NAVY MIL-P-82436-1966 PUMP FUEL《燃料泵》.pdf
《NAVY MIL-P-82436-1966 PUMP FUEL《燃料泵》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-P-82436-1966 PUMP FUEL《燃料泵》.pdf(29页珍藏版)》请在麦多课文档分享上搜索。
1、.- . ._ - - - - .-. - e-.-.- - - - - _. - . - . . . . 111- 1 MIL-P-82436 13 7777706 0360702 6 I, .- .- I- , / /v- 32500 psig P = pressure-psig Q = flow, gallons per minute of working fluid K = 1500 f 94 1. Inlet filter: 50 to 80 micron 4.5.4 Test orocedures. 4.5.4.1 Ooerational test. The pump, conta
2、ining twenty cubic centi- meters of oil, see 6.7, shall be mounted in the test stand and connected to. the auxiliary equipment. as follows: 300 f 10 psig to the bias port. rpm, set the inlet pressure to 7 f 3 psig. Screw (Figure 1) to obtain an outlet pressure of 2775 f 10 psig. the Adjusting Screw
3、Nut and secure with a lockwire. operated in accordance with the sequence indicated in Table XI. shall deliver the working fluid at the,pressures specified in Table XI, when the pump is driven at 3880 f 10 rpm, bias pressure is controlled within the respective parameters and the inlet pressure in mai
4、ntained between 4 and 10 psig. The orifice shall not be by-passed thus unloading the pump during the test. Prior to testing, the flow rate shall be preset remove the Adjusting Screw Nut (Figure i), apply a pressure of With the pump being driven at 3880 f 10 Position the Valve Adjusting Replace The p
5、ump The pump shall be 18 _- _- _- - - ._I_._-. - . - . . * Licensed by Information Handling Services- .- MIL-P-82436 (OS) . TABLE XI OPERATING CHARACTERISTICS Bias output - Minimum Pressure Pressure Operating Time Sequence Psig Psin At Each Sequence 1 O 2345 f 100 10 sec. 2 85 f 10 2475 f 75 10 irec
6、. 3 225 f 10 2675 t 75 10 sec. 4 445 i 10 2925 f 75 10 sec. 5. - 665-i 10 3855 f 100 10 sec. 6 1100 f 20 3575 Min. 10 sec. 7 665 f 10 3155 f 100 15 sec. 445 f 10 2925 f 75 10 sec. 8 9 225 f 10 2675 f 75 10 sec. 10 85 f 10 2475 f 75 10 sec. 11 O 2345 f 100 10 sec. -. 4.5.4.2 leakage from the pump dur
7、ing the acceptance test. Visual examination. There shall be no evidence of working fluid 4.5.5 Test data sheets. -All test data shall be recorded on data sheets by the supplier. the following information: Data sheets shall contain, but are not limited to, - a. Date - b. Date of calibration; Instrume
8、ntation Orifice . - c. Preset adjustment: - d. Test Data Bias pressure psig, Output pressure psig. Bias Pressure Output Pres sure Sequence Psig Psin 1 2 4 C 3 6 7 8 9 10 . 11 2. Working fluid leakage - f. Post-test servicing 19 Licensed by Information Handling ServicesI 4 MIL-P-Zq36 13 3777906 03607
9、23 T W MIL-P-824.36 (OS) 4.5.6 successfully pass the tests of 4.5.4.1 or 4.5.4.2 shall be cause for Determination of defect or failure. Failure of a pump to rejection of that pump. - 4.5.7 Post-test servicing and maintenance. The pump shall be dis- assembled, cleaned, and re-assembled after being te
10、sted. preventive solvent used shall be in accordance with 6.5. O-rings shall be replaced. shall not be removed. The corrosion All exposed Nut, Adjusting Screw Dwg. 2526741, Figure 1, 4.6 Periodic oroduction inspection. Periodic production samples shall be selected in accordance with 4.3.2. in accord
11、ance with the following plan: The samples shall be tested - a. The Sample of 1 unit from the first group of 30 units will be called the first Sample and will undergo the tests of Table XII for Sample 1. tests will Be as shown in Table XII. The Sample of 1 unit from the second and third groups of 30
12、units will be called the second and third Samples and will undergo the tests of Table XII for Samples 2 and 3 respectively. The sequence of tests will be as shown in Table XU. The next Sample will be selected from the next group of units regardless of whether the shift to Step 2 was made. Sample and
