NAVY MIL-C-60872 A-1992 CARTRIDGE DELAY M271 ASSEMBLY《M271型炮筒延迟发射组件》.pdf
《NAVY MIL-C-60872 A-1992 CARTRIDGE DELAY M271 ASSEMBLY《M271型炮筒延迟发射组件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-60872 A-1992 CARTRIDGE DELAY M271 ASSEMBLY《M271型炮筒延迟发射组件》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、-. MIL-C-bOB72A 13 = 9999906 0507677 2 m! I INCH-POUND I MIL-Cd0872A 15 Januarv 1992 SUPERSEDING 25 April 1968 MIL-Cd0872(MU) MILITARY SPECIFICATION CARTRIDGE, DELAY, M271 ASSEMBLY is spec#cation is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. Th
2、is specification covers the requirements for the M271 Delay Cartridge (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise
3、specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification for MIL-A-8625 Anodic
4、Coatings, for Aluminum and Aluminum Alloy STANDARDS MILITARY MIL-STD-105 MIL-STD-109 Sampling Procedures and Tables for Inspection by Attributes Quality Assurance Terms and Definitions Beneficial comments (recommendations, additions, deletions) d any pertinent distribution is unlimited. 0 Provided b
5、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-60872A 13 E 9999906 0507678 4 E MIL-C-60872A MIL-STD-453 Inspection, Radiographic MIL-STD-810 Environmental Test Methods and Engineering Guidelines MS28741 Hose Assembly Detachable End Fitting Medium Pressu
6、re (unless otherwise indicated, copies of federal and military specifications and standards are available from Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 191 11-5094,) 2.1.2 Other Government documens, drawings, and publications. The following Government d
7、rawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS NAVAL ORDNANCE STATION (CAGE Codes 19200 and 19203) DL1055 1590 Cartridge, Delay, M271 Assembly 8864168 Box, Fiberboard (Inner), Pa
8、cking, Ammunition, For Cartridge, Delay: M27 1 8864169 Box, Fiberboard (Outer), Alternative, Packing, Ammunition, For Cartridge, Delay: M271 92 14156 Box, Packing, Ammunition, For Cartridge, Delay: M271 (Application for copies should be addressed to: Commanding Officer, Naval Ordnance Station, Data
9、Control Branch (Code 3720), Indian Head, MD 20640-5035.) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations un
10、less a specific exemption has been obtained. 3. REQUPREMENTS 3.1 First article. When specified in the contract or purchase order, a first article sample shall be subjected to first article inspection (see 4.4, 6.2, and 6.3). be manufactured in accordance with DL10551590 and all documents listed ther
11、eon. 3.2 Conformance to documents. The M271 Delay Cartridge covered by this specification shall 3.3 Materials. All materials used in the manufacture of the cartridges shall conform strictly to the specifications referred to on the respective drawings unless specific approval in writing covering a de
12、parture therefrom has been obtained from the cognizant Navy design activity prior to manufacture. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- , MIL-C-bOB72A 13 W 99999Ob 0507679 b W MIL-C-60872A When alternate materials or methods of manufactu
13、re are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.4 Components. 3.4.1 Primary components. For the purpose of this specification, the M42 Primer, M75 Delay Element, Igniter Charge and the cartridge propellant charge are considered primary components.
14、Only primary components from a single lot shall be used in a production lot of cartridges; however, one primary component production lot may be used in more than one cartridge production lot. 3.4.1.1 Primer. The primer shall conform to the applicable drawing and reference specification. Only primers
15、 from lots manufactured within the last 24 months or recertified within the last 12 months shall be used in these units. Prior to assembly into a cartridge, the primer shall be radiographically examined for defects as specified in 4.7.1. 3.4.2 Hardness. The hardness of each component part shall be i
16、n accordance with the applicable drawing (see 4.7.2). 3.4.3 Protective finish. The finish of each component part shall be in accordance with MIL-A-8625 and the applicable drawing (see 4.7.3). 3.5 Assembly. 3.5.1 Radiographic examination. Each cartridge assembly shall be radiographically examined for
17、 defects (see 4.7.4). 3.5.2 Airtightness. Each assembled cartridge shall exhibit no air leakage greater than 1 x standard cubic centimeters per second (see 4.7.5) at a 14.7 psia pressure differential. 3.5.3 Vibration. The assembled cartridge shall withstand vibration as prescribed in MIL-STD-810, Me
18、thod 514.3, Te however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material. 4.1.2 Quality assurance terms and definitions. Reference shall be made to MIL-STD-109 to define the quality assurance te
19、rms used. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-C-bO72A 13 W 999990b 0507b1 4 MIL-C-60872A 4.1.3 Inspections. Inspections shall be in accordance with MIL-A-2550 and MIL-STD-453. 4.2 Classification of inspections. The inspection requ
20、irements specified herein are classified as follows: a. b. First article inspection (see 4.4) Quality conformance inspection (see 4.5) 4.3 Inspection conditions. Unless otherwise specified in the contract or purchase order (see 6.2), inspection conditions shall be as follows: a. Temperature: Room am
21、bient 20“ to 25“ C (68“ to 77“ F) b. Altitude: Sea level c. Humidity: 50 percent relative, maximum d. Atmospheric: 14.7 psia 4.4 First article inspection. At the beginning of regular production, the contractor shall submit a first article sample to a Government approved facility for evaluation. The
22、sample shall consist of 21 assembled cartridges for ballistics testing including 12 for vibration tests, 5 assembled cartridges for sealant tests, 10 sets of unassembled components for dimensional and visual examination, and the quantity specified in accordance with 4.4.2, Le., cartridges assembled
23、without the igniter and propellant charge for primer sensitivity test. The first article sample shall be manufactured using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packaging and packing, shall be the same as used for
24、regular production and shall be obtained from the same source of supply. When it becomes necessary to make a change in either the primer, propellant, or igniter lot after initial production, 12 assembled cartridges from the first production lot thereafeer shall be tested in accordance with 4.7.7. Th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC60872A1992CARTRIDGEDELAYM271ASSEMBLYM271 炮筒 延迟 发射 组件 PDF

链接地址:http://www.mydoc123.com/p-977922.html