《ARMY UFGS-03 30 53-2008 MISCELLANEOUS CAST-IN-PLACE CONCRETE [Superseded ARMY UFGS-03 30 04 NASA UFGS-03 30 53 00 40 NASA UFGS-03 30 53 00 40]《混杂现浇混凝土(代替 ARMY UFGS-03 30 04 NASA UF.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-03 30 53-2008 MISCELLANEOUS CAST-IN-PLACE CONCRETE [Superseded ARMY UFGS-03 30 04 NASA UFGS-03 30 53 00 40 NASA UFGS-03 30 53 00 40]《混杂现浇混凝土(代替 ARMY UFGS-03 30 04 NASA UF.pdf(27页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 30 53 (April 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-03 30 04 (April 2006)UFGS-03 30 53.00 40 (July 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETES
2、ECTION 03 30 53MISCELLANEOUS CAST-IN-PLACE CONCRETE04/08PART 1 GENERAL1.1 SUMMARY1.2 UNIT PRICES1.2.1 Concrete Payment1.2.2 Measurement1.2.3 Unit of Measure1.3 REFERENCES1.4 SYSTEM DESCRIPTION1.4.1 Strength1.4.2 Construction Tolerances1.4.3 Concrete Mixture Proportions1.5 SUBMITTALS1.6 QUALITY ASSUR
3、ANCE1.6.1 Regulatory Requirements1.6.2 Flatness and Levelness of Floor SlabsPART 2 PRODUCTS2.1 MATERIALS2.1.1 Cementitious Materials2.1.1.1 Portland Cement2.1.1.2 Blended Hydraulic Cement2.1.1.3 Pozzolan2.1.2 Aggregates2.1.3 Admixtures2.1.3.1 Air-Entraining Admixture2.1.3.2 Accelerating Admixture2.1
4、.3.3 Water-Reducing or Retarding Admixture2.1.4 Water2.1.5 Reinforcing Steel2.1.6 Expansion Joint Filler Strips, Premolded2.1.7 Joint Sealants - Field Molded Sealants2.1.8 Waterstops2.1.9 FormworkSECTION 03 30 53 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without lice
5、nse from IHS-,-,-2.1.10 Form Coatings2.1.11 Vapor Barrier2.1.12 Curing Materials2.1.12.1 Impervious Sheet Materials2.1.12.2 Membrane-Forming Curing Compound2.2 READY-MIX CONCRETE2.3 STEEL REINFORCEMENT2.3.1 Deformed Steel Bars2.3.2 Welded Wire Fabric2.4 FORMS2.5 ACCESSORIES2.5.1 Waterstops2.5.2 Chem
6、ical Floor Hardener2.5.3 Curing CompoundPART 3 EXECUTION3.1 PREPARATION3.1.1 General3.1.2 Embedded Items3.1.3 Formwork Installation3.1.4 Vapor Barrier Installation3.1.5 Production of Concrete3.1.5.1 Ready-Mixed Concrete3.1.5.2 Concrete Made by Volumetric Batching and Continuous Mixing3.1.5.3 Batchin
7、g and Mixing Equipment3.1.6 Waterstops3.2 CONVEYING AND PLACING CONCRETE3.2.1 General3.2.2 Consolidation3.2.3 Cold-Weather Requirements3.2.4 Hot-Weather Requirements3.2.5 Lifts in Concrete3.3 FORM REMOVAL3.4 FINISHING3.4.1 General3.4.2 Finishing Formed Surfaces3.4.3 Finishing Unformed Surfaces3.4.3.
8、1 Float Finish3.4.3.2 Trowel Finish3.4.3.3 Flat Floor Finishes3.4.3.4 Measurement of Floor Tolerances3.4.3.5 Broom Finish3.4.3.6 Expansion and Contraction Joints3.5 CURING AND PROTECTION3.6 TESTS AND INSPECTIONS3.6.1 General3.6.2 Inspection Details and Frequency of Testing3.6.2.1 Preparations for Pl
9、acing3.6.2.2 Air Content3.6.2.3 Slump3.6.2.4 Consolidation and Protection3.6.3 Action Required3.6.3.1 Placing3.6.3.2 Air Content3.6.3.3 Slump3.6.4 Reports3.7 FORM WORK3.7.1 Preparation of Form SurfacesSECTION 03 30 53 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without
10、 license from IHS-,-,-3.7.2 Form Coating3.7.3 Removal of Forms3.8 STEEL REINFORCING3.8.1 General3.8.2 Fabrication3.8.3 Splicing3.8.4 Supports3.9 EMBEDDED ITEMS3.10 BILL OF LADING3.11 CHEMICAL-HARDENER TREATMENT3.12 FIELD TESTING- End of Section Table of Contents -SECTION 03 30 53 Page 3Provided by I
11、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-03 30 53 (April 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-03 30 04 (April 2006)UFGS-03 30 53.00 40 (July 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in
12、agreement with UMRL dated March 2008*SECTION 03 30 53MISCELLANEOUS CAST-IN-PLACE CONCRETE04/08*NOTE: This guide specification covers the requirements for projects involving amounts of concrete less than 380 cubic meters (500 cubic yards).Edit this guide specification for project specific requirement
13、s by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and
14、should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification inclu
15、des tailoring options for NASA, NAVFAC, and USACE,. Selection or deselection of a tailoring option will include or exclude that option in the section, but editing the resulting section to fit the project is still required.*PART 1 GENERAL*NOTE: This specification requires furnishing all material and
16、equipment, and performing all labor for the manufacturing, transporting, placing, finishing, and curing of concrete for recreation sites, road relocations, or other structures such as culvert headwalls, comfort stations, residences, or low head SECTION 03 30 53 Page 4Provided by IHSNot for ResaleNo
17、reproduction or networking permitted without license from IHS-,-,-gate structures. Consideration should be given to using Section 03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS when the quantity of concrete is 380 cubic meters (500 cubic ) or greater per structure.*1.1 SUMMARYPerfo
18、rm all work in accordance with ACI MCP SET Parts 2 and 3.1.2 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, this paragraph title (UNIT PRICES) should be deleted from this section and the remaining appropriately edited subparagraphs belo
19、w should be inserted into Section 01 22 00.00 10.*1.2.1 Concrete PaymentPayment will cover all costs associated with manufacturing, furnishing, delivering, placing, finishing, and curing of concrete for the various items of the schedule, including the cost of all formwork. Payment for concrete, for
20、which payment is made as a lump sum, isis not to be included in this unit price payment item. Payment for grout, preformed expansion joints, field-molded sealants, waterstops, reinforcing steel bars or wire reinforcement isis not to be included in this unit price payment item.1.2.2 MeasurementConcre
21、te will be measured for payment on the basis of the actual volume of concrete within the pay lines of the structures as indicated. Measurement of concrete placed against the sides of any excavation without the use of intervening forms will be made only within the pay lines of the structure. No deduc
22、tions will be made for rounded or beveled edge, for space occupied by meal work, for electrical conduits or timber, or for voids or embedded items that are either less than 0.14 cubic meter 5 cubic feet in volume or 0.1 square meter 1 square foot in cross section.1.2.3 Unit of MeasureUnit of measure
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0330532008MISCELLANEOUSCASTINPLACECONCRETESUPERSEDEDARMYUFGS033004NASAUFGS0330530040NASAUFGS0330530040

链接地址:http://www.mydoc123.com/p-449545.html