Asian regional Workshop on capacity development for the .ppt
《Asian regional Workshop on capacity development for the .ppt》由会员分享,可在线阅读,更多相关《Asian regional Workshop on capacity development for the .ppt(11页珍藏版)》请在麦多课文档分享上搜索。
1、Asian regional Workshop on capacity development for the clean development mechansm ait, thailand october 19-21, 2005 Project Pipelines: Status and Bottlenecks,By Mr. OUK Navann, Cambodian Climate Change Office, Ministry of Environment,Presentation Outline,Projects developed by/with support from CD4C
2、DM Bottlenecks faced and addressed Role of DNA, NGOs and other institutions Other observations: Lessons learnt by CD4CDM institutions during the last 3 years Impact of CD4CDM project Conclusion,1- Projects developed by/with support from CD4CDM (1/2),Angkor Biocogen Project (PDD) Rice husk cogenerati
3、on project of 1.5 MW Avoid release 315,000 Ton CO2 equiv. over 7 years Marubeni Renewable Energy Development and Rubber Plantation (PIN) Mondolkiri highlands, NE Cambodia Small-size hybrid systems of wind and solar power generation with a total of 1.4MW Annual CO2 emission reductions: 2,759 Ton CO2/
4、yr Methane Recovery Project from Stung Meanchey Landfill (PIN) Methane capture and flaring or use for energy Reduce 858,000 Ton CO2 equiv. over 10 years National Biodigester Programme, Cambodia (PIN) Reduce CH4 capture and burning for energy cooking Reduce CO2 from the burning of non-renewable fuel
5、wood Possibly reduce N2O emission from existing chemical fertilizer use. Install 17, 500 family sized biogas plants which will reduce 512,000 Ton CO2 equiv. over 7 years GERES CFSP Improved Cookstove Dissemination of 18,000 improved cookstoves saving emissions from use less wood fuel Avoid release o
6、f 67,000 Ton CO2e over 10 years NEDO solar PV hybrid projects 109kw Solar PV-mini hydro project Kompong Cham 120kW Solar PV-biogas project Kompong Som Over 20 mini and micro hydro projects Country hydropower potential is high.,1- Projects developed by/with support from CD4CDM (2/2),Status Angkor Bio
7、cogen Project (PDD) Marubeni Renewable Energy Development and Rubber Plantation project (PIN) Methane Recovery Project from Stung Meanchey Landfill (PIN) National Biodigester Programme, Cambodia (PIN) Type of Assistances Training Technical assistance and advice Provision of guidance material Facilit
8、ation/promotion Assessment Networking,2. Bottlenecks faced and addressed,Sovereign risks = insurance New international legal framework = clarify rules Inadequate legal framework of host countries = establish legal framework Uncertainty beyond first commitment period = improve commitment to COP/MOP n
9、egotiations Price uncertainty, no disclosure of CERs prices = disclose CER market prices Illiquid and complex market = more projects approved in shorter timeframe, improve CDM registration and approval processes Difficulties for host countries to monitor and verify SD benefits = Conditional approval
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASIANREGIONALWORKSHOPONCAPACITYDEVELOPMENTFORTHEPPT

链接地址:http://www.mydoc123.com/p-378611.html