ARMY MIL-G-51478 B-1987 GRENADE LAUNCHER SMOKE SCREENING RP UK L8A3《RP UK L8A3筛选 发烟手榴弹发射器》.pdf
《ARMY MIL-G-51478 B-1987 GRENADE LAUNCHER SMOKE SCREENING RP UK L8A3《RP UK L8A3筛选 发烟手榴弹发射器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-51478 B-1987 GRENADE LAUNCHER SMOKE SCREENING RP UK L8A3《RP UK L8A3筛选 发烟手榴弹发射器》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、1. SCOPE MIL-G-SLLI78B 13 7777706 01182255 LI M 21 December i987 SUPERSEDING MIL-G-51478A(EA) 4 September 1987 MILITARY SPECIFICATION GRENADE, LAUNCHER, SMOKE: SCREENING, RP, UK, L8A3 This specification is approved for use within the Chemical Research, Development and Engineering Center, Department
2、of the Army and is available for use by all Departments and Agencies of the Department of Defense. 1.1 Scope. This specification covers one type of grenade. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Standards. The following standards form a part of this specification to the extent spec
3、ified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the soli citation. STANDARDS MIL I TARY MIL-STD-105 - Sampling Procedures and Tables
4、 for Inspection by MIL-STD-1168 - Lot Numbering of Ammunition MIL-STD-1234 - Pyrotechnics: Sampling, Inspection and Testing Attributes : Beneficial comments (recommendations, additions, deletions) and any perti- : : nent data which may be of use in improving this document should be addressed: : to:
5、Commander, U.S. Army Chemical Research, Development and Engineering : : Center, ATTN: SMCCR-SPT-S, Aberdeen Proving Ground, MD 21010-5423 by using: : the self-addressed Standardization Document Improvement Proposal (DD Form : : 1426) appearing at the end of this document or by letter. AMSC N/A FSC 1
6、330 DISTRIBUTION STATEMENT A. Approved or public release; distribution is unlimited. THIS DOCUMENT CONTAINS 5 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.2 Drawings. The following drawings form a part of this specification to the exten
7、t specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DRAWING AND TECHNICAL DATA PACKAGE LIST (TDPL) U.S. ARMY CHEMICAL RESEARCH, DEVELOPMENT AND ENGINEERING CENTER TDPL 13-19-100 - Grenade, Launcher, Smoke: Screening, RP, UK L8A3 (Copie
8、s of standards and drawings required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting activity.) 2.2 Order of precedence. In the event of a conflict between the text of this specification and the ref
9、erences cited herein (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. RE
10、QUIREMENTS 3.1 Materials and comDonents. 3.1.1 Materials. All materials cited on TDPL 13-19-100 or on the subsidiary drawings shall conform to the specification listed thereon or to the specific characteristics set forth on the drawings. 3.1.2 Components. All components of the grenade shall conform
11、to the speci- fications and drawings listed on TDPL 13-19-100 and on subsidiary drawings. -3.2 Assembly. The grenade shall be assembled as shown on Drawing 13-19-100. 3.2.1 Subassemblies. 3.2.1.1 Delay assembly. All components of the delay assembly and cylinder shall be assembled as shown on Drawing
12、 13-19-102 (see 6.5). 3.2.1.2 Cylinder assembly, All components of the cylinder assembly shall be assembled as shown on Drawing 13-19-101, The cylinder assembly shall have an outer clip to inner clip resistance of 0.9 to 1.6 ohms when tested in accord- ance with 4.4.4.1. 3,2.1.3 Moisture and volatil
13、es. When tested as specified in 4.4.4.4, the moisture and volatiles content of the red phosphorus butyl rubber shall be no greater than 0.15 percent by weight and that of the black powder shall be no greater than 0.70 percent by weight when loaded into the grenade. 2 Provided by IHSNot for ResaleNo
14、reproduction or networking permitted without license from IHS-,-,-MIL-G-5LLI7B 13 m 7797706 0382257 m 3.2.1.4 Red phosphorus butyl rubber characteristics. The red phosphorus butyl rubber shall conform to drawing requirements when tested as specified in 4.4.4.5. 3.3 Immersion. The grenade shall not h
15、ave evidence of leakage after water immersion and shall conform to the requirements of 3.4 when tested in accord- ance with 4.4.4.2. 3.4 Functioning. The grenade shall function as follows when tested in accordance with 4.4.4.2 and 4.4.4.3. (a). The electric fuze shall function igniting the propellan
16、t charge and the delay composition. The gas from the burning.propellant shall displace or rupture the diaphragm and launch the grenade from the discharger. During the flight of the grenade, the delay composition shall burn through and ignite the burster charge. The grenade shall burst 30 + 8 meters
17、from the discharger at a height of 6 meters to 12 meters. - (b) When the grenade bursts, the burst shall break the red phosphorus/ butyl rubber pellet into pieces approximately the size of the original granules and ignite these granular pieces. The burst shall then rupture the rubber body and scatte
18、r the burning pieces. shall remain in the grenades rubber body. The granules shall not scatter more than 75 meters from the discharger. The burning, falling granules shall reinforce the smoke cloud by continuing to burn for no more than 6 minutes No more than 25 grams of unignited granules (c) The t
19、ime from grenade-launch to good obscuration, as a result of the grenades smoke, shall be no more than 6 seconds. good obscuration for not less than 60 seconds as assessed by an experienced observer . The smoke shall provide 3.5 Preproduction. Prior to the start of regular production, a preproduc- ti
20、on lot of grenades shall be produced, examined and tested in accordance with this specification (see 4.3). 3.6 Workmanship. The grenade shall be free from smoke mix contamination, foreign matter and damage such as dents, cracks or deformation which could impair its intended use. 4. QUALITY ASSURANCE
21、 PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the con- tract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use
22、 his own or any other facilities suitable for the performance of the inspection requirements speci- fied herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to ass
23、ure supplies and services conform to prescribed requirements. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-51478B(EA) , 4.1.1- Responsibilityecompliance. All items must meet all requirements of sections 3 and 5. become a part of the contra
24、ctors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring-that all products or supplies submitted to the Government for acceptance comply with all require- ments of the contra
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG51478B1987GRENADELAUNCHERSMOKESCREENINGRPUKL8A3RPUKL8A3 筛选 发烟 手榴弹 发射器 PDF

链接地址:http://www.mydoc123.com/p-444982.html