GMW GMW15420-2012 Global Qualification Process for Aluminum Sheet Issue 3 English.pdf
《GMW GMW15420-2012 Global Qualification Process for Aluminum Sheet Issue 3 English.pdf》由会员分享,可在线阅读,更多相关《GMW GMW15420-2012 Global Qualification Process for Aluminum Sheet Issue 3 English.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS General Specification GMW15420 Global Qualification Process for Aluminum Sheet Copyright 2012 General Motors Company All Rights Reserved November 2012 Originating Department: North American Engineering Standards Page 1 of 15 1 Introduction Note: Nothing in this stand
2、ard supercedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. This procedure defines the requirements an aluminum producer or processor shall meet to qualify their aluminum products and processing
3、 lines at General Motors. This procedure applies to GMW material grades as specified in GMW15192. This includes GMW grades from new suppliers or grades that have undergone a significant change in process route. Aluminum sheet products supplied to GM production facilities must have Engineering and Ma
4、nufacturing approvals as defined in this procedure. 1.1 Scope. Release of specific parts and applications are not within the scope of this procedure. 1.2 Mission/Theme. The intent of this procedure is to create a common, global procedure for qualification of aluminum sheet materials that are used by
5、 GM worldwide. This procedure is intended to evaluate a suppliers ability to produce and supply aluminum sheet that meets GMs requirements. Emphasis is placed on the aluminum producers ability to supply a uniform and consistent product. Some material characteristics and attribute data are requested
6、for qualification purposes even though they are not requirements of GMW15192. In these instances, the data is required for informational purposes. While this procedure details the requirements for initiating global qualification, additional regional requirements may be requested by the Qualification
7、 Champion. The data required to be submitted for each shipment will be determined by the regional manufacturing location. 1.3 Classification. This procedure applies to GMW material grades as specified in GMW15192 for body and closure panel applications. 2 References Note: Only the latest approved st
8、andards are applicable unless otherwise specified. 2.1 External Standards/Specifications. ASTM E34 ASTM E517 ASTM E646 ISO 10113 ASTM E101 ASTM E606 ASTM E1251 ISO 10275 ASTM E112 ASTM E607 EN 573 ISO/TS16949 2.2 GM Standards/Specifications. GMW3011 GMW14700 GMW15192 GMW16170 GMW3059 GMW14704 GMW152
9、82 GMW16546 GMW3335 GMW14729 GMW15287 GMW16549 GMW14085 GMW14829 GMW15288 GMW14669 GMW14872 GMW15421 3 Test Preparation and Evaluation 3.1 Resources. 3.1.1 Calibration. The test facilities and equipment shall be in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Alte
10、rnative test facilities and equipment may also be used. However, all testing must be performed at an International Laboratory Accreditation Cooperation (ILAC) member accredited laboratory, see Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo
11、reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15420 Copyright 2012 General Motors Company All Rights Reserved November 2012 Page 2 of 15 www.ilac.org for a list of national accreditation bodies. If the lab is not approved by a signatory of th
12、e ILAC mutual recognition agreement the laboratory must be approved for technical competence for the required testing as agreed upon by the Qualification Champion and supplier. 3.2 Test Conditions. Deviations from the requirements of this standard must be agreed upon by the Qualification Champion be
13、fore submission of the qualification package. Such requirements shall be specified on component drawings, test certificates, reports, etc. 3.3 Preparation. Suppliers are required to provide any test samples to General Motors or outside testing sources as required by this procedure and any referenced
14、 tests. Additional requirements for material may be identified at the start of testing or may be necessary if tests are repeated. The Qualification Champion shall inform the supplier if any additional samples are necessary as part of a re-test. 3.4 Safety. This standard may involve hazardous materia
15、ls, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
16、 3.5 Documentation. Documentation requirements are detailed in Section 7. Samples of components or material released to this standard shall be tested for conformity with the requirements of this standard and approved by the responsible GM department prior to the start of delivery of production level
17、 components or materials. Any change to the component or material, e.g., design, function, properties, manufacturing process and/or location of manufacture requires a new release of the product. It is the sole responsibility of the supplier to provide the customer, unsolicited, with documentation of
18、 any change or modification to the product/process, and to apply for a new release. If not otherwise agreed to, the entire verification test shall be repeated and documented by the supplier prior to start of delivery of the modified or changed product. In some cases, a shorter test can be agreed to
19、between the responsible GM department and the supplier. 3.6 Supplier Quality Audit. General Motors, at its discretion, may perform a supplier assessment and review of its suppliers at any time prior to or following aluminum qualification. 4 Requirements and Procedure 4.1 Summary. This procedure outl
20、ines the testing requirements for sheet metal qualification to GMW15192. The first step consists of Global Engineering Requirements. Due to GM regional manufacturing differences and requirements, the second step consists of Regional Manufacturing Requirements, which is a regional qualification that
21、involves a separate approval in each GM region of manufacture. See 5.5 for a description of the qualification levels. All testing must be performed at an International Laboratory Accreditation Cooperation (ILAC) member accredited laboratory, see www.ilac.org for a list of national accreditation bodi
22、es. If the lab is not approved by a signatory of the ILAC mutual recognition agreement, the laboratory must be approved for technical competence for the required testing as agreed upon by the Qualification Champion and supplier. 4.1.1 Global Engineering Requirements. Global Engineering Requirements
23、are a set of GM Worldwide common, engineering-based requirements for all participating regions in the global qualification process. Some material characteristics and attribute data are requested for qualification purposes even though they are not requirements of GMW15192. Global Engineering Requirem
24、ents are summarized in Appendix A, Tables A1, A2, and A3. 4.1.2 Regional Manufacturing Requirements. Regional Manufacturing Requirements are a set of manufacturing requirements for the target GM production region. The target region is defined as the GM region where the supplier would like to provide
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW154202012GLOBALQUALIFICATIONPROCESSFORALUMINUMSHEETISSUE3ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757648.html