ASTM C1075-1993(2004) Standard Practices for Sampling Uranium-Ore Concentrate《铀精矿取样标准规程》.pdf
《ASTM C1075-1993(2004) Standard Practices for Sampling Uranium-Ore Concentrate《铀精矿取样标准规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1075-1993(2004) Standard Practices for Sampling Uranium-Ore Concentrate《铀精矿取样标准规程》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 1075 93 (Reapproved 2004)Standard Practices forSampling Uranium-Ore Concentrate1This standard is issued under the fixed designation C 1075; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、 number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 These practices are intended to provide the nuclearindustry with procedures for obtaining representative bulksamples from uranium-ore
3、 concentrates (UOC) (see Specifica-tion C 967).1.2 These practices also provide for obtaeining a series ofrepresentative secondary samples from the original bulksample for the determination of moisture and other testpurposes, and for the preparation of pulverized analyticalsamples (see Test Methods
4、C 1022).1.3 These practices consist of a number of alternativeprocedures for sampling and sample preparation which havebeen shown to be satisfactory through long experience in thenuclear industry. These procedures are described in the follow-ing order.Stage Procedure SectionPrimary Sampling One-stag
5、e falling stream 4Two-stage falling stream 5Auger 6Secondary Sampling Straight-path (reciprocating) 7Rotating (Vezin) 8, 9Sample Preparation 10Concurrent-drying 11-13Natural moisture 14-16Calcination 17, 18Sample Packaging 19Wax sealing 20Vacuum sealing 211.3.1 The primary and secondary sampling sta
6、ges can beorganized in the following way:1.3.2 It is possible to combine the various elements of thesestages in different ways to give satisfactory results dependingon the agreed requirements of the contracting parties. For agiven stage, however, each procedure must be regarded as awhole. It is high
7、ly inadvisable to mix elements belonging todifferent procedures.1.4 These procedures do not include requirements forhealth, safety, and accountability. The observance of thesepractices does not relieve the user of the obligation to be awareof and to conform to all applicable international, federal,
8、state,and local regulations pertaining to processing, shipping, orusing uranium-ore concentrates. (Guidance is provided in CFR,10, Chapter 1.)1.5 The values stated in SI units are to be regarded as thestandard. The values given in parentheses are for informationonly.1.6 This standard does not purpor
9、t to address all of thesafety problems, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C 967
10、 Specification for Uranium Ore ConcentrateC 1022 Test Methods for Chemical and Atomic AbsorptionAnalysis of Uranium-Ore Concentrate2.2 Other Document:CFR 10 Nuclear Materials Licensing Code of Federal Regu-lations, Chapter 133. General Requirements3.1 Material Requirements:3.1.1 The uranium-ore conc
11、entrates shall be free-flowingand of a particle size not to exceed 6 mm (0.25 in.) or suchother limit agreed upon between contracting parties.3.1.2 The average moisture content shall not exceed 5.0 %weight of the uranium-ore concentrates.3.1.3 The material shall be shipped to the sampling plant in20
12、0-L (55-gal) standard steel drums that are fitted with steellids and equipped with suitable gasket and sealing rings to1These practices are under the jurisdiction of ASTM Committee C26 on NuclearFuel Cycle and are the direct responsibility of Subcommittee C26.02 on Fuel andFertile Material Specifica
13、tions.Current edition approved April 15, 1993. Published June 1993. Originallypublished as C 1075 86. Last previous edition C 1075 86.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Sevice at serviceastm.org. For Annual Book of ASTMStandardsvolume inform
14、ation, refer to the standards Document Summary page onthe ASTM website.3Available from Superintendent of Documents, U.S. Government PrintingOffice, Washington, DC 20402.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.ensure weatherpr
15、oofing. The drums shall be constructed so thatthe top of the drum is fully open when the lid is removed.3.1.4 The number of drums in a sampling lot shall notexceed 90 and the gross weight shall not exceed 45 metric tons(100 000 lb).3.1.5 A minimum number of drums in a sampling lot may beestablished
16、depending upon the sampling procedure used.3.2 Sampling Equipment Requirements:3.2.1 Care shall be taken in the design and operation of thesampling and all associated equipment to minimize the ex-changes of air between the atmosphere and the samplingsystem. For obvious safety reasons dust-carrying i
17、nternal airmust be prevented from escaping the system. This is achievedby means of dust collectors. The latter, however, shall bedesigned and operated in such a way that a minimum amountof external air shall be allowed into the system. The purpose ofthis is (1) to limit the exchanges of moisture bet
18、ween theatmosphere and the UOC and (2) to prevent a size-selectivededusting. In any case, the amount of dust escaping thesampling operations must be kept to a minimum.3.2.2 The scales for the gross and tare weighings of thedrums shall be capable of reading to the nearest 0.2 kg (0.5 lb)and shall be
19、fitted with a print-out or data processing system, orboth. They shall have a capacity of 600 kg (1300 lb). Theweigh scale shall be calibrated and adjusted if required, at thebeginning, middle, and end of each lot weighed. Test weightsshall be certified by a statutory authority and shall be traceable
20、to national or state standards.3.2.3 All sampling containers shall be clean and dry beforeusage.4. Primary Sampling, Falling Stream1 % In One Stage4.1 ScopeThe falling-stream procedure provides for re-moving a large number of increments of the material as it fallsfreely at a uniform, controlled rate
21、. All of the material in a lotpasses through the system and is subject to incrementalsampling.4.2 Sampling Equipment Requirements:4.2.1 A schematic diagram of a typical falling-stream sam-pling facility is shown in Fig. 1. Subsequent procedures aredescribed by reference to this equipment.4.2.2 The f
22、low of material through the falling-stream systemshall be controlled by a rotary valve discharging to the hopperor pan of the first stage vibrating feeder. The rate of flow shouldnot exceed 4.5 3 102m3(1.6 ft3)/min and also should becontrolled so that the cutter obtains from the falling stream atlea
23、st 1 cut/2.8 3 102m3(1.0 ft3) of material.4.2.3 The first stage vibrating feeder should be adjusted sothat the depth of the material in the trough (pan) does notexceed 50 mm (2.0 in.), and that the entire vertical crosssection of the falling stream is totally intercepted by the cutterhead.4.2.4 The
24、samplers should be designed and constructed asfollows:4.2.4.1 Approximately 1 % of the falling stream shall bediverted by the cutter. With small lots (for example, less than10 tonnes), however, a larger percentage may be implementedin order to fulfill the requirements of the secondary samplingstage.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC107519932004STANDARDPRACTICESFORSAMPLINGURANIUMORECONCENTRATE 精矿 取样 标准 规程 PDF

链接地址:http://www.mydoc123.com/p-463249.html