UL SUBJECT 1854-2001 Outline of Investigation for Excavation Liners for Secondary Containment of Flammable and Combustible Liquids (Issue 2)《易燃和可燃液体外壳安全壳坑道划线器的调查大纲 发布编号 2》.pdf
《UL SUBJECT 1854-2001 Outline of Investigation for Excavation Liners for Secondary Containment of Flammable and Combustible Liquids (Issue 2)《易燃和可燃液体外壳安全壳坑道划线器的调查大纲 发布编号 2》.pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 1854-2001 Outline of Investigation for Excavation Liners for Secondary Containment of Flammable and Combustible Liquids (Issue 2)《易燃和可燃液体外壳安全壳坑道划线器的调查大纲 发布编号 2》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、October 18, 20011SUBJECT 1854OUTLINE OF INVESTIGATIONFOREXCAVATION LINERS FOR SECONDARY CONTAINMENT OF FLAMMABLEAND COMBUSTIBLE LIQUIDSIssue Number: 2OCTOBER 18, 2001COPYRIGHT 2001 UNDERWRITERS LABORATORIES INC.OCTOBER 18, 2001SUBJECT 18542No Text on This PageCONTENTSFOREWORD 6INTRODUCTION1 Scope .7
2、2 General 72.1 Units of measurement .72.2 Components .72.3 Undated references .8CONSTRUCTION3 General 8PERFORMANCE4 General 85 Permeation .96 Volume Change and Extraction of Soluble Material 107 Soil Burial .108 Air Oven Aging 119 Immersion 1110 Penetration Resistance 1211 Cold Impact 1212 Leakage T
3、est 1213 Light and Water Exposure .12FABRICS14 Breaking Load and Elongation 1315 Tear Strength 1316 Seam Strength .1317 Abrasion .13REINFORCED RIGID PLASTIC18 Flexural Strength .1419 Izod Impact 1420 Joint Strength 14NON-RIGID PLASTIC21 Tensile Strength and Elongation 1422 Tear Strength 1523 Seam St
4、rength .1524 Tensile Impact 1525 Environmental Stress Cracking Resistance 15OCTOBER 18, 2001 SUBJECT 1854 3MARKING26 General 15OCTOBER 18, 2001SUBJECT 18544OCTOBER 18, 2001 SUBJECT 1854 5No Text on This PageFOREWORDA. This Outline of Investigation contains basic requirements for products covered by
5、UnderwritersLaboratories Inc. (UL) under its Follow-Up Service for this category within the limitations given below andin the Scope section of this Outline of Investigation. They are subject to revision as further experience andinvestigation may show is necessary or desirable.B. The observance of th
6、ese requirements by a manufacturer is one of the conditions of the continuedcoverage of the manufacturers product.C. A product which complies with the text of this Outline of Investigation will not necessarily be judged tocomply with the Outline of Investigation if, when examined and tested, it is f
7、ound to have other featureswhich impair the level of safety contemplated by these requirements.D. A product that contains features, characteristics, components, materials, or systems new or differentfrom those covered by the requirements in this Outline of Investigation, and that involves a risk of
8、fire orof electric shock or injury to persons shall be evaluated using appropriate additional component andend-product requirements to maintain the level of safety as originally anticipated by the intent of thisOutline of Investigation. A product whose features, characteristics, components, material
9、s, or systemsconflict with specific requirements or provisions of this Outline of Investigation does not comply with thisOutline of Investigation. Revision of requirements shall be proposed and adopted in conformance with themethods employed for development, revision, and implementation of this Outl
10、ine of Investigation.E. UL, in performing its functions in accordance with its objectives, does not assume or undertake todischarge any responsibility of the manufacturer or any other party. The opinions and findings of ULrepresent its professional judgement given with due consideration to the neces
11、sary limitations of practicaloperation and state of the art at the time the Outline of Investigation is processed. UL shall not beresponsible to anyone for the use of or reliance upon this Outline of Investigation by anyone. UL shall notincur any obligation or liability for damages, including conseq
12、uential damages, arising out of or inconnection with the use, interpretation of, or reliance upon this Outline of Investigation.F. Many tests required by the Outline of Investigations of UL are inherently hazardous and adequatesafeguards for personnel and property shall be employed in conducting suc
13、h tests.OCTOBER 18, 2001SUBJECT 18546INTRODUCTION1 Scope1.1 This outline covers the investigation of materials and components of excavation liners for secondarycontainment of flammable and combustible liquids. Excavation liners can be:a) Pre-engineered systems which are essentially complete when shi
14、pped from the factory, orb) Field assembled systems.1.2 This outline does not cover leak detection equipment and monitoring systems.2 General2.1 Units of measurement2.1.1 Values stated without parentheses are the requirement. Values in parentheses are explanatory orapproximate information.2.2 Compon
15、ents2.2.1 Except as indicated in 2.2.2, a component of a value covered by this outline of investigation shallcomply with the requirements for that component.2.2.2 A component need not comply with a specific requirement that:a) Involves a feature or characteristic not needed in the application of the
16、 component in thevalue covered by this outline of investigation, orb) Is superseded by a requirement in this outline of investigation.2.2.3 A component shall be used in accordance with its rating established for the intended conditions ofuse.2.2.4 Specific components are incomplete in construction f
17、eatures or restricted in performancecapabilities. Such components are intended for use only under limited conditions, such as certaintemperatures not exceeding specified limits, and shall be used only under those specific conditions.2.2.5 Components such as fittings, closures, sealants and gaskets a
18、re to be investigated with respect tosuitability for use as part of the secondary containment system. Factors which are to be considered wheninvestigating components are:a) Exposure to stored product and ground water;b) Structural integrity;c) Resistance to aging; andd) Resistance to corrosion.Test
19、methods appropriate for investigation of the component under consideration will be utilized.OCTOBER 18, 2001 SUBJECT 1854 72.3 Undated references2.3.1 Any undated reference to a code or standard appearing in the requirements of this outline ofinvestigation shall be interpreted as referring to the la
20、test edition of that code or standard.CONSTRUCTION3 General3.1 Pre-Engineered Systems are essentially complete when shipped from the factory. All major seamsand welds are completed under controlled conditions at the factory.3.2 Pre-Engineered Systems are shipped to the excavation site with an instal
21、lation manual and areintended for installation in accordance with the instructions in the installation manual.3.3 Field Engineered Systems are essentially constructed at the excavation site.3.4 Installation of the excavation liner shall be conducted under the supervision of the liner manufacturerfol
22、lowing accepted installation practices.3.5 Installation instructions shall be provided with each excavation liner. The instructions shall include testinstructions for the installer to verify that the seams, welds, or joints have no discontinuities or voids.PERFORMANCE4 General4.1 Materials for excav
23、ation liners are classed as:a) Fabric,b) Reinforced rigid plastic, orc) Non-rigid plastic.All materials shall be subjected to the tests in Sections 5 13. Each material class shall also be subjectedto the applicable additional tests specified in Sections 14 25.4.2 Materials shall be tested for resist
24、ance to petroleum products only, or resistance to petroleumproducts and gasohol (gasoline and maximum 10 percent ethanol), or resistance to petroleum products,alcohols, and alcohol-gasoline mixtures.OCTOBER 18, 2001SUBJECT 185485 Permeation5.1 Permeation tests are to be conducted as described in 5.2
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT18542001OUTLINEOFINVESTIGATIONFOREXCAVATIONLINERSFORSECONDARYCONTAINMENTOFFLAMMABLEANDCOMBUSTIBLELIQUIDSISSUE2

链接地址:http://www.mydoc123.com/p-1069199.html