REG NASA-LLIS-5200-2012 Lessons Learned - Vehicle versus Ground Synchronization.pdf
《REG NASA-LLIS-5200-2012 Lessons Learned - Vehicle versus Ground Synchronization.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-5200-2012 Lessons Learned - Vehicle versus Ground Synchronization.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Public Lessons Learned Entry: 5200 Lesson Info: Lesson Number: 5200 Submitting Organization: KSC Submitted by: Jenni Palmer Subject: Vehicle versus Ground Synchronization Abstract: During the Constellation Program, rework caused excessive costs and schedule slip. The rework resulted from a lack of c
2、oordination in the design and development of flight hardware and ground support equipment. Synchronization of design engineering activities and baseline documentation would address this problem, and should be performed as a fundamental systems engineering best practice. Description of Driving Event:
3、 The Constellation Program had a very aggressive development schedule, using a fast-track method. The vehicle design for the Ares I was being developed at the same time as the ground support equipment (GSE). Changes to the vehicle design were being made frequently. Because there was a program-to-pro
4、ject acceptance delay (needed for communication back and forth across Centers for approval and then on to the Program office), it took a long time for the changes to be added to the program baseline. During that time, the Mobile Launcher Team was working on an older configuration while the flight ha
5、rdware designers were working to the latest updates. The result was unnecessary and costly redesign and rework by Ground Operations projects. For example: (1) The distance from the launch tower to the vehicle was uncertain. If the distance between the tower and the launch vehicle was too close, ther
6、e would be a greater chance that the launch vehicle would hit the tower during liftoff. (2) Uncertainty in the areas where access needed to be provided to the flight vehicle resulted in the use of flexible stairs. (Permanent stairs would be designed at a later date.) This produced a less-than-desira
7、ble design for the stairs, involving multiple transitions to reach the platform level. Lesson(s) Learned: The baseline design configuration for the vehicle should be stabilized before Ground Operations projects, such as the Mobile Launcher and associated GSE, are developed. As the vehicle is being d
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS52002012LESSONSLEARNEDVEHICLEVERSUSGROUNDSYNCHRONIZATIONPDF

链接地址:http://www.mydoc123.com/p-1019490.html