ITU-T Q 783-1988 TUP TEST SPECIFICATION《电话用户部分(TUP)测试规程》.pdf
《ITU-T Q 783-1988 TUP TEST SPECIFICATION《电话用户部分(TUP)测试规程》.pdf》由会员分享,可在线阅读,更多相关《ITU-T Q 783-1988 TUP TEST SPECIFICATION《电话用户部分(TUP)测试规程》.pdf(86页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 1 TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU30%#) removal of blocking from one end1.3.2.4 Interruption for FDM circuits1.4 Continuity check test call* 1.4.1 CCTC received: successful* 1.4.2 CCTC sent: successful1.4.3 CCTC received: unsuccessful1.4.4 CC
2、TC sent: unsuccessful1.5 Receipt of unreasonable signalling information1.5.1 Received2 Normal call set-up2.1 Both way circuit selection* 2.1.1 IAM sent by controlling SP* 2.1.2 IAM sent by non controlling SP2.2 Called address sending* 2.2.1 “en bloc“ operation* 2.2.2 Overlap operation2.3 Successful
3、call set-up2.3.1 Ordinary call (with various ACM and ANS)* 2.3.2 Call switched via satellite* 2.3.3 Test for echo suppressor call set-up* 2.3.4 Blocking and unblocking during a call (initiated)* 2.3.5 Blocking and unblocking during a call (received)3 Normal call release* 3.1 Calling party clears: be
4、fore ACM* 3.2 Calling party clears: before ANS* 3.3 Calling party clears: after ANS* 3.4 Calling party clears: after CLEAR BACK* 3.5 Reanswer4 Unsuccessful set-up4.1 SEC4.1.1 SEC receivedFascicle VI.9 - Rec. Q.783 34.1.2 SEC sent4.2 CGC4.2.1 CGCreceived4.2.2 CGC sent4.3 NNC4.3.1 NNC received4.3.2 NN
5、C sent4.4 ADI* 4.4.1 ADI received* 4.4.2 ADI sent4.5 CFL4.5.1 CFL received4.5.2 CFL sent4.6 SSB* 4.6.1 SSB received* 4.6.2 SSB sent4.7 UNN* 4.7.1 UNN received* 4.7.2 UNN sent4.8 LOS4.8.1 LOS received4.8.2 LOS sent4.9 SST4.9.1 SST received4.9.2 SST sent4.10 ACB4.10.1 ACB received4.10.2 ACB sent4.11 D
6、PN4.11.1 DPN received4.11.2 DPN sent4 Fascicle VI.9 - Rec. Q.7835 Abnormal situation during a call5.1 Inability to release in response to a CLF5.2 Inability to release in response to a backward signal5.3 Timers5.3.1 T25.3.2 T35.3.3 T45.3.4 T55.3.5 T6* 5.3.6 ANS signal not received (Q.118 Timer)* 5.3
7、.7 Delay in clearing by calling party (Q.118 Timer)5.4 Reset of circuits during a call5.4.1 Of an outgoing circuit5.4.2 Of an incoming circuit5.5 Receipt of unreasonable signalling information5.5.1 (Now test No. 1.5.1)fs 5.5.2 Received5.6 Interruption of signalling relation6 Special call set-up6.1 C
8、ontinuity check call* 6.1.1 COT applied on an outgoing circuit* 6.1.2 COT applied on previous circuit* 6.1.3 COT on a satellite circuit6.1.4 Calling party clears during a COT* 6.1.5 Delay of through connect6.1.6 COT unsuccessful6.1.7 COT received on incoming circuit6.2 Automatic repeat attempt6.2.1
9、Dual seizure6.2.2 Circuit reset6.2.3 Reception of unreasonable signal informationFascicle VI.9 - Rec. Q.783 5* 6.2.4 Blocking of the circuit6.2.5 Continuity check failure6.3 Dual seizure6.3.1 Dual seizure for controlling side7 Supplementary servicesfs 7.1 CUGfs 7.2 User access to the calling line id
10、entityfs 7.3 User access to the called line identityfs 7.4 Redirection of callsfs 7.5 CCBSfs 7.6 Network access to calling line identity8 Performance testsNote - For further study.6 Fascicle VI.9 - Rec. Q.783TUP LEVEL 4 TEST SPECIFICATIONTEST NUMBER : 1.1REFERENCE :TITLE : Circuit supervisionSUBTITL