13、 will undergo the tests of Table XII for Sample 4, etc. The sequence of - b. - c. This Sample will be called the fourth TABLE XII PEXIODIC TEST SEQUENCE Sample and Test Sequence . Tests 1, 4, Etc. 2, 5, Etc. 3, 6, Etc. Vibration, Ready Condition Acceleration, Ready Condition Temperature and Humidity
14、 Low Temperature Operating Operational Service Life Shock, Ready Condition 1* High Temperature Operating 2 Operational Test 3 l* l* 2* 3* 2 4 5 3 6 4 7 I I * Visual Check After Testing 20 Licensed by Information Handling ServicesI . _._ -_- MIL-P-Zq3b 13 = 77777Ob 0360722 1 - R* -I , MIL-P-82436 (OS
15、) 4.6.1 . Test conditions. Unless otherwise specified, the pump shall be subjected to the periodic tests under tlie following conditions: - a. Temperature: Room ambient i-32 F to +98“ F - b. Altitude: . , Normal ground -atmospheric - c. Vibration: None pressure . - d. Humidity: Room ambient 4.6.2 th
16、e periodic tests shall be in accordance with 4.4.3. Test equipment and set-uE. The test equipment and Set-up for 4.6.3 Test procedures. 4.6.3.1 Vibration, ready condition. Vibration testing of the pump, in the ready condition, shall be performed in accordance with 4.4.4.2. _. . . 4.6.3.2 Acceleratio
17、n, ready condition. Acceleration testing of the pump, in the ready condition, shall be performed in accordance with 4.4.4.3. 4.6.3.3 Shock, ready condition. Shock testing of the pump, in the ready condition, shall be performed in accordance with 4.4.4.4. 4.6.3.4 Temperature and humidity, non-operati
18、ng condition. Temperature and humidity testing of the pump, in the non-operating condition, shall be performed in accordance with 4.4.4.5. 4.6.3.5 high temperature operating test in accordance with 4.4.4.7. High temperature operating. The pump shall be Subjected to the 4.6.3.6 low temperature operat
19、ing test in accordance with 4.4.4.6. Low temperature operating. The pump shall be subjected to the 4.6.3.7 tional test in accordance with 4.4.4.1. Operational test. The pump shall be subjected to the opera- 4.6.3.8 additional operational tests in accordance with 4.4.4.1. Operational service life. Th
20、e pump shall be subjected to 8 21 t Licensed by Information Handling ServicesI - - MIL-P-82436 13 = 7979406 0360723 3 = Ma-P-824.36 (OS) . 4.6.4 Test data. Test data shall be recorded in accordance with 4.4.5, as appropriate, and maintained as a part of the inspection record. 4.6:s Determination.of
21、defect or failure. Failure of the pump to successfully pass the tests in 4.6.3.1 through 4.6.3.8 shall be cause for withholding acceptance of all units on hand. be taken in accordance with 4.3.2. Corrective action shall 4.7 Examination of first echelon repair parts. 4.7.1 General. 4.7.1.1 components
22、 assembled into the end product and to first echelon repair parts. The information presented in this section is applicable to all The information is divided into the following major divisions: - a. - b. Parts covered by separate CDs Parts which are manufactured in accordance with Federal or Military
23、 specifications which contain adequate quality assurance provisions. c. Minor hardware items - 4.7.1.2 Unless otherwise specified, sampling plans and procedures set forth in MIL-STD-105, Inspection Level II, shall be used in determination of acceptability of the first echelon repair parts and all co
24、mponents assembled into the end product. An AQL of 1.0 shall be used for major items of i-nspection, an AQL of 2.5 shall be used for minor items of inspection. 4.7.1.3 and shall be performed whether the item is a part of a repair kit or is to be assembled into the end product. The verification of th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILP824361966PUMPFUEL 燃料 PDF
