BS 6349-1-3-2012 Maritime works General Code of practice for geotechnical design《海上建筑物 土岩工程设计的实施规程》.pdf
《BS 6349-1-3-2012 Maritime works General Code of practice for geotechnical design《海上建筑物 土岩工程设计的实施规程》.pdf》由会员分享,可在线阅读,更多相关《BS 6349-1-3-2012 Maritime works General Code of practice for geotechnical design《海上建筑物 土岩工程设计的实施规程》.pdf(74页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS 6349-1-3:2012Maritime worksPart 1-3: General Code of practicefor geotechnical designPublishing and copyright informationThe BSI copyright notice displayed in this document ind
2、icates when thedocument was last issued. The British Standards Institution 2012Published by BSI Standards Limited 2012ISBN 978 0 580 76230 7ICS 47.020.01; 93.140The following BSI references relate to the work on this standard:Committee reference CB/502Draft for comment 12/30250709 DCPublication hist
3、oryFirst published as BS 6349-1, April 1984Second edition as BS 6349-1, July 2000Third (present) edition, September 2012Amendments issued since publicationDate Text affectedBS 6349-1-3:2012 BRITISH STANDARDContentsForeword ivSection 1: General 11 Scope 12 Normative references 13 Terms, definitions,
4、symbols and abbreviations 1Section 2: Site investigation 44 General 45 Planning of ground investigations 55.1 Existing data sources 55.2 Site reconnaissance 55.3 Selection of sampling methods 65.4 Layout of boreholes and trial excavations 65.5 Depth of boreholes 85.6 Sealing of boreholes 95.7 Ground
5、 investigations over water 96 Groundwater investigations 117 Field tests in soil and rock 127.1 Planning 127.2 Normal field tests 127.3 Other field tests 127.5 Sampling of soils, rock and groundwater 148 Laboratory tests on soil and rock 159 Geotechnical design report 15Section 3: Geotechnical desig
6、n 1610 General 1610.1 Soil pressures 1610.2 Tides and water level variations 1610.3 Earthquakes 1711 Basis of geotechnical design 1812 Geotechnical data Selection of parameters for working design 1812.1 General considerations 1812.2 Sands and gravels 1812.3 Silts and fine silty sands 2012.4 Normally
7、- and lightly over-consolidated clays 2012.5 Over-consolidated clays 2112.6 Rocks 2213 Water 2413.1 Single-wall structures 2413.2 Double-wall and cellular structures 2914 Fill, dewatering, ground improvement and reinforcement 2914.1 Fill materials 2914.2 Ground improvement 3014.3 Reinforcement 3015
8、Function and location of anchorages 3016 Retaining structures 3116.1 Flexible structures 3116.2 Diaphragm walls 4117 Slopes 4317.1 Design considerations for slopes and embankments 4317.2 Slope stability and protection Environmental factors 4317.3 Modes of failure 4417.4 Safety and risks of failure 4
9、517.5 Slope profile 4517.6 The effects of construction procedure 4617.7 Drainage 4817.8 Monitoring stability 48BRITISH STANDARD BS 6349-1-3:2012 The British Standards Institution 2012 i17.9 Slope protection 4917.10 Maintenance of earthworks 5017.11 Remedial works 5218 Verification 52AnnexesAnnex A (
10、informative) Sampling and investigation procedures 53Annex B (informative) In-situ and laboratory testing procedures for soil androck 56Annex C (informative) Properties of the ground Physical characteristics of soiland rock 62Bibliography 63List of figuresFigure 1 Location and depth of boreholes for
11、 piled wharf 7Figure 2 Depth of boreholes in relation to retained height of soil and width ofquay wall 8Figure 3 Plain strain shear diagram for sand 19Figure 4 Plain strain shear diagram for normally consolidated clay 22Figure 5 Slab slide in rock 23Figure6Wedge failure in rock 23Figure7Toppling fai
12、lure in rock 24Figure 8 Hydrostatic pressure distribution on waterfront structures where soil isretained to full height of structure 25Figure 9 Hydrostatic pressure distribution on waterfront structure where thesoil is embanked behind the structure 27Figure 10 Effects on hydrostatic and soil pressur
