1、Public Lessons Learned Entry: 5216 Lesson Info: Lesson Number: 5216 Submitting Organization: KSC Submitted by: Dawn Martin Subject: Pre-Task briefings to Improve Safety / Ladder Fall Incident Abstract: A technician climbed a five-foot portable ladder to the second-from-the-bottom rung in preparation
2、 for a cable pulling task. The technician moved a ceiling tile in order to view the area above the ceiling. After finishing the inspection of the above-the-ceiling area, the technician began descending the ladder. The technicians right boot momentarily caught at the second-from-the-bottom rung. This
3、 caused the technician to pivot counterclockwise (plan view), twist away from the ladder, and fall approximately two-feet to the vinyl-asbestos tile covered concrete floor. The technician suffered injuries in the form of a laceration to his/her forehead and a broken arm. Pre-task briefings should be
4、 conducted to raise awareness of possible safety problems and proper techniques. Description of Driving Event: A technician climbed a five-foot portable ladder to the second-from-the-bottom rung in preparation for a cable pulling task at the Operations and Checkout building (O&C), at approximately 9
5、:25 a.m. on June 17th, 2007. The task that the Technician was completing at the time of the mishap was in preparation for the cable pulling portion of Work Order (WO) 474304 “Install (2) Aggregate Switches in the O&C”. Prior to pulling the cable, the Technician determined it was necessary, based on
6、prior experience in the O&C Building, to verify that the routing path for the cable was clear of obstructions. To complete this task, the Technician had to remove a ceiling tile and look up into the area above the ceiling. Reaching the ceiling tile required the use of a ladder. The technician moved
7、a ceiling tile in order to view the area above the ceiling. After finishing the inspection of the above-the-ceiling area, the technician began descending the ladder. While descending, the technician held the ladder side rail with his/her right hand only. The technician stepped down one rung with his
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS52162011LESSONSLEARNEDPRETASKBRIEFINGSTOIMPROVESAFETYLADDERFALLINCIDENTPDF

链接地址:http://www.mydoc123.com/p-1019494.html