ASTM F1193-2017 Standard Practice for Quality Manufacture and Construction of Amusement Rides and Devices《娱乐骑乘和设备质量 制造以及结构的标准实施规程》.pdf
《ASTM F1193-2017 Standard Practice for Quality Manufacture and Construction of Amusement Rides and Devices《娱乐骑乘和设备质量 制造以及结构的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM F1193-2017 Standard Practice for Quality Manufacture and Construction of Amusement Rides and Devices《娱乐骑乘和设备质量 制造以及结构的标准实施规程》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F1193 16F1193 17Standard Practice forQuality, Manufacture, and Construction of AmusementRides and Devices1This standard is issued under the fixed designation F1193; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the y
2、ear of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice establishes the minimum requirements for a quality assurance program and the manufacturing of amu
3、sementrides and devices (including major modifications).1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety safety, health, and healthenvironmental practices an
4、d determine theapplicability of regulatory limitations prior to use.1.3 This international standard was developed in accordance with internationally recognized principles on standardizationestablished in the Decision on Principles for the Development of International Standards, Guides and Recommenda
5、tions issuedby the World Trade Organization Technical Barriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2E543 Specification for Agencies Performing Nondestructive TestingF770 Practice for Ownership, Operation, Maintenance, and Inspection of Amusement Rides and DevicesF1950
6、Specification for Physical Information to be Transferred With Used Amusement Rides and Devices (Withdrawn 2008)3F2291 Practice for Design of Amusement Rides and Devices2.2 AWS Standards:4As applicable.2.3 ASME Standards:5As applicable.2.4 ASNT Document:6Recommended Practice SNT-TC-1A Personnel Quali
7、fication and Certification in Nondestructive Testing3. Significance and Use3.1 The purpose of this practice is to provide the minimum manufacturing requirements for amusement rides and devices andto provide the minimum requirements for a written quality assurance program for an amusement ride or dev
8、ice manufacturer, orcomponent supplier. This is not intended to include suppliers of off-the-shelf components (for example, fasteners, electrical wire,etc.).4. Drawing Control Procedure4.1 A procedure shall be in effect so that appropriate manufacturing drawings, their engineering revisions, and rel
9、ateddocuments are utilized.1 This practice is under the jurisdiction of ASTM Committee F24 on Amusement Rides and Devices and is the direct responsibility of Subcommittee F24.24 on Designand Manufacture.Current edition approved Feb. 15, 2016Oct. 1, 2017. Published March 2016October 2017. Originally
10、approved in 1988. Last previous edition approved in 20152016 asF1193 15.F1193 16. DOI: 10.1520/F1193-16.10.1520/F1193-17.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer
11、 to the standards Document Summary page on the ASTM website.3 The last approved version of this historical standard is referenced on www.astm.org.4 Available from The American Welding Society (AWS), 550 NW LeJeune Rd., Miami, FL 33126.5 Available from American Society of Mechanical Engineers (ASME),
12、 ASME International Headquarters, Three Park Ave., New York, NY 10016-5990.6 Available from The American Society for Nondestructive Testing (ASNT), P.O. Box 28518, 1711 Arlingate Ln., Columbus, OH 43228-0518.This document is not an ASTM standard and is intended only to provide the user of an ASTM st
13、andard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by A
14、STM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15. Material and Component Control Procedure5.1 Aprocedure shall be in effect so that materials, processes, and components, including raw mat
15、erials, are in accordance withthe engineering specifications.5.1.1 This procedure shall provide the purchasing agent with all the information required to order appropriate material.5.1.2 A receiving procedure shall be in effect so that incoming material and components are checked against the purchas
16、ingspecifications.5.1.3 A procedure shall be in effect so that material in stock can be properly identified for future use.5.1.4 Documentation on any material, process, or components certified shall be filed for reference.6. Manufacturing6.1 Amusement ride and device components and systems shall be
17、manufactured and assembled in accordance with thedesigner/engineer specified criteria.6.2 Changes to the designer/engineer specified criteria shall be documented and approved by the designer/engineer or a qualifiedengineer before components, subassemblies, or systems are placed into use.6.3 Quality
18、Assurance Program:6.3.1 The manufacturer of an amusement ride or device shall have a written quality assurance program as specified in PracticeF1193 for use in conjunction with the design, manufacture, construction, modification, or reconditioning of the amusement rideor device.6.3.2 Quality assuran
19、ce documents, that is, material certifications, test reports, and inspection reports, shall be retained for aperiod of time as deemed appropriate by the manufacturers.7. Inspection7.1 A procedure shall be in effect so that appropriate inspections are made on manufactured parts and subassemblies, for
20、conformance with the designer/engineer specified criteria.7.2 A procedure shall be in effect so that appropriate inspections are made on purchased components.7.3 A procedure shall be in effect so that completed subassemblies, or where practical, the assembled amusement rides ordevices are inspected
21、prior to delivery.7.4 Non-conforming components found in 7.1, 7.2, or 7.3 shall be identified and evaluated. Disposition of the non-conformingcomponents shall be one of the following:7.4.1 The non-conforming component shall be scrapped or rejected, or7.4.2 The non-conforming component shall be alter
22、ed such that it cannot be used in the specific intended application for thecomponent, or7.4.3 The non-conforming component shall be reworked to bring it into compliance and re-inspected in conformance with 7.1,7.2, or 7.3 of this practice.7.4.4 The design of the non-conforming component shall be re-
23、evaluated in accordance with 6.2 of this practice, and thedrawing or documentation shall be modified or created to allow the component to be used as is.8. Welding8.1 Welding and welding procedures shall be in accordance with the appropriate American Welding Society (ANSI.AWS D1specification) or the
24、American Society of Mechanical Engineers, or other equivalent standard, and be performed by appropriatelycertified or qualified welders as required by the standard.8.2 Documentation for certified or qualified welders shall be maintained.9. Certification9.1 Before a manufacturer ships an amusement ri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF11932017STANDARDPRACTICEFORQUALITYMANUFACTUREANDCONSTRUCTIONOFAMUSEMENTRIDESANDDEVICES 娱乐 骑乘 设备

链接地址:http://www.mydoc123.com/p-534392.html