ABS 82 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS 2017.pdf
《ABS 82 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS 2017.pdf》由会员分享,可在线阅读,更多相关《ABS 82 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS 2017.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、 RULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS 2017 NOTICE NO. 1 July 2017 The following Rule Changes were approved by the ABS Rules Committee on 30 May 2017 and become EFFECTIVE AS OF 1 JULY 2017. (See http:/www.eagle.org for the consolidated version of the Rules for Building an
2、d Classing Floating Production Installations 2017, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction. (See 1-1-4/3.3 of the ABS Rules for Conditions of Cla
3、ssification Offshore Units and Structures (Part 1).) PART 1 CONDITIONS OF CLASSIFICATION CHAPTER 1 SCOPE AND CONDITIONS OF CLASSIFICATION SECTION 2 SYSTEM CLASSIFICATION, SYMBOLS, AND NOTATIONS 5 Additional Class Notations 5.9 Strength Criteria for Ship-Type Installations (1 July 2012) (Revise Subpa
4、ragraph 1-1-2/5.9.3, as follows:) 5.9.3 Relocation of FPI (1 July 2017) As site specific units, FPIs are designed and classed taking into consideration the location where they will operate and the intended period of operation. When the FPI is relocated to a new site, either within the same field or
5、in a different operating area, or when the intended period of operation is extended, the strength of the unit is to be reassessed to satisfy that the unit will remain in compliance with applicable requirements as described below. 5.9.3(a) Relocation within the Same Field. When an FPI is relocated wi
6、thin the same field or the same operating area, the environmental conditions are expected to remain identical to those considered during the original classification process for the current site. If the environmental conditions for the field or operating area have been revised since the original appr
7、oval due to new environmental data or changing environmental conditions (e.g., new environmental data in the Gulf of Mexico after hurricanes Rita and Katrina), the Coastal State may require the use of new environmental conditions for the relocation, in which case the same requirements as relocation
8、to a different operating area will apply. The expected operating life in the new location may be within the originally considered design life or otherwise, it may extend beyond the original design life period. In the latter case, in addition to the requirements for relocation, the requirements for l
9、ife extension will apply. ABSRULES FOR BUILDING AND CLASSING FLOATING PRODUCTION INSTALLATIONS .2017 1 Notice No. 1 July 2017 It is expected that relocation within the same field will require at least a new position mooring and anchoring system for the new site and probably, modifications to the pro
10、cess facilities. For the relocation within the same field, without exceeding the original design life of the unit, the following actions will to be required: Design review and surveys related to the new position mooring system and anchoring. Design review and surveys related to the modifications to
11、the process facilities, if applicable. Design review and surveys related to any other modifications affecting class items. Drydocking survey, including gauging, with steel renewals as necessary to bring the unit to a satisfactory condition to complete the remaining design life at the specific site.
12、Structural strength analysis and fatigue life re-evaluation for the hull structure, turret, module structures, etc., will not to be required, unless structural modifications are performed or current environmental conditions are harsher than the environmental conditions considered in the original des
13、ign. For structures, systems or equipment not modified and maintained per original design, design review is to be based on the design codes used in the original design with current environmental data. For added or modified structures, systems or equipment, design review is to be based on the design
14、codes at the time of the contract for the relocation with current environmental data. Surveys are to be based on the current rule requirements, see Part 7 of these Rules. 5.9.3(b) Relocation to a Different Operating Area. When an FPI is relocated to an operating area where the environmental conditio
15、ns are different than those at the original site, the structural strength and fatigue life of the unit will need to be reassessed for the new conditions. However, if the new location has milder environmental conditions than the current site, the reassessment may not need to be performed provided tha
16、t the unit is kept under the same structural condition as in the original site and the design fatigue life of the unit is not extended. Relocation to a different operating area will require a new position mooring and anchoring system for the new site and most probably, extensive modifications to the
17、 process facilities. For the relocation to a different operating area, the following actions will be required: Structural strength analysis and fatigue life re-evaluation for the hull structure, turret, module structures, etc. (except as noted above). Design review and surveys related to the new pos
18、ition mooring system and anchoring. Design review and surveys related to the modifications to the process facilities. Design review and surveys related to any other modifications affecting class items. Drydocking survey, including gauging, with steel renewals as necessary to bring the unit to a sati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS82NOTICE12017RULESFORBUILDINGANDCLASSINGFLOATINGPRODUCTIONINSTALLATIONS2017PDF

链接地址:http://www.mydoc123.com/p-400958.html