ITU-T Q 707-1988 TESTING AND MAINTENANCE《测试和维护-NO 7信令系统的准则(第11研究组)》.pdf
《ITU-T Q 707-1988 TESTING AND MAINTENANCE《测试和维护-NO 7信令系统的准则(第11研究组)》.pdf》由会员分享,可在线阅读,更多相关《ITU-T Q 707-1988 TESTING AND MAINTENANCE《测试和维护-NO 7信令系统的准则(第11研究组)》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 1 TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU30%#) these are not specified in this Recommendation.In case the signalling link test (SLT) is applied while the signalling link is in service the signalling link testmessage is sent at regular intervals T2 (
2、see 5.5). The testing of a signalling link is performed independently from eachend.The ability to send a signalling test acknowledgement message, defined below, must always be provided at asignalling point.The signalling point initiating the tests transmits a signalling link test message on the sign
3、alling link to be tested.This message includes a test pattern which is chosen at the discretion of the end initiating the test. After receiving asignalling link test message, a signalling point responds with a signalling link test acknowledgement message on thesignalling link identified by the SLS c
4、ontained in the signalling link test message. The test pattern included in thesignalling link test acknowledgement message is identical to the test pattern received.The signalling link test will be considered successful only if the received signalling link test acknowledgementmessage fulfills the fo
5、llowing criteria:2 Fascicle VI.7 - Rec. Q.707a) the SLC identifies the physical signalling link on which the SLTA was received.b) the OPC identifies the signalling point at the other end of the link.c) the test pattern is correct.In the case when the criteria given above are not met or a signalling
6、link test acknowledgement message is notreceived on the link being tested within T1 (see 5.5) after the signalling link test message has been sent, the test isconsidered to have failed and is repeated once. In the case when also the repeated test fails, the following actions have tobe taken:- SLT ap
7、plied on activation/restoration, the link is put out of service, restoration is attempted and amanagement system must be informed.- SLT applied periodically, for further study.The formats and codes of signalling link test and signalling link test acknowledgement messages used forsignalling link test
8、ing are specified in 5.4.3 Fault locationFault location operations, employing particular manual or automatic internal test equipment are left to thediscretion of the individual signalling points.Tests requiring provision of messages are for further study. See 3.4 Signalling network monitoringIn orde
9、r to obtain information on the status of the signalling network, monitoring of the signalling activity mustbe provided (for example measures of the signalling load on the signalling data link). The specification of such meansand procedures is contained in Recommendations Q.791 and Q.795.5 Formats an
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTQ7071988TESTINGANDMAINTENANCE 测试 维护 NO7 系统 准则 11 研究 PDF

链接地址:http://www.mydoc123.com/p-801991.html