NF P15-471-7-2008 Methods of testing cements - Part 7 methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf
《NF P15-471-7-2008 Methods of testing cements - Part 7 methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf》由会员分享,可在线阅读,更多相关《NF P15-471-7-2008 Methods of testing cements - Part 7 methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、NF EN 196-7juillet 2008Ce document est usage exclusif et non collectif des clients Saga Web.Toute mise en rseau, reproduction et rediffusion, sous quelque forme que ce soit,mme partielle, sont strictement interdites.This document is intended for the exclusive and non collective use of Saga Web custo
2、mers.All network exploitation, reproduction and re-dissemination,even partial, whatever the form (hardcopy or other media), is strictly prohibited.Saga Web Pour SHANGHAI INTERNAT SCIENCE b) Object and field of application is now re-titled Scope; c) References not normatively listed within the docume
3、nt have been deleted from clause 2; d) Clause 3.8 reference to certification regulations has been deleted as this is now covered in EN 197-2 and Annex ZA of EN 197-1:2000; e) Clause 4.2 (previously 4.1) reference to additional equipment has been deleted as it is now covered in EN 197-2 and in guidan
4、ce document PD CR 14245; f) Reference to responsibility regarding sampling (previously clause 4.3) has been deleted as it is now covered in EN 197-2 g) Clause 5 restriction to sampling whilst fluidized has been deleted since many modern samplers operate satisfactorily in such circumstances; h) Claus
5、e 6 (previously 6.7) reference to sampling from bag filling machines has been deleted as being in conflict with the requirements in many specifications for only filled bags to be sampled; According to the CEN/CENELEC Internal Regulations, the national standards organizations of the following countri
6、es are bound to implement this European Standard: Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain,
7、 Sweden, Switzerland and the United Kingdom. EN 196-7:2007 (E) 41 Scope This European Standard describes the equipment to be used, the methods to be followed and the provisions for taking samples of cement, representative of given lots for testing, to assess the quality of products prior to, during
8、or after delivery. The provisions of this standard are only applicable when samples of cement are: a) required for evaluating the conformity of a cement at any time with a standard; or b) requested for checking a delivery or a lot with a standard, the provisions of a contract or the specification in
9、 an order. The standard is applicable to the taking of samples of all types of cements defined by European Standards for cements whether they are: c) contained in silos; d) contained in bags, canisters, drums or any other packages; e) transported in bulk in road vehicles, railway wagons, ships, etc.
10、 NOTE The requirements of this standard can also, by agreement between the parties, be followed for acceptance inspections for all non-standardized hydraulic binders. 2 Normative references Not applicable. 3 Terms and Definitions For the purpose of this European Standard, the following terms and def
11、initions apply. 3.1order quantity of cement covered by a single requisition placed with a single manufacturer, factory, depot or dispatching centre. It may consist of one or more consignments spread over a period of time 3.2consignment quantity of cement delivered at a given time by a single manufac
12、turer, factory, depot or dispatching centre. It may consist of one or more lots 3.3lotquantity of cement produced under conditions presumed uniform NOTE After specified tests this quantity is regarded as a whole as meeting or not meeting a standard, the provisions of a contract or the specification
13、in an order. 3.4increment quantity of cement taken in a single operation of the sampling equipment used EN 196-7:2007 (E) 53.5sample quantity of cement taken at random, or in accordance with a sampling plan, from a larger quantity (silo, stock of bags, wagons, trucks, etc.) or from a fixed lot, rela
14、ting to the intended tests. A sample may consist of one or more increments3.6spot sample sample taken within a short period of time and at a fixed point from within a larger quantity, relating to the intended tests. It can be obtained by combining one or more immediately consecutive increments3.7com
15、posite sample homogeneous mixture of spot samples taken: a) at different points; or b) at different times; from a larger mass of the same cement, obtained by thoroughly mixing the combined spot samples and, if necessary, reducing the size of the resulting mixture 3.8laboratory sample sample prepared
16、 by thoroughly mixing and if necessary reducing from a larger sample (spot or composite sample) and intended for use by laboratories undertaking the tests 3.9sample for retest sample which is to be kept for possible subsequent tests in the event of the results from tests carried out on laboratory sa
17、mples being in doubt or disputed 3.10retained sample sample taken systematically from regular deliveries (for example for large works), if necessary in the presence of all the parties concerned, to be retained for possible testing in the event of doubt or dispute or subsequent problems NOTE Definiti
18、ons 3.1, 3.2, 3.3and 3.10only have meaning in the case of checks made when taking delivery of a supply. 4 General 4.1 Purpose The purpose of the sampling operations is to obtain from a large quantity of cement (contained in a silo, a stock of bags in a warehouse, truck, etc., or in a defined lot), o
19、ne or more smaller quantities, considered by the parties concerned to represent the quantity of cement of which the quality is to be assessed. 4.2 Equipment The equipment used, methods followed, and precautions taken may vary according to the nature of the installation and the circumstances in which
20、 the samples are taken. EN 196-7:2007 (E) 64.3 Representation In the case of taking delivery of supply, sampling should take place in the presence of representatives of the manufacturer (or vendor) and the customer (or purchaser). The absence of one of them should not, however, be a barrier to sampl
21、ing but if this occurs it should be recorded in the sampling report (see clause 10). The sample is normally taken before or during discharge or unloading. However, if necessary, it may be taken after discharge or unloading but with a maximum delay of 24 h. In this latter case the results of the chec
22、ks shall be interpreted with care. NOTE For various reasons, the cement to be tested may no longer be representative of the product at the time of its discharge or unloading, when a delay in sampling occurs. In all cases, the time of sampling shall be recorded in the sampling report (see clause 10).
23、 When samples are taken after discharge or unloading, the recommendations in the first paragraph above remain applicable. 5 Sampling equipment Industrial installations and the circumstances in which samples have to be taken are many and diverse. Consequently, it is not possible to specify a single t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NFP1547172008METHODSOFTESTINGCEMENTSPART7METHODSOFTAKINGANDPREPARINGSAMPLESOFCEMENT 水泥 测试 方法 部分 样品 取样

链接地址:http://www.mydoc123.com/p-1003736.html