1、159 Federal Highway Administration, DOT Pt. 630 procedures should provide for the iden-tification of candidate projects for VE studies early in the development of the States multi-year Statewide Transpor-tation Improvement Program. (1) Project selection. The program may, at the States discretion, es
2、tab-lish specific criteria and guidelines for selecting other highway projects for VE studies. (2) Studies. Value engineering studies shall follow the widely recognized sys-tematic problem-solving analysis proc-ess that is used throughout private in-dustry and governmental agencies. Studies must be
3、performed using multi-disciplined teams of individuals not personally involved in the design of the project. Study teams should con-sist of a team leader and individuals from different speciality areas, such as design, construction, environment, planning, maintenance, right-of-way, and other areas d
4、epending upon the type of project being reviewed. Individ-uals from the public and other agencies may also be included on the team when their inclusion is found to be in the public interest. (i) Each team leader should be trained and knowledgeable in VE tech-niques and be able to serve as the coor-d
5、inator and facilitator of the team. (ii) Studies should be employed as early as possible in the project develop-ment or design process so that accept-ed VE recommendations can be imple-mented without delaying the progress of the project. (iii) Studies should conclude with a formal report outlining t
6、he study teams recommendations for improving the project and reducing its overall cost. (3) Recommendations. The program should include procedures to approve or reject recommendations and ensure the prompt review of VE recommenda-tions by staff offices whose speciality areas are implicated in propos
7、ed changes and by offices responsible for implementing accepted recommenda-tions. Reviews by these offices should be performed promptly to minimize delays to the project. (4) Incentives. The program may in-clude a VE or cost reduction incentive clause in an STDs standard specifica-tions or project s
8、pecial provisions that allows construction contractors to sub-mit change proposals and share the re-sulting cost savings with the STD. (5) Monitoring. The program should include procedures for monitoring the implementation of VE study team rec-ommendations and VE change proposal recommendations subm
9、itted by con-struction contractors. (b) State VE coordinators. Individuals knowledgeable in VE shall be assigned responsibilities to coordinate and mon-itor the STDs program and be actively involved in all phases of the program. (c) Use of consultants. Consultants or firms with experience in VE may
10、be re-tained by STDs to conduct the studies of Federal-aid highway projects or ele-ments of Federal-aid highway projects required under 627.1(a) of this part. Consultants or firms should not be re-tained to conduct studies of their own designs unless they maintain separate and distinct organizationa
11、l separation of their VE and design sections. (d) Funding eligibility. The cost of per-forming VE studies is project related and is, therefore, eligible for reim-bursement with Federal-aid highway funds at the appropriate pro-rata share for the project studied. (e) In the case of a Federal-aid de-si
12、gn-build project meeting the project criteria in 23 CFR 627.1(a), the STDs shall fulfill the value engineering anal-ysis requirement by performing a value engineering analysis prior to the re-lease of the Request for Proposals doc-ument. 62 FR 6868, Feb. 14, 1997, as amended at 67 FR 75924, Dec. 10,
13、 2002 PART 630PRECONSTRUCTION PROCEDURES Subpart AProject Authorization and Agreements Sec. 630.102 Purpose. 630.104 Applicability. 630.106 Authorization to proceed. 630.108 Preparation of agreement. 630.110 Modification of original agreement. 630.112 Agreement provisions. Subpart BPlans, Specificat
14、ions, and Estimates 630.201 Purpose. 630.203 Applicability. VerDate Mar2010 09:39 May 11, 2011 Jkt 223076 PO 00000 Frm 00169 Fmt 8010 Sfmt 8010 Y:SGML223076.XXX 223076wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1
15、60 23 CFR Ch. I (4111 Edition) 630.102 630.205 Preparation, submission, and ap-proval. Subpart C Reserved Subpart DGeodetic Markers 630.401 Purpose. 630.402 Policy. 630.403 Initiation of projects. 630.404 Standards. Subparts EF Reserved Subpart GAdvance Construction of Federal-Aid Projects 630.701 P
16、urpose. 630.703 Eligibility. 630.705 Procedures. 630.707 Reserved 630.709 Conversion to a regular Federal-aid project. Subpart HBridges on Federal Dams 630.801 Purpose. 630.802 Applicability. 630.803 Procedures. Subpart I Reserved Subpart JWork Zone Safety and Mobility 630.1002 Purpose. 630.1004 Def
17、initions and explanation of terms. 630.1006 Work zone safety and mobility pol-icy. 630.1008 State-level processes and proce-dures. 630.1010 Significant projects. 630.1012 Project-level procedures. 630.1014 Implementation. 630.1016 Compliance date. Subpart KTemporary Traffic Control Devices 630.1102
18、Purpose. 630.1104 Definitions. 630.1106 Policy and procedures for work zone safety management. 630.1108 Work zone safety management measures and strategies. 630.1110 Maintenance of temporary traffic control devices. AUTHORITY: 23 U.S.C. 106, 109, 112, 115, 315, 320, and 402(a); Sec. 1501 and 1503 of
19、 Public Law 10959, 119 Stat. 1144; Public Law 105178, 112 Stat. 193; Public Law 10459, 109 Stat. 582; Public Law 97424, 96 Stat. 2106; Public Law 90495, 82 Stat. 828; Public Law 85767, 72 Stat. 896; Public Law 84627, 70 Stat. 380; 23 CFR 1.32 and 49 CFR 1.48(b). Subpart AProject Authorization and Ag
20、reements SOURCE: 66 FR 23847, May 10, 2001, unless otherwise noted. 630.102 Purpose. The purpose of this subpart is to pre-scribe policies for authorizing Federal- aid projects through execution of the project agreement required by 23 U.S.C. 106(a)(2). 630.104 Applicability. (a) This subpart is appl
21、icable to all Federal-aid projects unless specifically exempted. (b) Other projects which involve spe-cial procedures are to be approved, or authorized as set out in the imple-menting instructions or regulations for those projects. 630.106 Authorization to proceed. (a)(1) The State transportation de
22、-partment (STD) must obtain an au-thorization to proceed from the FHWA before beginning work on any Federal- aid project. The STD may request an authorization to proceed in writing or by electronic mail for a project or a group of projects. (2) The FHWA will issue the author-ization to proceed eithe
23、r through or after the execution of a formal project agreement with the State. The agree-ment can be executed only after appli-cable prerequisite requirements of Fed-eral laws and implementing regula-tions and directives are satisfied. Ex-cept as provided in paragraphs (c)(1) through (c)(4) of this
24、section, the FHWA will obligate Federal funds in the project or group of projects upon execution of the project agreement. (3) The States request that Federal funds be obligated shall be supported by a documented cost estimate that is based on the States best estimate of costs. (4) The State shall m
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT23CFRPART6302011PRECONSTRUCTIONPROCEDURESPDF

链接地址:http://www.mydoc123.com/p-701907.html