ARMY MIL-PRF-11430 F-1997 CASE MILITARY WATER CAN INSULATED《绝缘军用水箱》.pdf
《ARMY MIL-PRF-11430 F-1997 CASE MILITARY WATER CAN INSULATED《绝缘军用水箱》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-PRF-11430 F-1997 CASE MILITARY WATER CAN INSULATED《绝缘军用水箱》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-PRF-11430F 24 Februarv 199 7 SUPERSEDING MIL-C-11430E 15 November 199 1 PERFORMANCE SPECIFICATION CASE, MILITARY WATER CAN, INSULATED This specification is approved for use by all Departments and Agencies of the Department of Defense (DoD). 1. SCOPE 1.1 Scope. This specification covers the perfo
2、rmance and acceptance requirements for an insulated case for the 5-gallon military water can (see 6.1). 2. APPLICABLE DOCUMENTS - None 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection in accordance with 4.1.1. 3.2 Operatino reauirem
3、ents. The insulated case shall satis the following user oriented requirements. 3.2 . 1 Color. The insulated case shall be desert tan or olive drab as specified (see 6.2 and 6.5). 3.2.2 Means of carrying. The insulated case shall be designed to provide lifting and carrying by an individual, when used
4、 as intended with the water can. 3.2.3 Accessibilitv to water can. The top (cover) of the insulated case shall provide a seal when closed and be readily opened by an individual wearing arctic mittens. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be use
5、d in improving this document should be addressed to: US. Army Natick Research, Development, and Engineering Center, Attn: SSCNC-WEF, Natick, MA O 1760-501 8 by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC NIA FSC 7240
6、 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF- 1 1430F 1 3.2.4 Safety. The material used for the outer shell and insulation shall be nonflammable and nontoxic. 3.2.5 Insulation of 5-gallon water can. The insulated case shall keep water in
7、a full 5-gallon water can from freezing at temperatures set at -40F for 20 hours. 3.3 Support or ownership reauirements. The insulated case shall meet the following requirements. 3.3.1 Weight. The weight of the insulating case shall be no more than ten pounds. 3.3.2 Thickness. The thickness of the o
8、uter material and insulation used in the case shall not exceed 1 1/2 inches. 3.3.3 Rigid bottom and sides. The bottom of the case shall be made of a rigid material and it shall extend up from the bottom along the front, back and sides for a distance of at least 1 1/2 inches. 3.3.4 Durability. The in
9、sulating case shall withstand the rigors normally exerted by field operations when dropped. 3.3.5 Identification marking. The identification marking shall be located on the inside of the case cover and shall be applied with a marking medium that is well-defined, clearly legible and with characters t
10、hat are approximately 1/4 inch in height. The marking medium shall be durable and compatible with the material used on the inside of the case cover. The following information is required: “CASE, MILITARY WATER CAN, INSULATED; Contract No; Stock No. and Contractors name“. 3.3.5.1 Special marking. The
11、 letters, “US“ shall be permanently placed on the outside of both sides of the case. The letters shall be in block form and shall be at least 1 inch in height, and the marking medium shall be durable and compatible with the material used on the outside of the case. 3.4 Fnvironmental reauirements. Th
12、e insulated case with full 5-gallon water can shall be functional in ambient temperatures from -40F to 125OF. 3.5 Interface and interoperabilie reauirements. The insulating case shall be designed for use with the 5-gallon water can (NSN 7240-00-089-3827 or NSN 7240-01-365-5317). The water can shall
13、fit snugly inside the insulated case. 3.6 Government-loaned equipment The Government shall supply two 5-gallon water cans to be used as a guide to fabricate the insulated case (see 3.5 and 6.7). 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- 3.2.
14、4 3.2.5 3.3 3.3.1 3.3.2 4.3.4 4.3.5 4.4 4.4.1 4.4.2 MIL-PRF-LL430F 706 2029080 519 = MIL-PW-11430F 4. VERIFICATION 4,l Classification of inspections. The inspection requirements specified herein are classified as follows: a. First article inspection (see 4.1.1) b. Conformance inspection (see 4.1.2)
15、4.1.1 First article inspection. When a first article inspection is required (see 3.1 and 6.2), a sample shall be examined for all the verifications listed in table I. 4.1.2 Conformance insDection. Conformance inspection includes those examinations and tests from table I as defined in the contract or
16、 purchase order (see 6.4). TABLE I. Verification n Title :thods Requirement 3.2 Verification I OPERATING REQUIREMENTS 4.3 4.3.1 I Coior 3.2.1 3.2.2 4.3.2 Means of carrying Accessibility to water can Safety Insulation of 5-gallon water can 3.2.3 14.3.3 1 SUPPORT OR OWNERSHIP REQUIREMENTS I Weight Thi
17、ckness 3.3.3 4.4.3 Rigid bottom and sides Durability Identification marking Special marking OPERATING REQUIREMENT INTERFACE AND INTEROPERABILITY REOUIREMENTS 3.3.4 4.4.4 4.4.5 3.3.5 4.4.6 3.3.5.1 3.4 4.4.7 3.5 4.4.8 I 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without lic
18、ense from IHS-,-,-MIL-PRF- 1 1430F 4.2 Verification methods. Verification methods can include visual examination, measurement, testing, certification and similarity to previously-approved or previously-qualified designs. 4.2.1 Verification alternatives. The manufacturer may propose alternative test
19、methods, techniques, or equipment, including the application of statistical process control, tool control, or cost-effective sampling procedures to veri performance. See the contract for alternatives that replace verifications required by this specification. 4.3 Operating reauirements verification.
20、All user requirements shall be verified as follows: 4.3.1 Color examination. Visually inspect the insulating case color for similarity to the standard color samples, as specified in the contract or purchase order (see 6.6). 4.3.2 Means of carrying verification. The insulated case shall be visually i
21、nspected to verify that the design is such that an individual can lift or carry the insulated case with the water can inserted. 4.3.3 Accessibility to water can test. A 5-gallon water can shall be inserted in the insulating case and the cover closed. Don a pair of arctic mittens and open the cover t
22、o access the water can. With mittens on, close and seal the cover of the insulating case. Opening and closing of the insulated case cover, with mittens on, shall not exceed 20 seconds for each function. 4.3.4 Safety certification. A certificate shall be provided, verifying that the materials used fo
23、r the outer shell and insulation of the case, do not pose a fire or toxic hazard. 4.3.5 Insulation of 5-gallon water can verification. The insulated case with a full 5-gallon water can inserted, shall be placed in a freezer unit set at - 40F for 20 hours. The starting temperature of the water shall
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILPRF11430F1997CASEMILITARYWATERCANINSULATED 绝缘 军用 水箱 PDF

链接地址:http://www.mydoc123.com/p-446977.html