1、This document is restricted and may not be sent outside Navistar, Inc. or reproduced without permission from Corporate Technical Standards. Suppliers are required to assume all patent liability. 2016 by Navistar, Inc. OCTOBER 2016 Page 1 of 4 NAVISTAR, INC. Material, Parts, and Process Specification
2、s (MPAPS) NUMBER: MPAPS P-9523 Former Designation: TMS-9523 TITLE: Development and Quality Control Procedures for SMC FRP Parts CURRENT REV No.: 1610 DATE: Oct. 2016 WRITTEN/EDITED BY: L. Xu APPROVED BY: R. Goluch SUPERSEDES: Rev. D August 2006 PRINTED COPIES OF THIS DOCUMENT MUST BE VERIFIED FOR CU
3、RRENT REVISION This specification may involve hazardous materials, equipment, and procedures. This specification does not purport to address all of the safety issues associated with its use. The user is responsible to consult appropriate safety and health practices and to determine the applicability
4、 of regulatory limits prior to use. 1.0 APPLICATION This specification is applied to aid in controlling procedures used to develop critical parts molded from SMC reinforced plastics specified as per Navistar MPAPS D-22. Parts, such as tilt hoods, cowl panels, and heater cases, are typical applicatio
5、ns. The objective of this specification is to control material flow, and the physical and mechanical properties developed in the prototype parts and insure reproducibility between the prototype, qualification, and production SMC/FRP parts. 2.0 SCOPE This specification covers the production process d
6、ata, test analysis data, and sample parts that the molder is required to submit. Requirements for Quality Control of production parts are also covered. 2.1 Restricted Chemical Substances Effective January 1, 2007, all product supplied to the requirements of this specification must comply with the re
7、quirements of the MPAPS B-50 specification. 3.0 REFERENCE DOCUMENTS Unless otherwise specified, the latest issue of all referenced standards shall apply. The following standards, specifications and regulations are referenced in this specification. Quality System Standard ISO 9001 or TS-16949 NAVISTA
8、R MPAPS D-22 International IQR Quality Standard NAVISTAR MPAPS G-9012 CFR Title 29, Part 1910 NAVISTAR MPAPS DT-14 NAVISTAR MPAPS B-50 4.0 GENERAL REQUIREMENTS Before production approval is granted, all parts shall be functionally tested by the Navistar Materials Group. The molder shall supply parts
9、 for such tests based on materials and manufacturing processes that can be routinely used on a production basis. The minimum process and test data to be supplied with test/prototype parts is indicated below. 4.1 SMC Material A complete description of the SMC material(s) used in the part shall be pro
10、vided. This shall include the molders compound number; the type and percentage by weight of the resin, glass, and filler; and the viscosity of the system. Tolerances or process control limits for these factors shall be included. NUMBER: MPAPS P-9523 TITLE: Development and Quality Control Procedures
11、for SMC-FRP Parts REVISION: 1610 This document is restricted and may not be sent outside Navistar, Inc. or reproduced without permission from Corporate Technical Standards. Suppliers are required to assume all patent liability. 2016 by Navistar, Inc. OCTOBER 2006 Page 2 of 4 4.1.1 SMC Material Prope
12、rties Physical property data for the SMC material(s) (flat panel data) will be submitted. Specific details of properties to be reported will be agreed upon between Navistar Materials Engineering and the supplier. 4.2 Charge Pattern A drawing of the charge pattern showing the number of plies, the cha
13、rge weight, and the dimensions of the charge, will be provided. 4.3 Molding Conditions A description of the molding conditions will be provided. This shall include the mold temperatures (core and cavity), press closure speed, cycle time (time mold is closed) and tonnage exerted on the mold during cl
14、osing. 4.4 Glass Pattern Photographs of a burn-off or an X-ray of the entire part clearly showing glass pattern will be provided. Identification of severe flow or knit line conditions shall be shown. 4.5 Molded Part Properties Physical properties of the molded part as per Navistar MPAPS D-22, at loc
15、ations indicated on the part drawing will be provided. 4.6 Functional Testing Functional testing will be performed by Navistar Materials Group. If the functional tests show deficiencies in the molded parts, the molder will be asked to alter or modify the material and/or production process. If materi
16、al and/or process changes are made, the molder shall resubmit new parts for retesting and provide new process/test data as required by Section 4 of this specification. 4.7 Class A Exterior Surfaces Parts considered to be Class A, produced with IMC as per MPAPS G-9012, shall have a surface reading of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVISTARMPAPSP95232016DEVELOPMENTANDQUALITYCONTROLPROCEDURESFORSMCCFRPPARTSPDF

链接地址:http://www.mydoc123.com/p-963080.html