VDA 4965-1-2010 Engineering Change Management (ECM) - Part 1 ECR Version 3 0《工程变更管理(ECM) 第1部分 有效客户反应(ECR)》.pdf
《VDA 4965-1-2010 Engineering Change Management (ECM) - Part 1 ECR Version 3 0《工程变更管理(ECM) 第1部分 有效客户反应(ECR)》.pdf》由会员分享,可在线阅读,更多相关《VDA 4965-1-2010 Engineering Change Management (ECM) - Part 1 ECR Version 3 0《工程变更管理(ECM) 第1部分 有效客户反应(ECR)》.pdf(97页珍藏版)》请在麦多课文档分享上搜索。
1、A Joint PublicationECM RecommendationPart 1 (ECR) Version 2.0, Issued Aug. 2009 Replacements: Version 1.0 VDA 4965 Part 1 Version 3.0, issued Jan. 2010 Replacements: Version 2.0 ECM RecommendationPart 1 - ECRVersion 2.0, Issued: Aug. 2009 Replaces: Version 1.0 iii SASIG Automotive Industry Action Gr
2、oup (U.S.), Groupement pour lAmelioration des Liaisons dans lIndustrie Automobile (France), Japan Automobile Manufacturers Association (Japan) / Ja-pan Auto Parts Industries Association (Japan), Odette Sweden AB (Sweden), and Verband der Automobilindustrie (Germany) are members of the Strategic Auto
3、motive product data Standards Industry Group- SASIG. These organisations are cooperating in the creation, dis-tribution and use of joint documents, including PDQ (Product Data Quality), PDM Assembly Data Exchange, XMTD (Exchange and Management of Technical Data), DEV (Digital Engi-neering Visualizat
4、ion). SASIG Publications A SASIG publication reflects a consensus of those substantially concerned with its scope and provisions. A SASIG publication is intended as a guide to aid the manufacturer, the con-sumer and the general public. The existence of a SASIG publication does not in any respect pre
5、clude anyone from manufacturing, marketing, purchasing, or using products, processes, or procedures not conforming to the publication. Cautionary Notice SASIG publications are subject to periodic review and users are cautioned to obtain the lat-est editions. Maintenance Procedure Recognizing that th
6、is joint publication may not cover all circumstances, SASIG has estab-lished a maintenance procedure. Please refer to the Maintenance Request Form at the back of this document to submit a request. Contact information Contacts information to SASIG is available on http:/. Copyright and Trademark Notic
7、e The contents of this publication is copyrighted by members of SASIG, i.e. AIAG, GALIA, JAMA/JAPIA, Odette Sweden, and VDA. Copyright is not claimed as to any part of an origi-nal work prepared. ECM RecommendationPart 1 - ECRVersion 2.0, Issued: Aug. 2009 Replaces: Version 1.0 v Table of Contents 1
8、 ECR Reference Process Fundamentals 1 1.1 ECR models and messages related to ECM. 1 1.2 ECR specific rules 1 2 Communication and the ECR Reference Process3 2.1 Overview of the modelling concept and the notation used 3 2.2 Overview of the ECR Reference Process . 4 2.2.1 Purpose4 2.2.2 Phases of the E
9、CR Reference Process 4 2.2.3 Normal flow and status 5 2.2.4 Special flow variants and exceptions.7 2.3 ECR organization model and roles . 12 2.4 ECR Reference Process. 15 2.4.1 Inquiry of ECR phase.15 2.4.2 Creation of ECR phase18 2.4.3 Technical Analysis of ECR phase21 2.4.4 Commenting on ECR phase
10、25 2.4.5 Approval of ECR phase .30 3 ECR Interaction Scenarios and ECR Messages .37 3.1 Description method. 38 3.2 ECR Interaction Scenarios . 39 3.2.1 ECR Interaction Scenario IS1 Participant proposal for a change.39 3.2.2 ECR Interaction Scenario IS2 Participant comments.41 3.2.3 ECR Interaction S
11、cenario IS3 Participant approval44 3.2.4 ECR Interaction Scenario IS4 Participant detailing and comments .47 3.3 ECR Messages 50 3.3.1 Data-oriented ECR Messages.50 3.3.2 Process-oriented ECR Messages52 3.3.3 Use of ECR Messages within the predefined ECR Interaction Scenarios 60 3.3.4 ECR Message he
12、aders and control information62 4 ECR Data Model.63 4.1 Description method. 63 4.2 Usage of the ECM Data Model for the ECR Reference Process. 63 4.3 Usage of ECM Data Model objects within ECR Messages . 69 Appendix A: ECR Interaction Scenario Protocol Specifications71 A.1 Purpose instead it describe
