FORD WSS-M96D33-A9-2017 HOSE NON-REINFORCED RUBBER FUEL RESISTANT CONDUCTIVE LOW PERMEATING NBR TUBE THV NBR CSM COVER TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD WSS-M96D33-A9-2017 HOSE NON-REINFORCED RUBBER FUEL RESISTANT CONDUCTIVE LOW PERMEATING NBR TUBE THV NBR CSM COVER TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD WSS-M96D33-A9-2017 HOSE NON-REINFORCED RUBBER FUEL RESISTANT CONDUCTIVE LOW PERMEATING NBR TUBE THV NBR CSM COVER TO BE USED WITH FORD WSS-M99P1111-A .pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 2 2017 02 27 Revised See summary of revisions A. Reaume/G. Kowalski, NA 1999 06 25 Activated C. Thomas, NA Controlled document at www.MATS Copyright 2017, Ford ; Global Technologies, LLC Page 1 of 5 HOSE, NON-REINFORCED RUBBER, FUEL RESI
2、STANT, WSS-M96D33-A9 CONDUCTIVE, LOW PERMEATING, NBR TUBE/THV/NBR/CSM COVER 1. SCOPE This specification defines a conductive, non-reinforce multi-layer composite hose with enhanced low permeation and good resistance to fuel blends containing methanol. The hose shall consist of an inner layer of NBR
3、or HNBR, a THV barrier layer, an NBR layer and a CSM cover. 2. APPLICATION This specification was released originally for fuel tank vent hoses and for vapor management hoses. These constructions are not for fuel line applications. Vapor management applications may be non-conductive but fill and fill
4、 vent applications must be conductive. 3. REQUIREMENTS 3.1 APPROVED SOURCES This specification requires the use of approved sources. Only the sources identified on the Ford Approved Source List (ASL) can be used when this specification is listed on the drawing, CAD file, or other documents. The list
5、 of approved sources is located within Ford at or available externally through a Ford Materials Engineer. 3.2 CONDITIONING AND TEST CONDITIONS All test values are based on material conditioned for not less than 24 h prior to testing in a controlled environment of 23 +/- 2 C and 50 +/- 5% relative h
6、umidity. Testing of the material should occur in the conditioning environment or soon after removal. 3.3 INFRARED SPECTROPHOTOMETRY AND/OR THERMAL ANALYSIS IR spectra and thermograms from initial material approval shall constitute the reference standard and shall be kept on file at the designated ma
7、terial laboratory. The material supplier shall ensure that all future material supplied to the specification shall produce IR spectra and thermograms that correspond to the reference standard when tested under the same conditions. 3.4 INITIAL QUALIFICATION Suppliers seeking approval to this specific
8、ation must meet the initial qualification processes that include evaluating materials and constructions according to the applicable Fuel System Design Specification (SDS) and individual Design Verification Methods (DVM). ENGINEERING MATERIAL SPECIFICATION WSS-M96D33-A9 Copyright 2017, Ford Global Te
9、chnologies, LLC Page 2 of 5 3.5 LIMITATIONS Vapor lines can be either conductive or non-conductive. Liquid caring lines must be conductive. This material does not contain UV stabilizers, long term exposure to direct sunlight will cause cracking. All components exposed to direct sunlight must contain
10、 UV stabilizers. 3.6 HOSE CONSTRUCTION The hose shall consist of a smooth bore, electrically conductive inner layer of NBR or, HNBR , a THV barrier layer, an NBR layer and an CSM cover. 3.7 ADDITIONAL REQUIREMENTS Requirements beyond those explicitly stated in this document and the material specific
11、ation may be specified on the Engineering drawing, Engineering specification (ES), performance specification, System Design Specification (SDS) and/or Attribute Requirement List (ARL). 3.8 PERFORMANCE CRITERIA Materials approved to this specification must also be approved to the fuel system polymeri
12、c materials performance standard: WSS-M98P14-A2/A6 Complete Construction 3.8.1 Burst Pressure (ASTM D380) Hose Size, (Approximate I.D.) Below 9.53 mm 1.0 MPa min 9.53 15.87 mm 0.68 MPa min 15.87 mm and larger 0.34 MPa min 3.8.2 Compression Set 75 %, max (FLTM BP 108-6, 70 h at 100oC, 25% compression
13、) 3.8.3 Electrical Resistance Surface resistivity (SAE J2260) less than or equal to 1 x 106 Ohms 3.8.4 Vacuum Collapse (SAE J30R11) Test Method: For straight hose, a 1 m length of hose or the assembly shall be held in a straight line. On preformed parts, the vacuum collapse test shall be performed o
14、n the finished part. No diameter shall decrease by more than 20 % during the application of vacuum for a minimum of 15 seconds and not more than 60 seconds. Hose sizes as listed below shall be subjected to the corresponding vacuum pressure: Nominal hose ID 19.0 mm 10 kPa 20 % max ENGINEERING MATERIA
15、L SPECIFICATION WSS-M96D33-A9 Copyright 2017, Ford Global Technologies, LLC Page 3 of 5 Complete Construction 3.8.5 Ovality 75 %, min (Not applicable to hoses with I.D. greater than 16.28 mm, unless otherwise specified on engineering drawing) Ovality = I.D. minimum x 100 I.D. maximum 3.8.6 Resistanc
16、e to Kinking Ball must pass freely (SAE J30, para 6.20) 3.8.7 Flammability Resistance, Cover Stock Only Self- extinguishing (ISO 3795) within 60 seconds 3.8.8 Hose Identification The colored tracer cord in the reinforcement of the hose may be used for source identification. The color shall be determ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSSM96D33A92017HOSENONREINFORCEDRUBBERFUELRESISTANTCONDUCTIVELOWPERMEATINGNBRTUBETHVNBRCSMCOVERTOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-754111.html