ANSI NEIS 600-2014 Standard for Installing and Maintaining Medium-Voltage Cable.pdf
《ANSI NEIS 600-2014 Standard for Installing and Maintaining Medium-Voltage Cable.pdf》由会员分享,可在线阅读,更多相关《ANSI NEIS 600-2014 Standard for Installing and Maintaining Medium-Voltage Cable.pdf(46页珍藏版)》请在麦多课文档分享上搜索。
1、NECA/NCSCB 600-2014 Standard for Installing and Maintaining Medium-Voltage Cable NECA/NCSCB 600-2014 Standard for Installing and Maintaining Medium-Voltage Cable An American National Standard Published by National Electrical Contractors Association Jointly developed with National Cable Splicing Cert
2、ification Board (NCSCB) 1a:Bmc. National Cable Splicing Certification - -Revision History NECA/MACSCB 600-2003 02/2003 NECA/NCSCB 600-2014 08/2014 NOTICE OF COPYRIGHT This document is copyrighted by NECA Reproduction of these documents either in hard copy or soft (including posting on the web) is pr
3、ohibited without copyright permission. For copyright permission to reproduce portions of this document, please contact NECA Standards 4550 kg (10,000 lbs) for multiple conductors; manufacturers recommended maximum pulling tension; or manufacturers maximum sidewall pressure, whichever is least. Use p
4、ulling eyes and cable grips together for cables with nonmetallic sheaths, to prevent damage to the cable structure. Arrange cable grips such that the stress of pulling is applied to the conductor and not to the jacket or the insulation. Standard for Installing and Maintaining Medium-Voltage Cable NE
5、CA/NCSCB 600 Do not pull cables using metallic shielding wires, tapes or braids, or armor not designed for the purpose. Do not use rope hitches for pulling attachment to cables. Install a tension gauge at the pulling end during cable installation to measure cable pulling tensions. Continuously monit
6、or pulling tensions to ensure that maximum pulling tension is not exceeded. Permanently record cable pulling tension for each pull and submit to the engineer of record. Provide mechanical equipment or adequate personnel to feed cables into conduits or ducts to minimize cable pulling tension at the p
7、oint of feed. Ensure that cables do not cross over one another at the feed end during the pull. Where possible, feed cable into the end of the conduit or duct system closest to the greatest degree of bends, and pull from the other end. Where possible, pull cable downhill from higher elevations towar
8、d lower elevations. Ensure sidewall pressure is not exceeded when cables are pulled down vertically around a conduit bend. Observe cable at all points of duct entry and exit during pulling operation. Use two-way voice communication before and during installation. Stop pulling operation immediately w
9、ith any indication of binding or obstruction. Do not resume pulling until such difficulty is corrected. Test, terminate and energize cable as soon as possible after installation. If cables are left overnight or more than 8 hours after pulling prior to termination, remove the pulling attachment, cut
10、the cable end, reseal the cable immediately with tape, paraffin, or shrink wrap caps, and support the cable in a manner which will prevent entrance of moisture into the cable. When sealing cables with tape, completely wrap cable end with rubber tape to 75 mm (3 in.) from the cable end. Cover rubber
11、tape with polyvinylchloride tape. 5.8 Manholes Support cable reels on sturdy supports located sufficiently near the manhole to permit feeding the cable through the manhole opening without rubbing on the ground. Locate cable reels at the side of the manhole opening above the duct to receive the cable
12、. Install a flexible tube guide through the manhole opening in a manner that will prevent the cable from rubbing on the edges of the manhole frame, chimney, or duct. Consider delaying installation of manhole roofs in new construction to facilitate cable installation. Leave sufficient cable lengths i
13、n manholes to permit splicing and training on racks around the manhole walls, and for free movement of the cable due to expansion or contraction after installation. Overlap cable ends to provide sufficient undamaged cable for splicing. Overlap each cable to be spliced in manholes at the center line
14、of the proposed splice by a minimum of 600 mm (2 ft). 5.9 Direct Burial Install shielded cable specifically listed for direct burial. Locate structures in the path of the planned cable route, as much as practical, prior to trenching, plowing, or boring operations. For other underground utility facil
15、ities, contact the local underground facilities protective organization. Install cable in as straight and direct a line as practical with sufficient slack to allow for earth movement due to settling, freezing, and drying. Locate and route direct buried cables so as to be subject to the least disturb
16、ance practical and to allow safe access for construction, inspection, and maintenance. Bend cable to a sufficiently large radius to limit the likelihood of damage during installation. Avoid routes through unstable soil such as mud, shifting soils, corrosive soils, or other natural hazards. Install s
17、uitably protected cables when subjected to natural hazards. 13 NECA/NCSCB 600 Standard for Install ing and Maintaining Medium-Voltage Cable Use watertight taps and splices that are protected from mechanical damage. Direct burial cables are permitted to be spliced or tapped without the use of splice
18、boxes, provided they are installed using materials suitable for the application. Ensure that cables are properly bedded above and below prior to installing backfill. Use granular or selected backfill material or sleeves for suitable heat dissipation and physical protection of cables. Do not place la
19、rge rocks, paving materials, cinders, large or sharp angular substances, or corrosive materials in an excavation where materials can damage cables or other substructures, or prevent adequate compaction of backfill, or contribute to corrosion of cables. 5.9.1 Separations Do not install cables running
20、 parallel over or under other subsurface structures. Consult other underground facility owners for requirements of perpendicular crossings. Maintain a minimum of300 mm (12 in.) of horizontal and vertical separation between direct burial cable and other underground structures during installation, unl
21、ess all responsible parties for affected structures and utilities agree to a lesser separation. Refer to the NEC for greater clearance requirements in particular applications such as installing medium-voltage cables in hazardous (classified) locations, near swimming pools, and near underground fuel
22、storage facilities. Support underground structures to prevent transfer of harmful loads to the cable system where cables cross under another underground structure where a 300 mm (12 in.) vertical separation cannot be maintained. Support cables to prevent transfer of harmful loads to another undergro
23、und structure where cables cross over the structure where a 300 mm (12 in.) vertical separation cannot be maintained. Provide a minimum of 100 mm (4 in.) of tamped earth where cables cross other cables or piping where a 300 mm (12 in.) vertical separation cannot be maintained. 14 Provide suitable th
24、ermal barriers to prevent thermal damage where a 300 mm (12 in.) separation cannot be maintained between cables and other underground structures such as steam or cryogenic lines. 5.9.2 Burial Depth Install direct burial cable below the frost line and at a depth sufficient to protect the cable from d
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSINEIS6002014STANDARDFORINSTALLINGANDMAINTAININGMEDIUMVOLTAGECABLEPDF

链接地址:http://www.mydoc123.com/p-437463.html