13、s the ECM Recommendation Part 1 ECR Communication and the ECR Reference Process 4 Replaces: Version 1.0 Version 2.0, Issued: Aug. 2009 primary activities in a way which is easy to understand. Appendix A of Part 0 contains notes on the notation used. The following should be noted with respect to the
14、terms “phase“ and “activity“: In the descrip-tion of the phase diagrams, the term “phase“ is used throughout to refer to the processing steps; in the descriptions of the activity diagrams, the term “activity“ is used throughout. For each of the phases described in detail, there is either one activit
15、y which has the same name, or the phase comprises a number of activities. Similarly, the milestones used in the phase diagrams have corresponding states in the activity diagrams. 2.2 Overview of the ECR Reference Process The purpose of the phase will first be described, followed by an overview of ea
16、ch phase. This is then followed by more detailed descriptions of the activities in the course of the normal flow and of special flow variants and exceptions (cancellation, fast-track execution, rollback). 2.2.1 Purpose The objective of the ECR Refernece Process is to determine the extent and impact
17、of the planned change, its feasibility (with regard to design, manufacturing), affected persons or departments, affected parts/documents, the collection of comments and assessments by ex-perts concerning costs, dates, quality, weight, preparation time, and others, and finally the decision to accept
18、or reject the planned change. 2.2.2 Phases of the ECR Reference Process In the context of the overall ECM Reference Process the Specification and Decision on Change phase begins after milestone M3, Potential Solution Defined, has been reached. It starts with the Inquiry of ECR phase, in which a prop
19、osal for a change is received and checked to see whether it will be pursued (see Figure 1). If the change proposal is to be pur-sued further, milestone M3.1, ECR Initiated, is reached and the proposal for a change is cre-ated as a change request in the Creation of ECR phase and is prepared for furth
20、er evalua-tion. Inquiryof ECRCreationof ECRTechnical Analysisof ECRCommentingon ECRApprovalof ECRM3.1:ECRInitiatedM4:ECR ApprovedM3:PotentialSolutionDefinedM3.2:ECRCreatedM3.3:ECRDetailedM3.4:ECRCommentedFigure 1: Phases of the ECR Reference Process If the ECR is to be pursued further, then mileston
21、e M3.2, ECR Created, is reached and tech-nical analysis and evaluation of the ECR is carried out in the Technical Analysis of ECR phase. After finishing the analysis milestone M3.3, ECR Detailed, is reached and the ECR is evaluated from the point of view of other specialist departments in the Commen
22、ting on ECR phase. After finishing commenting milestone M3.4 ECR Commented, is reached, and a deci-sion is made with respect to the ECR in the Approval of ECR phase. If the ECR is approved, ECM RecommendationPart 1 ECRCommunication and the ECR Reference ProcessVersion 2.0, Issued: Aug. 2009 Replaces
23、: Version 1.0 5 the Specification and Decision on Change phase ends and milestone M4, ECR Approved, of the overall ECM Reference Process is reached. 2.2.3 Normal flow and status The ECR Reference Process starts with the status pending when a proposal for an ECR is received from one of the possible i
24、nitiators of an ECR in the activity Inquiry of ECR (see Fig-ure 2). The proposal for an ECR may be accepted or rejected (documented in ACCEPTANCE.decision as shown). In the case of rejection, the ECR Reference Process is terminated with the status disapproved (documented in the value STATUS.status),
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VDA496512010ENGINEERINGCHANGEMANAGEMENTECMPART1ECRVERSION30 工程 变更 管理 ECM 部分 有效 客户 反应 ECRPDF

链接地址:http://www.mydoc123.com/p-1075199.html