ASTM D8014-2017 5625 Standard Guide for Selection of Membranes Used in Vegetative Roofing Systems《选择屋顶植物生长系统用薄膜的标准指南》.pdf
《ASTM D8014-2017 5625 Standard Guide for Selection of Membranes Used in Vegetative Roofing Systems《选择屋顶植物生长系统用薄膜的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM D8014-2017 5625 Standard Guide for Selection of Membranes Used in Vegetative Roofing Systems《选择屋顶植物生长系统用薄膜的标准指南》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D8014 17Standard Guide forSelection of Membranes Used in Vegetative RoofingSystems1This standard is issued under the fixed designation D8014; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、 number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 The purpose of this guide is to provide guidance in theselection of a suitable waterproofing membrane within avegetative roof system.
3、The guide offers various options forreviewing the membrane installation during and upon comple-tion of the installation and prior to the vegetative componentsbeing installed. This guide applies to membranes that do or donot require UV protection. For the purpose of this guide, thesupporting structur
4、e and roof deck are assumed to be mechani-cally and structurally sound and will accept the weight of thevegetative roof system including the membrane, insulation, andother roofing/waterproofing components including all compo-nents related to the vegetative layers as well as the requireddesign loads.
5、 Slope to drain at the membrane level is preferredand should be included where possible. Providing a replace-ment or a re-cover vegetative roofing system on an existingbuilding may require that the support structure be reinforced sothat it can safely support the additional weight of the vegetativero
6、of system and also provide the minimum live load capacityrequired by the building code.1.2 Design criteria associated with the vegetative portionsof the system are beyond the scope of this guide. Please referto Guide E2777.1.3 This standard does not purport to address all of thesafety concerns, if a
7、ny, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.1.4 This international standard was developed in accor-dance with internationally recognized
8、 principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2D1079 Terminology Relating
9、 to Roofing and WaterproofingD5957 Guide for Flood Testing Horizontal WaterproofingInstallationsD7877 Guide for Electronic Methods for Detecting andLocating Leaks in Waterproof MembranesE2777 Guide for Vegetative (Green) Roof Systems2.2 ANSI/SPRI Standards:3ANSI/SPRI VR-1 Procedure for Investigating
10、 Resistance toRoot Penetration on Vegetative Roofs2.3 Other Standards and Documents:FLL Guidelines for the Planning, Construction and Mainte-nance of Green Roofing Green Roofing Guideline Sec-tion 6.3 Protection Against Damage to the Waterproofing/ Root-resistant Membranes FLL Procedure for Investig
11、at-ing Resistance to Root Penetration of Roof Membranesand Protective Layers for Green Roofing43. Terminology3.1 DefinitionsFor definitions of terms used in this guide,see Terminology D1079.4. Significance and Use4.1 This guide provides the general information,procedures, and guidelines for the sele
12、ction of the waterproof-ing membrane to create a waterproofing system for a Vegeta-tive (Green) roof.4.2 This guide is not all inclusive; this guide is intended tosupplement detailed instructions from manufacturers, ASTMStandards, and building code requirements.5. Roof Design Classifications5.1 Type
13、s of Constructions or Applications:1This guide is under the jurisdiction of ASTM Committee D08 on Roofing andWaterproofing and is the direct responsibility of Subcommittee D08.24 on Sustain-ability.Current edition approved July 15, 2017. Published August 2017. DOI: 10.1520/D8014-17.2For referenced A
14、STM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4
15、th Floor, New York, NY 10036, http:/www.ansi.org.4Available from Forschungsgesellschaft Landschaftsentwicklung Landschafts-bau e.V. (FLL), Friedensplatz 4, 53111 Bonn, Germany, www.fll.de.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United State
16、sThis international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trad
17、e (TBT) Committee.15.1.1 NewA vegetative roof can be integrated with theother building elements during construction. All new compo-nents are used to construct the roofing/waterproofing system.Performance and service requirements of the vegetated roof areaddressed in the building design.5.1.1.1 Repla
18、cement (Total)Removal of existing roof sys-tem and all roof system components (roof membrane, coverboard, insulation, vapor retarder, support panels, etc.) down tothe supporting deck and replacing with new vegetative roofsystem and vegetative roof system components. Total replace-ment allows for an
19、evaluation of the roof deck and structure todetermine if additional repairs, structural enhancements, orreplacement are needed to accommodate the new vegetativeroof system.5.1.1.2 Replacement (Partial)Removal of existing roofmembrane system. Existing roof system components below themembrane, such as
20、 cover boards, insulation, vapor barrier, etc.,may be left in place if determined to meet the requirements forthe newly installed system. A thorough assessment of thosecomponents left in place should be carried out to determinetheir condition. Particular attention should be given to theirsecurement
21、and wind uplift resistance. All damaged, moisturecontaminated, and deteriorated components should be removedand replaced with new components.5.1.2 Re-coverA new waterproofing membrane is in-stalled over the existing membrane system. A thorough evalu-ation of the existing roof system, decking and str
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD801420175625STANDARDGUIDEFORSELECTIONOFMEMBRANESUSEDINVEGETATIVEROOFINGSYSTEMS 选择 屋顶 植物 生长 系统 薄膜

链接地址:http://www.mydoc123.com/p-526638.html