ARMY MIL-PRF-62195 D-1998 RECOVERY VEHICLE FULL TRACKED MEDIUM M88A1 NEW AND OVERHAUL《全力追踪回收车辆 中等M88A1新和大修》.pdf
《ARMY MIL-PRF-62195 D-1998 RECOVERY VEHICLE FULL TRACKED MEDIUM M88A1 NEW AND OVERHAUL《全力追踪回收车辆 中等M88A1新和大修》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-PRF-62195 D-1998 RECOVERY VEHICLE FULL TRACKED MEDIUM M88A1 NEW AND OVERHAUL《全力追踪回收车辆 中等M88A1新和大修》.pdf(30页珍藏版)》请在麦多课文档分享上搜索。
1、/INCH-POUND I 29 Januarv 1998 SUPERSEDING 1 May 1986 MIL-PRF-62195D(AT) MIL-R-62 195C(AT) PERFORMANCE SPECIFICATION RECOVERY VEHICLE, FULL-TRACKED: MEDIUM, M88A1 NEW AND OVERHAUL This specification is approved for use by the U.S. Army Tank-automotive and Armaments Command, Department of the Army, an
2、d is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 ScoDe. This specification covers the requirements and inspections for the M88A1 armored, full-tracked, rear sprocket driven recovery vehicles, both new and overhauled. 1.2 Classification. Vehicles cover
3、ed by this specification are of the following grades (see 6.2): Grade A - New Vehicles. Grade B - Overhaul Vehicles. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section does not include documents in other sec
4、tions of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirement documents cited in sections 3 and 4 of this specification, whethe
5、r or not they are listed. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: U.S. Army Tank-automotive and Armaments Command, AT“: AMSTA-TR-E/BLUE, Warren, MI 48397-5000, by using the Standardizati
6、on Document Improvement Proposal (DD Form 1426) appearing at the end of this document, or bv letter. AMSC NiA FSC 2350 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Licensed by Information Handling ServicesProvided by IHSNot for ResaleNo reproduction or networking
7、 permitted without license from IHS-,-,- NIL-PRF-b2195D 999990b 2063395 941 MIL-PRF-62 195D(AT) 2.2 Government documents. 2.2.1 Specifications. standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwi
8、se specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation (see 6.2). SPECIFICATIONS DEPARTMENT OF DEFENSE MIL-PRF-62071 - MIL-PRF-62177 - i Power Supply: High
9、 Voltage, Solid State, 24 Volts, Direct Current. Engine, Diesel: 12-Cylinder, 90 degrees V-Type, 750 H.P. AVDS 1790-2, AVDS 1790-2A, AVDS 1790-2C, AVDS 1790-2D, AVDS 1790-2DR, AVDS 1790-2Ck and AVDS 1790-2DA. .(Unless otherwise indicated, copies of the above specifications are available from the Sta
10、ndardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 191 11-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless oth
11、erwise specified, the issues are those cited in the solicitation. PURCHASE DESCRIPTIONS ARMY ATPD 2062 - Regulator, Engine Generator: 28 V DC, Solid State Dual Current Limit. (Copies of this purchase description are available fiom the U.S. Army Tank-automotive and Armaments Command, AMSTA-TR-EBLUE,
12、Warren, MI 48397-5000.) 2.3 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has bee
13、n obtained. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-62L95D W 9999906 2063396 888 W MIL-PRF-62 195D(AT) 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection in accordanc
14、e with 4.3.1. 3.2 Desim, materials, and manufacturing tirocesses. Unless otherwise specified (see 6.2) the design, materials, and manufacturing process selection is the prerogative of the contractor as long as all articles submitted to the government fully meet the operating, interface, ownership an
15、d support, and operating environment requirements specified. 3.2.1 Recycled. recovered, or environmentallv preferable materials. Recycled, recovered, or environmentally preferable materials shall be used to the maximum extent possible provided that the material meets or exceeds the operational and m
16、aintenance requirements, and promotes economically advantageous life cycle costs. 3.3 Operating. requirements. Each vehicle shall provide the following functional, operational, and performance capabilities. 3.3.1 Sealing. 3.3.1.1 Seals. Except as noted herein, seals shall restrict the entrance of wa
17、ter and foreign matter and shall restrict the leaking of lubricants from the bearings. 3.3.1.2 Door, hatch and vision device seals. Seals shall prevent the entrance of water into the crew compartment. 3.3.1.3 Air cleaner outlet hose system. The air cleaner outlet hose system shall be air tight. Vacu
18、um loss shall be not greater than 5 inches (in,) of water during a 3 minute (min) period. 3.3.2 Special kits. When specified (see 6.2), special kits shall be furnished as follows. 3.3.2.1 Winterization kit. The winterization kit shall assure satisfactory engine starting and vehicle operation in ambi
19、ent temperatures of -25 to -65 degrees Fahrenheit (“F). 3.3.2.2 Fording kit (deeD water). The deep water fording kit shall assure vehicle performance as specified in 3.6.2.2. 3.3.2.3 Chemical. bacteriological. radiological kit (CBR). The CBR kit shall function as a gas particulate filter system. The
20、 kit shall allow an air flow of 3.5 to 4.5 cubic feet per minute 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-PRF-b2L95D m 999990b 2063397 714 MIL-PRF-62 195D(AT) (ft3/min) for each crew position outlet when the other crew position bases ar
21、e connected to their stowage orifice. 3.3.2.4 Smoke generating kit. The two elements of this kit, the hull segment and the engine segment, shall be capable of generating smoke in volume through the vehicles engine exhaust outlets on demand. Both the right and left exhaust outlets shall emit white sm
22、oke. 3.3.3 Power package. The power package shall consist of an engine conforming to MIL-PRF-62 177 and a transmission conforming to the contractors specifications. 3.3.4 Mechanical transmission Dower takeoff (PTO). The PTO shall drive a mechanical type transmission of the reduction gear, clutch typ
23、e. 3.3.5 Fuel svstem. When ascending and descending longitudinal grades and side slopes, in forward and reverse, the fuel system shall maintain fuel supply to the engine. The entire fuel system shall exhibit no leakage. 3.3.5.1 Fuel tanks. Fuel tanks shall allow a fuel filling rate of 50 gallons per
24、 minute (gdmin). The fuel tanks shall be clean of rust, moisture, scale, welding spatter, and slag 3.3.5.2 Fuel lines. Fuel lines shall not leak fuel and provisions shall be made to assure the internal cleanliness of fuel lines and connections. 3.3.5.3 Emergency fuel shut-off. Emergency fuel shut-of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILPRF62195D1998RECOVERYVEHICLEFULLTRACKEDMEDIUMM88A1NEWANDOVERHAUL 全力 追踪 回收 车辆 中等 M88A1 新和 大修 PDF

链接地址:http://www.mydoc123.com/p-447549.html