REG UFGS-02 42 51-2012 CARPET REMOVAL AND RECLAMATION.pdf
《REG UFGS-02 42 51-2012 CARPET REMOVAL AND RECLAMATION.pdf》由会员分享,可在线阅读,更多相关《REG UFGS-02 42 51-2012 CARPET REMOVAL AND RECLAMATION.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 42 51 (February 2012)-Preparing Activity: NASA SupersedingUFGS-02 42 51 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2012*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 42 51CARPET R
2、EMOVAL AND RECLAMATION02/12PART 1 GENERAL1.1 REFERENCES1.2 SUMMARY1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Carpet Reclamation Agency1.4.2 Carpet Remover Requirements1.4.3 Carpet Reclamation Agency Submittal1.4.4 Regulatory Requirements1.4.4.1 Carpet Reclamation Agency and Carpet Remover Certificatio
3、n1.5 PROJECT CONDITIONS1.5.1 Environmental RequirementsPART 2 PRODUCTS2.1 CARPET RECLAMATION AGENCY2.2 CARPET REMOVERS2.3 MATERIALS2.3.1 Adhesive Removal Solvents2.3.2 Used Carpet2.3.3 Carpet PadPART 3 EXECUTION3.1 EXAMINATION3.1.1 Verification of Conditions3.2 PREPARATION3.3 CARPET REMOVAL3.4 CONTA
4、INER DISPOSAL3.5 TRUCK TRAILER DISPOSAL3.6 INTERIOR OPERATIONS- End of Section Table of Contents -SECTION 02 42 51 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 42 51 (February 2012)-Preparing Activity:
5、 NASA SupersedingUFGS-02 42 51 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2012*SECTION 02 42 51CARPET REMOVAL AND RECLAMATION02/12*NOTE: This guide specification covers the requirements for removal and reclamation of used carpet, including EP
6、A Affirmative Procurement requirements and Carpet America Recovery Efforts (CARE).Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project spe
7、cific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for th
8、is guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and l
9、isted in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature t
10、o update SECTION 02 42 51 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in th
11、e publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition
12、OperationsU.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials GuidanceEPA AP-42 (1995) Compilation of Air Pollution Emission FactorsU.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)40 CFR 247 Comprehensive Procurement Guide
13、line for Products Containing Recovered Materials40 CFR 61-SUBPART M National Emission Standard for Asbestos1.2 SUMMARY*NOTE: Recycled materials are listed in the EPAs Comprehensive Procurement Guidelines (CPG) http:/www.epa.gov/cpg/. Guidelines are stated for the recommended recycling of Building Ma
14、terials, Paint, and other miscellaneous materials.If the Architect/Engineer/Contracting Officer determines that the salvage value of certain materials meeting the CPG guidelines is insufficient in quantity to merit recycling, or if due to geographical considerations impractical to implement, a waive
15、r may be initiated for the project. Written justification may be submitted on a Request for Waiver Form to the NASA_ Environmental Program Manager for approval.*Furnish a contract for used carpet reclamation, including planned procedures for removal and reclamation of used carpet.Refer to related Se
16、ction 09 68 00 CARPET for floor preparation prior to installation of new carpet.SECTION 02 42 51 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.3 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PR
17、OCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or criticality, with a “G.“ Generally, other submittal items can be reviewed by
18、 the Contractors Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“
19、designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“
20、 for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS0242512012CARPETREMOVALANDRECLAMATIONPDF

链接地址:http://www.mydoc123.com/p-1019624.html