11、E : Non-allocated circuitsPURPOSE : To verify that on receipt of a CIC relating to a circuit which does not exist, SP A will discard the message andalert maintenance personnelPRE-TEST CONDITIONS : Arrange the data in signalling point B such that the CIC identifies a circuit that does not existbetwee
12、n SP A and SP BCONFIGURATION : 1 TYPE OF TEST : VAT and CPT TYPE OF SP : SPEXPECTED MESSAGE SEQUENCE :SP A SP B- IAMTEST DESCRIPTION1.2.3.4.Arrange for SP B to send an initial address message.Record the message sequence using a signal monitor.CHECK A: IS THE CIRCUIT IDLE ? CHECK B: WAS THE MESSAGE S
13、EQUENCE AS SHOWN ABOVE? CHECK C: WAS THE INDICATION GIVEN TO THE MAINTENANCE PERSONNEL? Fascicle VI.9 - Rec. Q.783 7TUP LEVEL 4 TEST SPECIFICATIONTEST NUMBER : 1.2.1REFERENCE : Q.724 1.15.1TITLE : Reset of circuitsSUBTITLE : RSC received on an idle circuitPURPOSE : To verify that on receipt of a res
14、et circuit signal SP A will respond by sending a release guard signalPRE-TEST CONDITIONS : The circuit is idleCONFIGURATION : 1 TYPE OF TEST : VAT TYPE OF SP : SPEXPECTED MESSAGE SEQUENCE :SP A SP B- RSCRLG -TEST DESCRIPTION1.2.3.Arrange for SP B to send a reset-circuit signal.Record the message seq
15、uence using a signal monitor.CHECK A: IS THE CIRCUIT IDLE ? CHECK B : WAS THE MESSAGE SEQUENCE AS ABOVE ? 8 Fascicle VI.9 - Rec. Q.783TUP LEVEL 4 TEST SPECIFICATIONTEST NUMBER : 1.2.2REFERENCE : Q.724 1.15.1TITLE : Reset of circuitsSUBTITLE : RSC sent on an idle circuitPURPOSE : To verify that SP A
16、is able to generate reset-circuit signalPRE-TEST CONDITIONS : The circuit is idleCONFIGURATION : 1 TYPE OF TEST : VAT TYPE OF SP : SPEXPECTED MESSAGE SEQUENCE :SP A SP BRSC - RLGTEST DESCRIPTION1.2.3.Arrange for SP A to send a reset-circuit signal.Record the message sequence using a signal monitor.C
17、HECK A: IS THE CIRCUIT IDLE ? CHECK B: WAS THE MESSAGE SEQUENCE AS ABOVE ? Fascicle VI.9 - Rec. Q.783 9TUP LEVEL 4 TEST SPECIFICATIONTEST NUMBER: 1.2.3REFERENCE : Q.724 1.15.2TITLE : Reset of circuitsSUBTITLE : Group reset receivedPURPOSE : To verify that on receipt of two circuit group reset messag
18、e within a period of 5 seconds, SP A will respondby sending a circuit reset acknowledge messagePRE-TEST CONDITIONS :CONFIGURATION : 1 TYPE OF TEST : VAT TYPE OF SP : SPEXPECTED MESSAGE SEQUENCE :SP A SP B- GRS- GRSGRA -TEST DESCRIPTION1.2.3.Arrange for SP B to send two circuit group reset messages w
19、ithin a period of 5 seconds.Record the message sequence using a signal monitor.CHECK A : IS THE CIRCUIT IDLE ?CHECK B : WAS THE MESSAGE SEQUENCE AS ABOVE ?.10 Fascicle VI.9 - Rec. Q.783TUP LEVEL 4 TEST SPECIFICATIONTEST NUMBER : 1.2.4REFERENCE : Q.724 1.15.2TITLE : Reset of circuitsSUBTILE : Group r
20、eset sentPURPOSE : To verify that SP A is able to generate a circuit group reset messagePRE-TEST CONDITIONSCONFIGURATION : 1 TYPE OF TEST : VAT TYPE OF SP : SPEXPECTED MESSAGE SEQUENCE :SP A SP BGRS -GRS - GRATEST DESCRIPTION1.2.3.Arrange for SP A to send two circuit group reset messages within a pe
21、riod of 5 seconds.Record the message sequence using a signal monitor.CHECK A : IS THE CIRCUIT GROUP IDLE ?CHECK B: WAS THE MESSAGE SEQUENCE AS ABOVE ?.Fascicle VI.9 - Rec. Q.783 11TUP LEVEL 4 TEST SPECIFICATIONTEST NUMBER : 1.3.1.1REFERENCE : Q.724 5.2TITLE : Group blocking/unblockingSUBTITLE : HGB
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTQ7831988TUPTESTSPECIFICATION 电话 用户 部分 TUP 测试 规程 PDF

链接地址:http://www.mydoc123.com/p-802278.html