1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 83 13.07 40 (February 2012)-Preparing Activity: NASA SupersedingUFGS-01 83 13.07 40 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2012*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTIO
2、N 01 83 13.07 40RELIABILITY CENTERED ACCEPTANCE FOR SUPERSTRUCTURE PERFORMANCE REQUIREMENTS02/12PART 1 GENERAL1.1 SYSTEM DESCRIPTION1.2 REFERENCES1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 WARRANTYPART 2 PRODUCTS2.1 PRODUCT DATA2.1.1 Manufacturers Product Data2.1.2 Certification Data2.1.3 Specific Equip
3、ment Data2.1.4 Extra MaterialsPART 3 EXECUTION3.1 INSTALLATION3.2 EXAMINATION3.3 FIELD QUALITY CONTROL AND ACCEPTANCE TESTING3.3.1 Predictive Testing and Inspection Tests3.3.2 Baseline Data from Verification Testing3.4 OPERATIONS AND MAINTENANCE3.5 ACCEPTANCE DOCUMENTATION- End of Section Table of C
4、ontents -SECTION 01 83 13.07 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 83 13.07 40 (February 2012)-Preparing Activity: NASA SupersedingUFGS-01 83 13.07 40 (February 2010)UNIFIED FACILITIES GUIDE
5、SPECIFICATIONSReferences are in agreement with UMRL dated January 2012*SECTION 01 83 13.07 40RELIABILITY CENTERED ACCEPTANCE FOR SUPERSTRUCTURE PERFORMANCE REQUIREMENTS02/12*NOTE: This specification covers the AIR FORCE ARMY NASA NAVY requirements for Reliability Centered Building and Equipment Acce
6、ptance for Superstructures Performance requirements (bridges, cranes, towers, locks, storage tanks, etc.). The contents universally apply to structural systems and may be utilized by other organizations, if deemed beneficial.Refer to Section 01 83 00.07 40 RELIABILITY CENTERED ACCEPTANCE FOR FACILIT
7、Y SHELLS (foundations, structure, walls, openings, roofs, insulation and vapor barrier systems, etc.).Refer to Section 01 86 12.07 40 RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS for HVAC and Plumbing systems.Refer to Section 01 86 26.07 40 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SY
8、STEMS for facility electrical power and distribution systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by
9、 adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specificatio
10、n are welcome and should be submitted as a Criteria Change Request (CCR).*SECTION 01 83 13.07 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 1 GENERAL1.1 SYSTEM DESCRIPTIONThis specification establishes acceptance requirements to ensur
11、e all equipment and structural systems installed by the Contractor have been installed properly and contain no identifiable defects that will shorten the design life of the equipment or structure. These requirements utilize Predictive Testing “DO“ for District Office (Engineering Division or other o
12、rganization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second brackete
13、d item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identifies the office that will review the sub
14、mittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsMaterial, Equipment, and Fixture Lists; G; G, _Quality Control Plan; G; G, _SD-02 Shop DrawingsFabrication Drawings; G; G, _Layout Drawings; G; G, _SD-03 Product D
15、ataManufacturers Catalog Data; G; G, _Specific Equipment Data; G; G, _Spare Parts List; G; G, _Warranty; G; G, _SD-04 SamplesSamples; G; G, _SD-06 Test ReportsSECTION 01 83 13.07 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Alignment (Las
16、er preferred); G; G, _Balance Test and Measurement; G; G, _Hydrostatic Test; G; G, _Infrared Thermography Test; G; G, _Mechanical Performance Test; G; G, _Tank Integrity Test; G; G, _Ultrasonic (Airborne) Test; G; G, _Verification of Liquid Level; G; G, _Verification of Relief Devices; G; G, _Visual
17、 Inspection; G; G, _SD-07 CertificatesCertificates; G; G, _SD-08 Manufacturers InstructionsManufacturers Instructions; G; G, _SD-10 Operation and Maintenance DataOperations and Maintenance Manuals; G; G, _SD-11 Closeout SubmittalsAcceptance Documentation; G; G, _Baseline Data Report; G; G, _1.4 QUAL
18、ITY ASSURANCESubmit a Quality Control plan outlining the intended methods of receiving, testing, and installing equipment and structural components. The RCBEA GUIDE specifies minimum testing and test equipment requirements. Use certified personnel trained in the appropriate acceptance testing PT iss
19、ued directly to the Government. Perform SECTION 01 83 13.07 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-corrective action that becomes necessary because of defective materials and workmanship while system is under warranty 7_ days after
20、notification, unless additional time is approved by the Contracting Officer. Failure to perform repairs within the specified period of time constitutes grounds for having the corrective action and repairs performed by others and the cost billed to the Contractor. Provide a 1_ year(s) minimum contrac
21、tor installation warranty.PART 2 PRODUCTS2.1 PRODUCT DATASubmit material, equipment, and fixture lists for all equipment, structural components, materials, and fixtures planned for use to complete the job before commencing work. Include at a minimum, the items description, quantity, manufacturers st
22、yle or catalog numbers, and specification and drawing reference numbers. Provide a complete list of construction equipment to be used.Provide product samples for structural system components, at a minimum include _ penetrations, fasteners, and finish color swatches for Contracting Officer approval p
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS01831307402012RELIABILITYCENTEREDACCEPTANCEFORSUPERSTRUCTUREPERFORMANCEREQUIREMENTSPDF

链接地址:http://www.mydoc123.com/p-1019621.html