1、Designation: D 5079 02 (Reapproved 2006)Standard Practices forPreserving and Transporting Rock Core Samples1This standard is issued under the fixed designation D 5079; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of las
2、t revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope*1.1 These practices cover the preservation, transportation,storage, cataloging, retrieval, and post-test disposition of roc
3、kcore samples obtained for testing purposes and geologic study.1.2 These practices apply to both hard and soft rock, butexclude ice and permafrost.1.3 These practices do not apply to those situations in whichchanges in volatile gas components, contamination of the porefluids, or mechanical stress re
4、laxation affect the intended usefor the core.1.4 This practice offers a set of instruction for performingone or more specific operations. This document cannot replaceeducation or experience and should be used in conjunctionwith professional judgement. Not all aspects of this practicemay be applicabl
5、e in all circumstances. This ASTM standard isnot intended to represent or replace the standard of care bywhich the adequacy of a given professional service must bejudged, nor should this document be applied without consid-eration of a projects many unique aspects. The word “Stan-dard” in the title o
6、f this document means only that thedocument has been approved through the ASTM consensusprocess.1.5 This standard does not purport to address the safetyproblems associated with its use. It is the responsibility of theuser of this standard to establish appropriate safety and healthpractices and deter
7、mine the applicability of regulatory limita-tions prior to use.2. Referenced Documents2.1 ASTM Standards:2D 420 Guide to Site Characterization for Engineering De-sign and Construction PurposesD 653 Terminology Relating to Soil, Rock, and ContainedFluidsD2113 Practice for Rock Core Drilling and Sampl
8、ing ofRock for Site InvestigationD 4220 Practices for Preserving and Transporting SoilSamples2.2 API Standard:API RP-40 Recommended Practice for Core Analysis Pro-cedure33. Terminology3.1 Definitions of Terms Specific to This Standard: SeeTerminology D 653 for general definitions.3.2 Definitions of
9、Terms Specific to This Standard:3.2.1 critical caresamples which are fragile or fluid ortemperature sensitive. This protection level includes the re-quirements prescribed for routine and special care.3.2.2 routine carenon-sensitive, non-fragile samples forwhich only general visual identification is
10、necessary, andsamples which will not change or deteriorate before laboratorytesting.3.2.3 soil-like carematerials which are so poorly consoli-dated that soil sampling procedures must be employed toobtain intact pieces of core.3.2.4 special carefluid sensitive samples and those whichmust later be sub
11、jected to testing. Requirements for this levelof protection include those prescribed for routine care.4. Significance and Use4.1 The geologic characteristics and the intended use of therock core samples determine the extent and type of preserva-tion required. If engineering properties are to be dete
12、rmined forthe core, it must be handled and preserved in such a way thatthe measured properties are not significantly influenced bymechanical damage, changes in chemistry, and environmentalconditions of moisture and temperature, from the time that thecore is recovered from the core drill until testin
13、g is performed.Drill core is also the sample record for the subsurface geologyat the borehole location, and as such must be preserved forsome period of time, in some cases indefinitely, for futuregeologic study.4.2 These practices present a selection of curatorial require-ments which apply to the ma
14、jority of projects. The require-ments are given for a variety of rock types and project typesranging from small to large and from noncritical to critical.1These practices are under the jurisdiction ofASTM Committee D18 on Soil andRock and are the direct responsibility of Subcommittee D18.12 on Rock
15、Mechanics.Current edition approved May 1, 2006. Published June 2006. Originallyapproved in 1990. Last previous edition approved in 2002 as D 507902.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandar
16、ds volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American Petroleum Institute, 1220 L Street, Washington, DC20005.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700,
17、 West Conshohocken, PA 19428-2959, United States.Noncritical projects are those in which failure of an element orthe structure would result in negligible risk of injury andproperty loss, while there is great risk to property and life afterfailure of critical structures and projects. Guidance is give
18、n forthe selection of those specific requirements which should befollowed for a given project.5. Guide for Implementation5.1 A qualified person shall be assigned to have curatorialmanagement responsibility for a given project. This personshall be technically competent in the management of rock cores
19、amples and shall have a knowledge of the various end uses forthe cores and their associated preservation requirements. Thisresponsible person shall have the authority to implement therequirements selected from these practices. In some cases, heor she may also have to decide between competing uses fo
20、r thesame core.5.2 The responsible person shall select from Sections 6-11those requirements and procedures that should be applied forthe core from a particular project. The curatorial manager shallthen see that these procedures are implemented, and also seethat the records specified in Section 12 ar
21、e kept.5.3 The following factors should be considered when select-ing the curatorial requirements from Sections 6-11:5.3.1 Project requirements for use of the core range fromsimple ones, in which the only need is to identify and locate thevarious lithologic units, to complex and critical ones in whi
22、chdetailed property testing of the core is required for engineeringdesign. Priorities for multiple uses or different types of testsmust sometimes be established when available core lengths arelimited and when one use or test precludes another. Forexample, splitting a core for detailed geologic study
23、 preventslater strength testing, which requires an intact core.5.3.2 Mechanical property tests for structural design pur-poses should be performed on a core in its natural moisturestate, particularly if the rocks are argillaceous. Irreversiblechanges occur when such rocks are allowed to dry out, oft
24、enresulting in invalid design data. The initial moisture content ofsuch a core should therefore be preserved.5.3.3 Freezing of pore water in the core may reduce thestrength of the rock. The high temperature associated withunventilated storage sheds in summer, and temperatures alter-nating between ho
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD507920022006STANDARDPRACTICESFORPRESERVINGANDTRANSPORTINGROCKCORESAMPLES 保存 运输 样品 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-518812.html