NAVY MIL-I-60476 A-1979 IGNITER MARK 125 MOD 5 LOADING ASSEMBLING AND PACKING《MARK 125 MOD 5引爆装置的装载 组装和包装》.pdf
《NAVY MIL-I-60476 A-1979 IGNITER MARK 125 MOD 5 LOADING ASSEMBLING AND PACKING《MARK 125 MOD 5引爆装置的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-60476 A-1979 IGNITER MARK 125 MOD 5 LOADING ASSEMBLING AND PACKING《MARK 125 MOD 5引爆装置的装载 组装和包装》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、/- 6;-37- 19 MTL- I -60476A( MI ) - 1 7 August 1979 Superseding 15 July 1967 MIL-I -60476( MU) MI L I TARY SPEC I FI CAT I ON IGNITER, MARK 125 MOD 5, LOADING ASSEMBLING AND PACKING This specification is approved for use by the US Army Missile Command, Department of the Army, and is avail- able for
2、use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1. - -. 1.1 Scope. This specification covers the quality assurance provisions and special requirements not covered by the drawings for the type of igniter designated MARK 125 MOD 5. . - -. -.- ._ - . . : . :_ ._.-= . .i :-. :
3、 . P. .“ . i:- . -, _ ._ i-; : a -. . .- 7 zycy - f- * DRAWINGS I-. i Navy 457888 - Igniter MI! 125 MG2 5 Looded Assembly LD 267523 - Container MK E, MOD C! * * * (Copies of specifications, standards, drawings, and pub1 i cations requi red by contractors in connection with specific procurement funct
4、ions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS * 3.1 Material. Materials shall be in accordance with drawings and specifications specified herein. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license f
5、rom IHS-,-,-flIL-I-bO476A 13 W 7Ob 0338b75 2 MIL- I -60476A( MI) 3.1.1 Char e The charge shall consist of the proper ratio by weight of black powd-dgi + 2x1, and coated magnesium powder (20 + 2%) evenly blended. The ignitercharge weight shall be between 8.5 andl0.5 grams, incl usi ve. * 3.1.2 Moistu
6、re content. The moisture content of the black powder, as loaded, shall be 0.5% maximum. * 3.2 Parts. The parts shall comply with all requirements specified 3.2.1 in MIL-I-60mgniter, MARK 125 MOD 5, Parts For. in MIL-S-1497 + , Squib MARK 1 MOD O, For 2.75 Inch Rocket. S uib. The squib shall comply w
7、ith all requirements specified * 3.3 Igniter assemblx. No powder grains shall be present at the con- tact surfaces of the cover and case before crimping. The completed igniter assembly shall not evidence, on any external surface, any trace of explosive composition or extraneous material affecting us
8、e, safety, or appearance. A suitable shorting device or method shall be applied to the bare ends of the lead wires before storage and shipping. _- _-._-. -_ * 3.4 Igniter functioning. The igniters, when subjected to a direct current (D.E.) firing current of 1.5 + 0.15 amperes at the specified temper
9、a- tures, shall function with no indicatTon of ejecta. Each igniter shall function within the time specified in 4.3.3.5. 3.5 Transporation vibration. The igniters, after being subjected to conditions simulating those encountered in transportation and service, shall be airtight, have proper electrica
10、l continuity, and insulation resistance, and shall function at the three temperatures specified. The igniter, after being vibrated and checked for electrical cont nu ty, and insulation resistance, shall be subjected to the airtightness test and shall show no evidence of air leakage at normal room te
11、mperature of 7OoF 5 10F (21OC +- 5.5OC). 3.7 Workmanshi . Loading and assembling shall be accomplished in accordance w -mi6-E est practices. All parts shall be free of any foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning
12、agent. Surface coatings shall be continuous except for a few light scratches which do not expose base material. All required marking shall be neat and sharply defined. .I - _ t i. - _.- - . . . . . _ ._ I. -.-. _. -_ _- - 3.6 Airti htness + * . _ - .VA f .,.- I- i *, . -:. -1 s -. -_ m. i :i: I -. c
13、 ., -. . =* -. . 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_I I - MIL-I-hO47hA li3 = 9379906 033b96 4 W MIL- I-60476A (MI) 3.8 First article inspection. This specification makes provisions for first article inspection. article samples by the
14、contractor shall be specified in the contract. Requirements for the submission of first 4. QUALITY ASSURANCE PROVISIONS * 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of al 1 inspection requirements a
15、s specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any comercial laboratory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to a
16、ssure supplies and services conform to prescribed requirements. shall be made to MIL-STD-109 In order to define terms used herein. The provisions of MIL-A-2550 shall apply. product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a c
17、ertificate which attests that the information provided is correct and applicable to the product being submitted: Reference 4.1.1 Submission of product. At the time the completed lot of a. A statement that the lot complies with all of the quality b. Number of units product inspected. c. Results obtai
18、ned, by defect code, for all inspections performed. d. Drawing, specification number and date, together with an e. Certificates of conformance on all material purchased by the assurance provisions specified within this Specification. i . identification and date of changes. contractor when such mater
19、ial is controlled by Governwnt or commercial specifications referenced in any of the contractual documents. f. Number of items in the lot. g. Date submitted. The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiate
20、d by evidence of the agents authority wfll not be required with subscquent certificates unless during the course of the contract, this authority is vested in another agent of the certifying organization. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
21、,-,-_ NIL-I-bO47bA 13 797740b 0338677 b MIL-I -60476A( MI) 4.1.2 Government verification. Using the contractors written quality assurance procedure, this detailed specification, the applicable drawings and other contractual documents as a guide, the Government inspector shall verify at unscheduled i
22、ntervals, al 1 quality assurance operations performed by the contractor. Verification will be performed to the extent necessary to assure compliance with the contractual requirements. Severity of Government inspection of individual character- istics will be directly related to the seriousness of the
23、 classification assigned. In no instance will a characteristic classified “critical“ be accepted solely on the basis of the contractors records. 4.2 First Article Inspection f 4.2.1 First article sample. The contractor shall submit a first article sample of ninety (90) oaded assemblies and forty-fiv
24、e (45) unloaded assemblies to the Government for testing in accordance with the provisions of 4.2.2. All parts and materials shall be the same as will be used in production and shall be obtained from the same source of supply. Prior to submission, the sample shall be inspected by the contractor to t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI60476A1979IGNITERMARK125MOD5LOADINGASSEMBLINGANDPACKINGMARK125MOD5 引爆 装置 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-979924.html