1、Designation: D 3923 08Standard Practices forDetecting Leaks in Reverse Osmosis and NanofiltrationDevices1This standard is issued under the fixed designation D 3923; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last r
2、evision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 These practices cover detecting leaks in which there is adirect communication between the feed or concentrate, or both,and t
3、he permeate. Several types of leaks are possible with thevarious configurations of reverse-osmosis (RO) and nanofiltra-tion (NF) devices.1.2 Types of Leaks:1.2.1 With hollow-fiber devices, feed or concentrate leak-age, or both, into the permeate stream by leaks through the tubesheet and past the tub
4、e sheet O-ring are possible. “Leaks”caused by broken fibers are not covered by these practices.1.2.2 With spiral-wound devices, leaks may occur throughdamage of the membrane surface itself by punctures orscratches, by glue-line failure, and by O-ring leaks on producttube interconnectors.1.2.3 With t
5、ubular devices, leaks due to membrane damage,tube end seal leaks, and leaks from broken tubes or productheaders are possible.1.3 Three leak test practices are given as follows:SectionsPractice ATube Sheet and O-Ring Leak Test for HollowFiber Devices8 to 9Practice BVacuum Test for Spiral Wound Device
6、s 10 to 12Practice CDye Test for Spiral Wound and Tubular Devices 13 to 181.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine
7、 the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D 1129 Terminology Relating to WaterD 1193 Specification for Reagent WaterD 4194 Test Methods for Operating Characteristics of Re-verse Osmosis and Nanofiltration DevicesD 6161 Terminology Used for
8、Microfiltration, Ultrafiltra-tion, Nanofiltration and Reverse Osmosis Membrane Pro-cessesD 6908 Practice for Integrity Testing of Water FiltrationMembrane SystemsE60 Practice for Analysis of Metals, Ores, and RelatedMaterials by Molecular Absorption SpectrometryE 275 Practice for Describing and Meas
9、uring Performanceof Ultraviolet, Visible, and Near-Infrared Spectrophotom-eters3. Terminology3.1 For definitions of terms used in these practices, refer toTerminology D 1129 and D 6161.3.2 Definitions of Terms Specific to This Standard:3.2.1 leakbypassing of the intact membrane from thefeed side to
10、the permeate side.4. Summary of Practice4.1 The hollow-fiber device being tested is operated at lowpressure with the permeate tube sheet exposed (the fiber bundleis held in place by a “spider” device designed for the specificmodel under test). Any significant leak in the tube sheet orO-ring seal is
11、detected visually by inspection.5. Significance and Use5.1 These practices may be used to determine whether a ROor NF device is free of leaks if the mechanical integrity of thedevice is to be confirmed. They may also be used to detectleaks in RO or NF devices whose operating performanceindicates a p
12、ossible leak. These practices may be used foreither new or used devices.6. Apparatus6.1 “Spider” Device, designed for the specific model ofhollow-fiber device being tested, is available from the supplier.The “spider” is designed to take the place of the permeate endplate and permeate collection grid
13、/block while securing the1These practices are under the jurisdiction of ASTM Committee D19 on Waterand are the direct responsibility of Subcommittee D19.08 on Membranes and IonExchange Materials.Current edition approved Oct. 1, 2008. Published November 2008. Originallyapproved in 1980. Last previous
14、 edition approved in 2003 as D 3923 94 (2003)1.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright AST
15、M International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.fiber bundle from movement. This allows visual observationduring low-pressure operation with the fiber bundle retained inits original position.7. Purity of Reagents7.1 Reagent grade chemicals shall b
16、e used in all tests.Unless otherwise indicated, it is intended that all reagents shallconform to the specifications of the Committee on AnalyticalReagents of the American Chemical Society, where suchspecifications are available.3Other grades may be used,provided it is first ascertained that the reag
17、ent is of sufficientlyhigh purity to permit its use without lessening the accuracy ofthe determinations.7.2 Unless otherwise indicated, references to water shall beunderstood to mean Type III reagent water conforming toSpecification D 1193.PRACTICE ATUBE SHEET AND O-RING LEAKTEST FOR HOLLOW FIBER DE
18、VICES8. Scope8.1 This practice is applicable to detecting feed or concen-trate leakage, or both, through the tube sheet and past the tubesheet O-ring into the permeate in hollow-fiber devices.9. Procedure9.1 Drain the liquid from the feed side of the membrane.9.2 Connect a centrifugal pump with 1.4
19、MPa (200 psig)capability and a throttling valve to the feed port of thehollow-fiber device. Install a pressure gage and valve on theconcentrate port of the RO or NF device.9.3 Remove the permeate end plate and auxiliary equipmentin accordance with the suppliers instructions to expose theface of the
20、permeate tube sheet.9.4 Install a “spider” device (available from supplier) de-signed for the specific model under test and secure the “spider”with the snap or segmented ring that held the permeate endplate in place.9.5 Place the hollow-fiber device in the horizontal positionand orient the open conc
21、entrate line to the highest point (12oclock). Allow water to flow through the device at linepressure (approximately 350 kPa; 50 psig) to remove anytrapped air in the device. Slowly close concentrate line valve topressurize the unit to 350 kPa (50 psig). While standing clearof the tube sheet, start t
22、he pump and increase pressure slowlyuntil a maximum pressure of 1.05 MPa (150 psig) is obtained.Proceed with the tube sheet inspection.NOTE 1The leak test should take approximately 15 min to determinethe integrity of the tube sheet and tube sheet O-ring.9.6 Examine for leaks by observing the product
23、 water as itexits the tube sheet face. If leaks do not exist, the product waterappears to ooze out from the tube sheet face. However, if asignificant leak is present in the tube sheet or O-ring seal, aforceful spray or stream will be observed. During inspection,rotate the device 180 to examine the l
24、ower portion of the tubesheet for leaks. This is necessary since leaks in the lowerportion of the tube sheet are not easily discernible because ofthe accumulation of product water.9.7 Shutdown Procedure:9.7.1 Shut off the centrifugal pump and allow the pressure toreach zero before disconnecting the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD39232008STANDARDPRACTICESFORDETECTINGLEAKSINREVERSEOSMOSISANDNANOFILTRATIONDEVICES 反渗透 装置 检测 渗漏

链接地址:http://www.mydoc123.com/p-515814.html