《ASTM C924-2002 Standard Practice for Testing Concrete Pipe Sewer Lines by Low-Pressure Air Test Method《低压空气试验法测试混凝土污水管道的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C924-2002 Standard Practice for Testing Concrete Pipe Sewer Lines by Low-Pressure Air Test Method《低压空气试验法测试混凝土污水管道的标准实施规程》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 924 02Standard Practice forTesting Concrete Pipe Sewer Lines by Low-Pressure AirTest Method1This standard is issued under the fixed designation C 924; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last
2、revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope1.1 This practice covers procedures for testi
3、ng concrete pipesewer lines, when using the low-pressure air test method todemonstrate the integrity of the installed material and theconstruction procedures. This practice is used for testing 4 to24-in. circular concrete pipe sewer lines utilizing gasketedjoints.1.2 This practice is also used as a
4、preliminary test to enablethe installer to demonstrate the condition of the line prior tobackfill.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health
5、 practices and determine the applica-bility of regulatory limitations prior to use (see Section 6,Safety Precautions).1.4 A complete metric companion to Practice C 924 hasbeen developedC 924 M; therefore, no metric equivalentsare presented in this practice.NOTE 1The user of this practice is advised
6、that air test criteriapresented in this practice are similar to those in general use. The test andcriteria have been used widely and successfully in testing smaller diameterpipe, but additional data are required to confirm the safety and applica-bility or develop criteria for pipe larger than 24 in.
7、 in diameter. Larger pipewill be accepted more conveniently by visual inspection and individualjoint testing.NOTE 2The user of this practice is advised that no correlation hasbeen found between air loss and water leakage.2. Referenced Documents2.1 ASTM Standards:C 822 Terminology Relating to Concret
8、e Pipe and RelatedProducts2C 969 Practice for Infiltration and Exfiltration AcceptanceTesting of Installed Precast Concrete Pipe Sewer Lines23. Terminology3.1 DefinitionsFor definitions of terms relating to con-crete pipe, see Terminology C 822.4. Summary of Practice4.1 The sewer line to be tested i
9、s plugged. Air is introducedat low pressures into the plugged line. The amount of air lossis used to determine the acceptability of the sewer line.5. Significance and Use5.1 This is not a routine test. The values recorded areapplicable only to the sewer being tested and at the time oftesting.6. Safe
10、ty Precautions6.1 The air test will be dangerous if a line is not preparedproperly and proper procedures are not followed.6.2 It is extremely important that plugs be installed andbraced in such a way as to prevent blowouts. It is alsoimperative that the pressure in the pipe be relieved completelybef
11、ore any plug is loosened for removal.NOTE 3As an example, 4-psi air pressure acting on one side of a15-in. plug results in a total force of approximately 700 lbf on the plug.Such a force is capable of causing the expulsion of an improperly installedplug.6.3 Pressurizing equipment shall include a 6-p
12、si pressurerelief device to reduce hazards and avoid over-pressurizationwith possible damage to the line.6.4 No one shall be allowed in or near the manholes duringpressurization, testing, or depressurization.7. Capacity of Air Compressor7.1 To provide satisfactory test results, the air compressorsha
13、ll be capable of pressurizing the sewer test section in therequired test time, or less, as determined by 9.1. The compres-sor capacity required to accomplish the pressurization is equalto the rate necessary to fill the sewer to the desired pressureplus the allowable air loss rate:1This practice is u
14、nder the jurisdiction of ASTM Committee C13 on ConcretePipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved Aug. 10, 2002. Published October 2002. Originallypublished as C 924 84. Last previous edition C 924 89(1997).2Annual Book of ASTM Standards,
15、 Vol 04.05.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.C 50.17D2LT1 Q (1)where:C = compressor capacity, cfm,T = required test time, or less, min,D = pipe internal diameter, ft,L = length of test section, ft, andQ = allowable air
16、loss, rate, cfm.8. Preparation of the Sewer Line8.1 Where practical, clean the sewer line prior to testing towet the pipe surface and eliminate debris.NOTE 4The user of this practice is advised that a wetted interior pipesurface is desirable and will produce more consistent test results. Air maypass
17、 through the walls of dry pipe. This can be overcome by wetting thepipe. If the problem persists, segmental testing of the line will establish ifthere is a significant leak.8.2 Plug all pipe outlets including laterals, which shall begiven special attention. Review safety precautions in Section 6.9.
18、Procedure9.1 Determine the test time for the sewer line to be tested byusing Table 1. Table 1 has been established using the criteriaspecified in Table 2, and the formulas contained in theAppendix. The test time is the time required for the pressure todrop from 3.5 psi to 2.5 psi.NOTE 5All test pres
19、sures are measured as gage pressure, which isdefined as any pressure greater than atmospheric pressure. Since waterproduces a pressure of 0.43 psi for every foot of depth, air test pressuresmust be increased to offset the depth of ground water over the sewer line.If the ground water level is 2 ft or
20、 more above the top of the pipe at theupstream end or if the air pressure required for the test is greater than 5-psigage, the air test method shall not be used. In that event, the infiltrationtest, (see Practice C 969), shall be used.9.2 Add air until the internal air pressure of the sewer line isr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC9242002STANDARDPRACTICEFORTESTINGCONCRETEPIPESEWERLINESBYLOWPRESSUREAIRTESTMETHOD 低压 空气 试验 测试 混凝土

链接地址:http://www.mydoc123.com/p-508824.html