13、e distribution where seepagetakes place beneath retaining structure 28Figure 11 Cantilevered single-wall sheet pile structure 32Figure 12 Anchored single-wall sheet pile structure 33Figure 13 Distribution of earth pressure and earth resistance on cantileveredsingle-wall sheet pile structure 34Figure
14、 14 Distribution of earth pressure and earth resistance on anchoredsingle-wall sheet pile structure 34Figure 15 Double wall sheet pile structures Sheet piles driven into soil belowseabed 35Figure 16 Double wall sheet pile structures Sheet piles terminated on rock atseabed 36Figure 17 Active pressure
15、 distribution on anchored single-wall structure wherefilling is placed before dredging 37Figure 18 Active pressure distribution on anchored single-wall structure wherefilling is placed after dredging 38Figure 19 Distribution of active pressure and passive resistance for total stressconditions in nor
16、mally and lightly over-consolidated clay 39Figure 20 Embankment built in stages with core material protected by dumpedstone 47Figure 21 Slope protection by rock or concrete armouring backed by filterlayer 51List of tablesTable1Typical side slopes for various soil types: underwater slopes 46Table A.1
17、 Sampling and investigation procedures 54Table B.1 In-situ and laboratory testing procedures for soils 56Table B.2 Density of sands and gravels 57Table B.3 In-situ and laboratory testing procedures for rocks 59BRITISH STANDARDBS 6349-1-3:2012ii The British Standards Institution 2012Table B.4 Strengt
18、h of rock material 61Table C.1 Physical characteristics of soils and rocks 62Summary of pagesThis document comprises a front cover, an inside front cover, pages i to vi,pages 1 to 64, an inside back cover and a back cover.BRITISH STANDARD BS 6349-1-3:2012 The British Standards Institution 2012 iiiFo
19、rewordPublishing informationThis part of BS 6349 is published by BSI Standards Limited, under licence fromThe British Standards Institution, and came into effect on 30 September 2012. Itwas prepared by Technical Committee CB/502, Maritime works. A list oforganizations represented on this committee c
20、an be obtained on request to itssecretary.SupersessionTogether with BS 6349-1-1, BS 6349-1-2 and BS 6349-1-4, this part ofBS 6349 supersedes BS 6349-1:2000, which will be withdrawn when all four ofthe new subparts have been published.Relationship with other publicationsBS 6349 is published in the fo
21、llowing parts: Part 1-1: General Code of practice for planning and design foroperations;1) Part 1-2: General Code of practice for assessment of actions;1) Part 1-3: General Code of practice for geotechnical design; Part 1-4: General Code of practice for materials;1) Part 2: Code of practice for the
22、design of quay walls, jetties and dolphins; Part 3: Design of dry docks, locks, slipways and shipbuilding berths, shipliftsand dock and lock gates; Part 4: Code of practice for design of fendering and mooring systems; Part 5: Code of practice for dredging and land reclamation; Part 6: Design of insh
23、ore moorings and floating structures; Part 7: Guide to the design and construction of breakwaters; Part 8: Code of practice for the design of Ro-Ro ramps, linkspans andwalkways.This part of BS 6349 is intended to be read in conjunction with BS EN 1997-1and BS EN 1997-2.Information about this documen
24、tA full revision of BS 6349-1:2000 has been undertaken and the principal changeis to split the document into four smaller parts: BS 6349-1-1: Code of practice for planning and design for operations; BS 6349-1-2: Code of practice for assessment of actions; BS 6349-1-3: Code of practice for geotechnic
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS6349132012MARITIMEWORKSGENERALCODEOFPRACTICEFORGEOTECHNICALDESIGN 海上 建筑物 工程设计 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-545955.html