1、MILITARY SPECIFICATION POWER SUPPLY ASSEMBLY, NIXIE This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specif.ication covers one type of electronic
2、. assembly known as Nixie Power Supply. 2. APPLIC-BLE DOCUMENTS 2.1 The following documents, of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-F-13926 - Fire Control Materiel, G
3、eneral Specification Governing the.Manufacture and Inspection of MIL-P-14232 - Parts, Equipment and Tools for Army Materiel: Packaging and Packing of MIL-1-45607 - Inspection Equipment, Acquisition, Disposition and Maintenance of STANDARDS MIL I TARY MIL-STD-105 - Sampling Procedures and Tables for
4、Inspection by Attributes MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-810 - Environmental Test Methods FSC: 1240 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted wit
5、hout license from IHS-,-,-MI L-P- 4 86 O 9 (AR) TABLE I ITEM CONDITION CHARACTERISTICS CONNECTIONS LOADS CONNECTED BETWEEN THE FOLLOW I NG TERMINALS : 1. 1.1 RESISTOR 28 Kilohms - + 1% J1-A and JI-D 2. POWER SOURCE +15 + 1.2 Vdc J1-C (+) and - JI-D (-) 3.3.1.1 Output voltage and ripple.- The output
6、voltage between J1-A(+) and Jl-D(-) shall be 214 4- 36 VDC, and the maximum ripple voltage shall be 15 volts Peak-to-peak when the ower source of Table I, Item 2 is applied with the indicated olarity over the range specified therein. 3.3.1.2 Input current.-The maximum currect supplied to y: terminal
7、 JI-C shall be 260 milli-amperes when the load and power are applied as specified. 3.3.2 Environmental. 3.3.2.1 Storage temperature.-The power supply unit shall meet the requirements of 3.3.1 at ambient temperature (+60O to +90F) after exposure and thermal stabilization at :8O0F and +160F. 3.3.2.2 O
8、perating temperatures.-The power supply unit shall meet the requirements of 3.3.1 while thermally stabilized at -4OOF and +125OF, subsequent to which it shall meet the above requixements at ambient temperature (+SOOF to +90F). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted wi
9、thout license from IHS-,-,-3.3.2.3 Vibration.-The power supply unit shall show no physical failure and shall meet the requirements of 3.3.1 after being exposed to the following vibratory conditions: (a) Double 0.5 inch maximum (b) Acceleration 4g maximum (c) Crossover 12.5 Hertz (Hz) (d) Sweep time
10、Amp1 i tude frequency 5 to 500 to 5 Hz in 15 minutes. Two sweeps in each of the three mutually perpendicular axes. 3.3.2.4 Shock,-The power supply unit shall meet the requirements of 3.3.1 after being exposed to a total of six shock impulses, one in each direction of the three mutually perpendicular
11、 axes. Each shock impulse shall be a sawtooth with a time duration of six milliseconds. shall be 1OOg. technical provisions for first article inspection. for the submission of first article samples by the contractor shall be as specified in the contract. workmanship requirements of MIL-F-13926 and a
12、pplicable specifications as cited on Drawing 11750377. The peak amplitude 3.4 First Article Inspection.-This specification contains Requirements 3.5 Workmanship.-The power supply unit shall meet the 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specified in the
13、contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. contract or order, the supplier may utilize his own or any other facilities suitable for the perf.ormance of the inspection requirements specified herein, unless disapprove
14、d by the Government, In addition, the Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 inspection requirements of MIL-F-13926 form a par
15、t of the quality assurance provisions of this specification. Definitions of inspection terms shall be as listed in Except as other wise specified in the General provisions.-The component and subassembly MIL-STD-109. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
16、se from IHS-,-,-flIL-P-b07 12 3777706 0322239 h = inspection shall be conducted on this item: a. First Article Inspection b. Quality Conformance Inpsection 4.3.1 Submission.-The contractor shall submit a first : article sample as designated by the contracting officer for otherwise specified, the sam
17、ple for first article approval tests shall consist of three power supplies plus three each of all components and subassemblies. I specified in Tables II, III and IV herein. The Government components and subassemblies to any or all of the examinations and tests specified herein and to any or all requ
18、irements of the applicable drawings. 4.3.3 Rejection.-If any assembly, component or subassembly fails to comply with any of the applicable requirements, the first article sample shall be rejected, reserves the right to terminate its inspection upon any failure of an assembly, component, or subassemb
19、ly in the sample to comply with any of the stated requirements. 4.4 Quality Conformance Inspection I The Government by the contracting officer, inspection lot size, lot formation and presentation of lots shall be inaccordance with “Submission of Product“ provisions of MIL-STD-105. Classification of
20、Defects shall be performed on inspection lots as defined in 4.4.1 of this specification. 4.4.2 Examination.-The examinations listed herein for I inspection pravisions contained an Supplementary Quality Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP486091978POWERSUPPLYASSEMBLYNIXIENIXIE 电源 组件 PDF

链接地址:http://www.mydoc123.com/p-446411.html