1、UDC 621.86.061.1 : 620.1 DEUTSCHE NORM December 1989 Lifting hooks Technical delivery conditions for forged hooks I 15404 Part 1 Lasthaken fur Hebezeuge; technische Lieferbedingungen fr geschmiedete Lasthaken Supersedes March 1979 edition. In keeping with current practice in standards published by t
2、he International Organization for Standardization (ISO), a comma has been used throughout as the decimal marker. This standard includes safety requirements within the meaning of the Gertesicherheitsgesetz (Equipment Safety Law). This standard has been prepared in cooperation with the Hauptverband de
3、r gewerblichen Berufsgenossenschaften e. V., Zen- traIsteIIe fr Unfallverhutung und Arbeitsmedizin (Federation of Industrial Employers Liability Insurance Associations, Central Office for Accident Prevention and Occupational Medicine), Bonn. Start of validity This standard is valid from 1 December 1
4、989. 1 Field of application This standard applies to forged hooks for use on lifting appli- ances. Such hooks include point hooks, ramshorn hooks, claws, shackles for laminated hooks, etc. It is recommended that laminated hooks of at least 20t capacity be used where service temperatures are very hig
5、h (e.g. for carrying molten materials). 2 Scope This standard specifies safety requirements intended to improve the reliability of forged hooks (hooks, for short) and describes the methods of test. 3 Requirements 3.1 Material Hook material shall comply with the specifications given in DIN 15400. Str
6、ength class M or P hooks (ci. DIN 15400) shall be made from fine grain steel complying with the basic series in DIN 17103 (cf. Amendments). The steels listed in DIN 17103 are insusceptible to ageing. Should service temperatures for hooks not conform to the range of temperatures given in DIN 17103, i
7、t may be agreed that, for temperatures over 25OoC, steels belonging to the high temperature series or, for temperatures below -2OoC, steels belonging to the low temperature series be used (also specified in DIN 17103). 3.2 Forging Hooks in the unmachined condition shall be produced to the dimensions
8、 specified in the relevant dimensional standards and comply with the technical delivery conditions given in DIN 7521. Where any production-related tolerances are not specified in the relevant standards, the dimensions of hook zones subject to wear shall meet or exceed the requirements regarding acce
9、ptable wear as described in subclause 5.3 of the March 1979 edition of DIN 15405 Part 1. Unmachined hook components shall be worked hot, such that the deformation ratio in the zone of largest cross section is equal to at least 3 : 1. 3.3 Heat treatment Afier being forged, hooks shall be heat treated
10、 in such a way that the required notched bar impact energy is attained. The heat treatment method used shall be stated on the inspection certificate (cf. clause 5). 3.4 Surface condition After heat treatment, hooks shall be descaled and shall not exhibit surface defects likely to affect safe usage.
11、3.5 Internal defects Hooks shall be free of internal defects likely to affect safe usage. 3.6 Additional requirements Welding shall not be carried out on any part of the hook. Excepted from this requirement are drop forged hooks for mass-produced lifting appliances, where the following shall be perm
12、itted: a) a welded joint between hookshankand lifting eye on No. 5 hooks or lower, belonging to groups 1 A, and 1 B, as in DIN 15400; b) a tackweld between shankend and nut to prevent twisting on No. 1 hooks, provided the load is accommodated by the thread and not by the weld. 3.7 Marking For the pu
13、rposes of demonstrating compliance with the specifications of this standard, that part of the hook indicated in DIN 15401 Part 1 or 2 or in DIN 15402 Part 1 or 2 shall be clearly and permanently marked with the following informa- tion: line 1 : the manufacturers mark; line 2: the symbol denoting str
14、ength class, followed by the lifting hook number, as outlined in DIN 15400; line 3: any marking required by the purchaser, with the item number attached if hooks are supplied as part of a batch, e.g. 367.1 (required only on hand forged hooks); line 4: the DIN symbol. The information for lines 1.2, a
15、nd 4 above need not be marked in separate lines on drop forged hooks. Continued on pages 2 to 4 uth Verlag GrnbH. Berlin. has the exclusive right of sale for German Standards (DIN-Normen). DIN 15404 Part 1 EnaI. Price arou0 12.90 - -, Sales No.0105 Page 2 DIN 15404 Part 1 4 Testing The characteristi
16、cs in clause 3 shall be tested in accordance with subclauses 4.1 to 4.5, and a certificate issued, using the specimen form on page 4 as a basis. 4.1 Chemical composition The chemical composition shall be established as specified in DIN 17103. The values of the actual chemical composition may be base
17、d on the cast analysis and be obtained from inspection certi- ficate B (defined in DIN 50049). submitted by the steel manu- facturer, provided the forging works confirms the correctness of the certificate. 4.2 Mechanical properties The mechanical properties shall be tested as described in DIN 17 103
18、, in conjunction with DIN 50 145 (tensile test) and DIN 50 115 (notched bar impact test). After the final heat treatment, the required number of speci- mens shall be taken from the heat treatment batch, in the lon- gitudinal direction, preferably from the outer third of the shank cross section. The
19、size of a batch of hooks up to No. 40 is that number of hooks which is made from the same raw material (cast, billet or cog) and which undergoes the same heat treatment, the maximum mass of a heat treatment batch being 3 t. For No. 50 hooks or higher, the set of specimens shall be taken from one hoo
20、k only. 4.3 Dimensional accuracy Acheck shall be made to establish that the actual dimensions of unmachined components and finished hooks lie within the limits of size specified, or that they comply with the require- ments given in subclause 3.2. Finished hooks which incorporate a nut shall be check
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DIN1540411989LIFTINGHOOKSTECHNICALDELIVERYCONDITIONSFORFORGEDHOOKS 起重机 吊钩 锻制 交货 技术 条件 PDF

链接地址:http://www.mydoc123.com/p-653418.html