ARMY UFGS-03 15 00 00 10-2010 CONCRETE ACCESSORIES.pdf
《ARMY UFGS-03 15 00 00 10-2010 CONCRETE ACCESSORIES.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-03 15 00 00 10-2010 CONCRETE ACCESSORIES.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 15 00.00 10 (August 2010)-Preparing Activity: USACE SupersedingUFGS-03 15 13.00 10 (November 2009)UFGS-03 15 14.00 10 (November 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION
2、03 - CONCRETESECTION 03 15 00.00 10CONCRETE ACCESSORIES08/10PART 1 GENERAL1.1 UNIT PRICES1.1.1 Waterstops1.1.1.1 Payment1.1.1.2 Measurement1.1.1.3 Unit of Measure1.2 REFERENCES1.3 SUBMITTALS1.4 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 CONTRACTION JOINT STRIPS2.2 PREFORMED EXPANSION JOINT FI
3、LLER2.3 SEALANT2.3.1 Preformed Polychloroprene Elastomeric Type2.3.2 Lubricant for Preformed Compression Seals2.3.3 Field-Molded Type2.3.4 Hot-Applied Jet-Fuel Resistant Type2.4 WATERSTOPS2.4.1 Flexible Metal2.4.2 Rigid Metal2.4.3 Non-Metallic Materials2.4.4 Non-Metallic Hydrophilic2.4.5 Preformed E
4、lastic Adhesive2.4.5.1 Chemical Composition2.4.5.2 Adhesion Under Hydrostatic Pressure2.4.5.3 Sag of Flow Resistance2.4.5.4 Chemical Resistance2.5 TESTS, INSPECTIONS, AND VERIFICATIONS2.5.1 Materials Tests2.5.1.1 Field-Molded Sealants2.5.1.2 Non-Metallic Waterstops2.5.2 Splicing WaterstopsSECTION 03
5、 15 00.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.5.2.1 Procedure and Performance Qualifications2.5.2.2 Non-Metallic Waterstops2.5.2.3 Metal WaterstopsPART 3 EXECUTION3.1 INSTALLATION3.1.1 Contraction Joints3.1.1.1 Joint Strips3.1.
6、1.2 Sawed Joints3.1.1.3 Bond Breaker3.1.2 Expansion Joints3.1.3 Joint Sealant3.1.3.1 Joints With Preformed Compression Seals3.1.3.2 Joints With Field-Molded Sealant3.2 WATERSTOPS, INSTALLATION AND SPLICES3.2.1 Copper And Stainless Steel3.2.2 Flat Steel3.2.3 Non-Metallic3.2.3.1 Rubber Waterstop3.2.3.
7、2 Polyvinyl Chloride Waterstop3.2.3.3 Quality Assurance3.2.4 Non-Metallic Hydrophilic Waterstop Installation3.2.5 Preformed Plastic Adhesive Installation3.3 CONSTRUCTION JOINTS- End of Section Table of Contents -SECTION 03 15 00.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking
8、permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-03 15 00.00 10 (August 2010)-Preparing Activity: USACE SupersedingUFGS-03 15 13.00 10 (November 2009)UFGS-03 15 14.00 10 (November 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July
9、2010*SECTION 03 15 00.00 10CONCRETE ACCESSORIES08/10*NOTE: This guide specification covers the requirements for expansion joints, contraction joints and waterstops used in concrete construction. This guide will be used in conjunction with Section 03 31 00.00 10 CAST-IN-PLACE STRUCTURAL CONCRETEEdit
10、this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and
11、 suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Cri
12、teria Change Request (CCR).cations where text must be supplied by the designer.*PART 1 GENERAL1.1 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, this paragraph title (UNIT PRICES) should be deleted from this section and the remaining ap
13、propriately edited subparagraphs below should be inserted into Section 01 22 00.00 10.*SECTION 03 15 00.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.1 Waterstops1.1.1.1 PaymentPayment will be made for costs associated with watersto
14、ps, including labor, materials and use of all equipments and tools required to complete the waterstop work. No separate payment will be made for expansion and contraction joints which are included in the costs for the items to which work for expansion and contraction joints are incidental.1.1.1.2 Me
15、asurementWaterstops will be measured for payment by the linear meter foot in place. In computing the quantity of the waterstops, no allowance will be made for laps. No separate measurement will be made for expansion and contraction joints which are included in the costs for the items to which work f
16、or expansion and contraction joints are incidental.1.1.1.3 Unit of MeasureUnit of measure: linear meter foot.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and l
17、isted in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature t
18、o update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The pu
19、blications are referred to within the text by the basic designation only.AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)AASHTO T 111 (2009) Standard Method of Test for Mineral Matter or Ash in Asphalt MaterialsAMERICAN HARDBOARD ASSOCIATION (AHA)AHA A135.4 (1995; R 2004)
20、Basic HardboardSECTION 03 15 00.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASME INTERNATIONAL (ASME)ASME BPVC SEC IX (2010) BPVC Section IX-Welding and Brazing QualificationsASTM INTERNATIONAL (ASTM)ASTM A 1011/A 1011M (2009b) Standa
21、rd Specification for Steel, Sheet, and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability and Ultra-High StrengthASTM A 109/A 109M (2008) Standard Specification for Steel, Strip, Carbon (0.25 Maximum Percent), Cold-RolledASTM A 167 (1
22、999; R 2009) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and StripASTM A 480/A 480M (2009b) Standard Specification for General Requirements for Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet, and StripASTM B 152/B 152M (2009) Standard Spec
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS03150000102010CONCRETEACCESSORIESPDF

链接地址:http://www.mydoc123.com/p-449542.html