FORD WSS-M99P32-E1-2017 PERFORMANCE ACOUSTICAL AND INSULATORS INTERIOR ASSEMBLIES TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD WSS-M99P32-E1-2017 PERFORMANCE ACOUSTICAL AND INSULATORS INTERIOR ASSEMBLIES TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD WSS-M99P32-E1-2017 PERFORMANCE ACOUSTICAL AND INSULATORS INTERIOR ASSEMBLIES TO BE USED WITH FORD WSS-M99P1111-A .pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 0 2017 02 16 Released L. Schmalz, Z. Jatkowski, NA Controlled document at www.MATS Copyright 2017, Ford Global Technologies, LLC Page 1 of 5 PERFORMANCE, ACOUSTICAL AND INSULATORS, INTERIOR ASSEMBLIES WSS-M99P32-E1 1. SCOPE This specific
2、ation defines the minimum durability requirements of all interior, luggage compartment, and climate control sound absorption/insulation applications, where various materials are combined to provide an assembly having acoustical sound absorption/barrier/insulation and/or functional features. This doe
3、s not include engine (hood) compartment insulators, thermal insulators, and/or exhaust shields. In addition, ultra-high temperature parts exposed to heat from turbochargers, EGR systems and exhaust pipes are not included. 2. APPLICATION This specification was released originally for materials used a
4、s interior, luggage compartment, or climate control for sound absorption/insulation applications. The following components are not in the scope of this performance specification Acoustic wheel arch/well liners: WSS-M99P32-D2/D3 (or latest) Acoustical underbody/engine shields: WSS-M99P32-D4/D5 (or la
5、test) Engine compartment/hood/tunnel Insulators: WSS-M99P32-E6 (or latest) Foams without the primary purpose of NVH: Without pressure-sensitive adhesive: WSS-M99P48-A1 (or latest) With pressure-sensitive adhesive: WSS-M99P48-A3 (or latest) For high temperature applications: WSS-M99P48-A4 (or latest)
6、 3. REQUIREMENTS 3.1 APPROVED SOURCES This specification is performance based and does not have approved sources. 3.2 FINISHED PART REQUIREMENTS Detailed part construction must be submitted along with results for the testing listed in Table 1 for initial approval. Data must be submitted via the Ford
7、 Materials Database (FMD) template. Design Verification (DV) is done on the part to verify supplier feasibility and Product Verification Testing (PV) is done on production parts. DV/PV and sample sizes are defined in Table 2. In addition to the following minimum requirements, production assemblies m
8、ust withstand normal handling during shipping, installation, use, and service, without tearing, breaking, or permanently deforming. 3.3 WEIGHT Weight of each layer of a composite and the total composite shall be included on Engineering Drawing. 3.3.1 Weight per Unit Area (Non-Foams) Report units (g/
9、m2) (FLTM BN 106-01 Procedure A) ENGINEERING MATERIAL SPECIFICATION WSS-M99P32-E1 Copyright 2017, Ford Global Technologies, LLC Page 2 of 5 3.3.2 Net Density (Foams) Report units (kg/m3) (FLTM BN 106-01 Procedure B) 3.4 ODOR (FLTM BO 131-03) Rating 3 max 3.5 FOGGING (SAE J1756, 3 h at 100 C heating,
10、 21 C cooling plate, posttest conditioning 16 h) Fog Number 70 min The formation of a clear (oily) film, droplets or crystals is cause for rejection. All materials, parts and components should be stored in an open environment for 14-28 days after manufacture, and then must be bagged in heat sealed p
11、olyethylene (PE) or PE coated aluminum bags for shipping. Sample shall be tested as part of a production assembly composite if it is 100% bonded. If not 100% bonded, test each component separately. Parts for testing must be labelled with supplier and date of manufacture. 3.6 FLAMMABILITY (ISO 3795)
12、Burn Rate 100 mm/minute max If test specimens cannot be prepared with the proper dimensions (please refer to the test method listed above for the appropriate dimensions) using material cut from the part, properly sized/prepared specimens must be taken from material that has been molded into a blank.
13、 Flame should be applied to the exposed side of the component, or both sides, if the A and B surfaces are exposed to high temperatures. Supplier shall document test conditions in their Control Plan (for PV). 3.7 CONSTRUCTION PROPERTIES 3.7.1 Resistance to Mildew (7 days at 98 +/- 2% relative humidit
14、y and 38 +/- 2 C, Specimen size 100 mm x 100 mm) Remove the part from the cabinet and evaluate (smell the sample) immediately. The part shall exhibit no visible evidence of mildew growth and / or objectionable odor after the 7-day exposure. In addition, part must not separate layers or show any othe
15、r visual deterioration. 3.7.2 Environmental Testing Conduct with the NVH or approved surrogate assembly mounted on an actual or simulated production support foundation with the approved retention methods. 3.7.2.1 Short Term Environmental Cycling (FLTM BO 040-01, Procedure A, 80 C) 3.7.2.2 Long Term
16、Environmental (FLTM BO 040-01, Procedure B, 80 C) *For Paras. 3.7.2.1 and 3.7.2.2, if it is agreed upon by Soft Trim Core Engineering that the maximum use temperature of a component is above the 80 C requirement listed above, ENGINEERING MATERIAL SPECIFICATION WSS-M99P32-E1 Copyright 2017, Ford Glob
17、al Technologies, LLC Page 3 of 5 then that higher temperature should be used. The higher temperature should be included in the General Notes of the Engineering Drawing. 3.8 PHYSICAL PROPERTIES Report the value of the load at which the specimen breaks; include individual values, averages, and % chang
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSSM99P32E12017PERFORMANCEACOUSTICALANDINSULATORSINTERIORASSEMBLIESTOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-754382.html