1、Designation: C1075 10Standard Practices forSampling Uranium-Ore Concentrate1This standard is issued under the fixed designation C1075; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parenthes
2、es indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 These practices are intended to provide the nuclearindustry with procedures for obtaining representative bulksamples from uranium-ore concentrates (UOC) (
3、see Specifica-tion C967).1.2 These practices also provide for obtaining a series ofrepresentative secondary samples from the original bulksample for the determination of moisture and other testpurposes, and for the preparation of pulverized analyticalsamples (see Test Methods C1022).1.3 These practi
4、ces consist of a number of alternativeprocedures for sampling and sample preparation which havebeen shown to be satisfactory through long experience in thenuclear industry. These procedures are described in the follow-ing order.Stage Procedure SectionPrimary Sampling One-stage falling stream 4Two-st
5、age falling stream 5Auger 6Secondary Sampling Straight-path (reciprocating) 7Rotating (Vezin) 8, 9Sample Preparation 10Concurrent-drying 11-13Natural moisture 14-16Calcination 17, 18Sample Packaging 19Wax sealing 20Vacuum sealing 211.3.1 The primary and secondary sampling stages can beorganized in t
6、he following way:1.3.2 It is possible to combine the various elements of thesestages in different ways to give satisfactory results dependingon the agreed requirements of the contracting parties. For agiven stage, however, each procedure must be regarded as awhole. It is highly inadvisable to mix el
7、ements belonging todifferent procedures.1.4 These procedures do not include requirements forhealth, safety, and accountability. The observance of thesepractices does not relieve the user of the obligation to be awareof and to conform to all applicable international, federal, state,and local regulati
8、ons pertaining to processing, shipping, orusing uranium-ore concentrates. (Guidance is provided in CFR,10, Chapter 1.)1.5 The values stated in SI units are to be regarded as thestandard. The values given in parentheses are for informationonly.1.6 This standard does not purport to address all of thes
9、afety problems, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C967 Specification for Uraniu
10、m Ore ConcentrateC1022 Test Methods for Chemical and Atomic AbsorptionAnalysis of Uranium-Ore Concentrate2.2 Other Document:CFR 10 Nuclear Materials Licensing Code of Federal Regu-lations, Chapter 133. General Requirements3.1 Material Requirements:3.1.1 The uranium-ore concentrates shall be free-flo
11、wingand of a particle size not to exceed 6 mm (0.25 in.) or suchother limit agreed upon between contracting parties.3.1.2 The average moisture content shall not exceed 5.0 %weight of the uranium-ore concentrates.3.1.3 The material shall be shipped to the sampling plant in200-L (55-gal) standard stee
12、l drums that are fitted with steel1These practices are under the jurisdiction ofASTM Committee C26 on NuclearFuel Cycle and are the direct responsibility of Subcommittee C26.02 on Fuel andFertile Material Specifications.Current edition approved Jan. 1, 2010. Published February 2010. Originallyapprov
13、ed in 1986. Last previous edition approved in 2004 as C1075 93(2004).DOI: 10.1520/C1075-10.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Sevice at serviceastm.org. For Annual Book of ASTMStandardsvolume information, refer to the standards Document Summ
14、ary page onthe ASTM website.3Available from Superintendent of Documents, U.S. Government PrintingOffice, Washington, DC 20402.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.lids and equipped with suitable gasket, sealing rings, ands
15、ealing bungs (if applicable) to ensure weatherproofing. Thedrums shall be constructed so that the top of the drum is fullyopen when the lid is removed.3.1.4 The number of drums in a sampling lot shall notexceed 90 and the gross weight shall not exceed 45 metric tons(100 000 lb).3.1.5 Aminimum number
16、 of drums in a sampling lot may beestablished depending upon the sampling procedure used.3.2 Sampling Equipment Requirements:3.2.1 Care shall be taken in the design and operation of thesampling and all associated equipment to minimize the ex-changes of air between the atmosphere and the samplingsyst
17、em. For obvious safety reasons dust-carrying internal airmust be prevented from escaping the system. This is achievedby means of dust collectors. The latter, however, shall bedesigned and operated in such a way that a minimum amountof external air shall be allowed into the system. The purpose ofthis
18、 is (1) to limit the exchanges of moisture between theatmosphere and the UOC and (2) to prevent a size-selectivedusting. In any case, the amount of dust escaping the samplingoperations must be kept to a minimum.3.2.2 The scales for the gross and tare weights of the drumsshall be capable of reading t
19、o the nearest 0.2 kg (0.5 lb) andshall be fitted with a print-out or data processing system, orboth. They shall have a capacity of 600 kg (1300 lb). Theweigh scale shall be calibrated and adjusted if required, at thebeginning, middle, and end of each lot weighed. Test weightsshall be certified by a
20、statutory authority and shall be traceableto national or state standards.3.2.3 All sampling containers shall be clean and dry beforeusage.4. Primary Sampling, Falling Stream1 % In One Stage4.1 ScopeThe falling-stream procedure provides for re-moving a large number of increments of the material as it
21、 fallsfreely at a uniform, controlled rate. All of the material in a lotpasses through the system and is subject to incrementalsampling.4.2 Sampling Equipment Requirements:4.2.1 A schematic diagram of a typical falling-stream sam-pling facility is shown in Fig. 1. Subsequent procedures aredescribed
22、by reference to this equipment.4.2.2 The flow of material through the falling-stream systemshall be controlled by a rotary valve discharging to the hopperor pan of the first stage vibrating feeder.The rate of flow shouldnot exceed 4.5 3 102m3(1.6 ft3)/min and also should becontrolled so that the cut
23、ter obtains from the falling stream atleast 1 cut/2.8 3 102m3(1.0 ft3) of material.4.2.3 The first stage vibrating feeder should be adjusted sothat the depth of the material in the trough (pan) does notexceed 50 mm (2.0 in.), and that the entire vertical crosssection of the falling stream is totally
24、 intercepted by the cutterhead.4.2.4 The samplers should be designed and constructed asfollows:4.2.4.1 Approximately 1 % of the falling stream shall bediverted by the cutter. With small lots (for example, less than10 tons), however, a larger percentage may be implemented inorder to fulfill the requi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC10752010STANDARDPRACTICESFORSAMPLINGURANIUMORECONCENTRATE 精矿 取样 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-463250.html