1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 86 12.07 40 (February 2012)-Preparing Activity: NASA SupersedingUFGS-01 86 12.07 40 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2012*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTIO
2、N 01 86 12.07 40RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS02/12PART 1 GENERAL1.1 SYSTEM DESCRIPTION1.2 REFERENCES1.3 SUBMITTALS1.4 DESIGN DATA1.5 QUALITY ASSURANCE1.6 WARRANTYPART 2 PRODUCTS2.1 PRODUCT DATA2.1.1 Manufacturer Product Data2.1.2 Certification Data2.1.3 Specific Equipment Da
3、ta2.1.4 Extra MaterialsPART 3 EXECUTION3.1 INSTALLATION3.2 EXAMINATION3.3 FIELD QUALITY CONTROL AND ACCEPTANCE TESTING3.3.1 Predictive Testing and Inspection3.4 OPERATIONS AND MAINTENANCE3.5 ACCEPTANCE DOCUMENTATION- End of Section Table of Contents -SECTION 01 86 12.07 40 Page 1Provided by IHSNot f
4、or ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 86 12.07 40 (February 2012)-Preparing Activity: NASA SupersedingUFGS-01 86 12.07 40 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated
5、January 2012*SECTION 01 86 12.07 40RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS02/12*NOTE: This specification covers the AIR FORCE ARMY NASA NAVY requirements forReliability Centered Building and Equipment Acceptance for Mechanical systems. The contents universally apply to mechanical syst
6、ems and may be utilized by other organizations, if deemed beneficial.Refer to Section 01 83 00.07 40 RELIABILITY CENTERED ACCEPTANCE FOR FACILITY SHELLS (foundations, structure, walls, openings, roofs, insulation and vapor barrier systems, etc.).Refer to Section 01 83 13.07 40 RELIABILITY CENTERED A
7、CCEPTANCE FOR SUPERSTRUCTURE PERFORMANCE REQUIREMENTS for externally exposed structures such as communication towers, launch facilities; and partially open shelters such as those for fueling chemical storage, as well as underground special structures for explosives and ordinance.Refer to Section 01
8、86 26.07 40 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS for facility electrical power and distribution systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit
9、this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, su
10、ggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*SECTION 01 86 12.07 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 1 GENERAL1.1 SYSTEM DESCRIPTIONTh
11、is specification establishes acceptance requirements to ensure building equipment and systems installed by the Contractor have been installed properly and contain no identifiable defects that will shorten the design life of the equipment. These requirements utilize Predictive Testing “DO“ for Distri
12、ct Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NA
13、SA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation iden
14、tifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsQuality Control Plan; G; G, _Material, Equipment, and Fixture Lists; G; G, _SD-02 Shop DrawingsConnection Diagrams; G; G,
15、 _Bearing Layout; G; G, _Fabrication Drawings; G; G, _Installation Drawings; G; G, _SD-03 Product DataManufacturers Catalog Data; G; G, _Equipment Foundation Data; G; G, _Specific Equipment Data; G; G, _Spare Parts List; G; G, _SECTION 01 86 12.07 40 Page 4Provided by IHSNot for ResaleNo reproductio
16、n or networking permitted without license from IHS-,-,-Warranty; G; G, _SD-05 Design DataDesign Analysis and Calculations; G; G, _SD-06 Test ReportsAlignment Test; G; G, _Balancing Test; G; G, _Borescope Inspection Test; G; G, _Code and Requirements Verification Test; G; G, _Cold Starting Test; G; G
17、, _Cooling System Evaluation Test; G; G, _Ductwork Leakage Test; G; G, _Exhaust Emissions Test; G; G, _Flux Analysis Test; G; G, _High Voltage Test; G; G, _Hydraulic Oil Test; G; G, _Hydrostatic Test; G; G, _Infrared Thermography Test; G; G, _Insulation Power Factor Test; G; G, _Insulation Resistanc
18、e Test; G; G, _Lubricating Oil Test; G; G, _Mechanical Performance Test; G; G, _Motor Circuit Evaluation Test; G; G, _Noise Level Acceptance Test; G; G, _Operational Fire Damper Test; G; G, _Performance Test; G; G, _Power/Output Test; G; G, _Thermodynamic Performance Test; G; G, _Ultrasonic (Airborn
19、e) Test; G; G, _Ultrasonic (Pulse) Test; G; G, _Vibration Analysis Test; G; G, _SECTION 01 86 12.07 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Visual Inspection; G; G, _Warranty Test; G; G, _SD-07 CertificatesCertificates; G; G, _SD-08
20、Manufacturers InstructionsManufacturers Instructions; G; G, _SD-10 Operation and Maintenance DataOperations and Maintenance Manuals; G; G, _SD-11 Closeout SubmittalsRecord Drawings; G; G, _Acceptance Documentation; G; G, _1.4 DESIGN DATASubmit applicable design analysis and calculations for the equi
21、pment listed below as instructed to by the project specification. a. Blowersb. Boilersc. Compressorsd. Condenserse. Cranesf. Diesel Engineg. Diesel Generatorh. Gearboxesi. Fansj. Fluid Pipingk. Heat exchangersl. Heat Exchange Cooling Towerm. Hvac Ductsn. Material Handling Conveyoro. Miscellaneous Sa
22、fety Washp. MotorsSECTION 01 86 12.07 40 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-q. Pumpsr. Valvess. Steam Trapst. Turbine Expanderu. Turbines- Gasv. Turbines- Steam1.5 QUALITY ASSURANCESubmit a Quality Control plan outlining the intend
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS01861207402012RELIABILITYCENTEREDACCEPTANCEFORMECHANICALSYSTEMSPDF

链接地址:http://www.mydoc123.com/p-1019622.html