Backshell CartThe topmost note (yellow font) in
10、the photo states, “Crane pulled in up direction (while BS was attached to cart).” The second note states, “Essentially, a large nut plate, Descent Stage Surrogate, is attached at the flight interfaces on the bottom of the BIP (Backshell Interface Plate).” The third note (red font) states, “Backshell
11、 is attached to Cart at nine (9) locations.” The bottom note states, “Red GSE fitting straddles flight interface. GSE fitting is attached into 4 inserts on bottom of BS (Backshell) on one side and to Backshell cart on the other.” Figure 3. Backshell and Descent Stage Simulator / Surrogate Suspended
12、from Spacecraft Assembly and Rotation Fixture (SCARF) The topmost note (yellow font) in the photo states, “4X size #10 inserts in Backshell Stiffening Ring used to attach the Red GSE fitting that attaches the Backshell to the Cart.” The lower note states, “Descent Stage Surrogate in action. Used to
13、attach the Backshell to our rotation fixture (SCARF) by attaching to our flight like GSE LVA (Launch Vehicle Adapter) Ring.” A loads analysis of the lift incident was performed. The area of concern was associated with the GSE fittings on the bottom of the Backshell where the structure connects to th
14、e Backshell Cart, and the area near these fittings. The structure was found to have been tested to loads that provided sufficient margin against the loads imparted during the incident. Analysis, inspections, and tap tests on the Backshell conducted by the Backshell manufacturer and JPL confirmed tha
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS57962011LESSONSLEARNEDMSLBACKSHELLCRANEINCIDENTPDF

链接地址:http://www.mydoc123.com/p-1019506.html