ASTM E947-1983(2015) 7121 Standard Specification for Sampling Single-Phase Geothermal Liquid or Steam for Purposes of Chemical Analysis《化学分析用单相地热液体取样或蒸汽取样的标准规范》.pdf
《ASTM E947-1983(2015) 7121 Standard Specification for Sampling Single-Phase Geothermal Liquid or Steam for Purposes of Chemical Analysis《化学分析用单相地热液体取样或蒸汽取样的标准规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM E947-1983(2015) 7121 Standard Specification for Sampling Single-Phase Geothermal Liquid or Steam for Purposes of Chemical Analysis《化学分析用单相地热液体取样或蒸汽取样的标准规范》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E947 83 (Reapproved 2015)Standard Specification forSampling Single-Phase Geothermal Liquid or Steam forPurposes of Chemical Analysis1This standard is issued under the fixed designation E947; the number immediately following the designation indicates the year oforiginal adoption or, in t
2、he case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This specification covers the basic requirements forequipment to be used for the coll
3、ection of uncontaminated andrepresentative samples from single-phase geothermal liquid orsteam. Geopressured liquids are included. See Fig. 1.2. Referenced Documents2.1 ASTM Standards:2D1192 Guide for Equipment for Sampling Water and Steamin Closed Conduits (Withdrawn 2003)33. Application3.1 This sp
4、ecification covers only that equipment which iscommonly used for the sampling of single-phase geothermalliquid or steam. It does not cover specialized equipmentrequired for, and unique to, a specific test or method ofanalysis. The specification covers items such as valves, fittings,tubing, cooling c
5、oils and condensers, pumps, degassers, samplecontainers, sample probes, and packaging materials, but ex-cludes equipment used in specific testing and analysis.3.2 This procedure applies to single-phase steam or liquidstreams prior to separation and to separated single-phase steamor liquid streams.3.
6、3 For most geothermal and geopressured fluids tested bythe procedures outlined in this specification, both liquid andgas samples may be collected.4. Sample Probes4.1 Sample probes shall be used to extract liquid or steamfrom the main part of the geothermal flow rather than using awall-accessing valv
7、e and pipe arrangement.4.1.1 The probe permits the sampling of various positionswithin the flow to determine whether stratified or annulartwo-phase flow is present which would bias a single-pointsample.4.2 Sample probes shall be designed to extract representa-tive samples from flowing systems. Speci
8、al attention duringconstruction of the probe shall be given to the stresses that theprobe will later be subjected to during insertion into, andoperation in, a pressurized flowing system.4.3 The sampling probe (see Fig. 2) passes through thesliding seal and access valve in order that liquid or steam
9、canbe sampled from the mainstream of the flow line. Thereafter,the sample contacts only surfaces that the operator can verifyare noncontaminating and nonabsorbing.4.3.1 Moving the probe tip across the diameter of the pipemay allow the operator to determine the existence of stratifi-cation or multiph
10、ase sampling problems.4.3.2 Flow regulation is accomplished downstream of thecooling coils in order to avoid residual flashing into steam atthe point of pressure reduction. Flashing may cause scaledeposition which would preclude the accurate determination ofcertain constituents.5. Sampling Lines5.1
11、SafetySampling lines shall be as short as practical andof sufficient strength to prevent structural failure.5.2 ConstructionAll sample lines shall be constructed toeliminate traps in which condensate, entrained particulates, orscale precipitates might settle since they may be partiallyemptied with c
12、hanges in flow conditions and may result insample contamination. Allow for thermal expansion.6. Valves, Fittings, and Gages6.1 Valves which control access to the sampling point shallhave straight throats (frequently designated as ball, plug, andgate valves). This permits a probe to be inserted direc
13、tly intothe flow.6.2 It is recommended that at least one full-port shut-offvalve be placed on the downstream end of the sample probe sothat the sampling line may be isolated when desired.1This specification is under the jurisdiction of ASTM Committee E44 on Solar,Geothermal and Other Alternative Ene
14、rgy Sources and is the direct responsibility ofSubcommittee E44.15 on Geothermal Field Development, Utilization and Materials.Current edition approved March 1, 2015. Published April 2015. Originallyapproved in 1983. Lasts previous edition approved in 2007 as E947-83(2007). DOI:10.1520/E0947-83R15.2F
15、or referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3The last approved version of this historical standard is refer
16、enced onwww.astm.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States16.3 Throttling devices such as valves, capillary tubes, ororifices, if used, shall be placed at the sample outlet of thecooler or condenser. This practice will ensur
17、e cooling at thehighest pressure and will minimize the possibility of fluidflashing or scale forming in the cooling coil. A head columnsuch as that recommended for normal water and steam sam-pling (Specification D1192, for Equipment for Sampling Waterand Steam) shall not be used because it provides
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME947198320157121STANDARDSPECIFICATIONFORSAMPLINGSINGLEPHASEGEOTHERMALLIQUIDORSTEAMFORPURPOSESOFCHEMICALANALYSIS

链接地址:http://www.mydoc123.com/p-533825.html