NAVY UFGS-12 22 00-2010 CURTAINS AND DRAPES [Superseded ARMY UFGS-12 20 00]《幕布和窗帘[代替 ARMY UFGS-12 20 00]》.pdf
《NAVY UFGS-12 22 00-2010 CURTAINS AND DRAPES [Superseded ARMY UFGS-12 20 00]《幕布和窗帘[代替 ARMY UFGS-12 20 00]》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-12 22 00-2010 CURTAINS AND DRAPES [Superseded ARMY UFGS-12 20 00]《幕布和窗帘[代替 ARMY UFGS-12 20 00]》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-12 22 00 (August 2010)-Preparing Activity: NAVFAC SupersedingUFGS-12 22 00 (July 2007) UFGS-12 22 00.00 20 (April 2006)UFGS-12 20 00 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSD
2、IVISION 12 - FURNISHINGSSECTION 12 22 00CURTAINS AND DRAPES08/10PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 Drawings1.4 SYSTEM REQUIREMENTS1.5 SUSTAINABLE DESIGN CERTIFICATION1.6 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 MATERIALS2.1.1 Fabrics2.1.1.1 Drapery Fabric2.1.1.2 Drapery Lining2.1
3、.1.3 Flame Resistance2.1.2 Sewing Thread2.1.3 Heading2.1.3.1 Heading Hooks2.1.3.2 Snap-Tape System (Ripplefold)2.1.4 Drapery Hardware2.1.4.1 Track Sets2.1.4.2 Rod Sets2.1.4.3 Traverse Cord2.1.4.4 Hand Traverse Cordless Track System2.1.4.5 Motor and Controller2.1.4.6 Snap-Tape System Track2.1.5 Faste
4、ners2.2 FABRICATION2.2.1 Drapery Fabrication2.2.1.1 Panels2.2.1.2 Headings2.2.1.3 Seams2.2.1.4 HemsSECTION 12 22 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.2 Lining Fabrication2.2.3 Tie-Backs2.2.4 ValancesPART 3 EXECUTION3.1 EXAMINA
5、TION3.2 INSTALLATION3.2.1 Hardware3.2.2 Draperies3.2.3 Valances3.3 DRAPERY SCHEDULE3.3.1 IDENTIFICATION- End of Section Table of Contents -SECTION 12 22 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-12
6、22 00 (August 2010)-Preparing Activity: NAVFAC SupersedingUFGS-12 22 00 (July 2007) UFGS-12 22 00.00 20 (April 2006)UFGS-12 20 00 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 12 22 00CURTAINS AND DRAPES08/10*NOTE: This guide specific
7、ation covers the requirements for draperies, drapery hardware, and installation.Note: Use Section 12 21 00 for WINDOW BLINDSNote: Use Section 12 24 13 for ROLLER WINDOW SHADESEdit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, c
8、hoose applicable item(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.This guide specification includes tailoring options for Motorized Drapery Rods. Selection or deselection of a tailoring option (selec
9、t view-tailoring options) will include or exclude that option in the section. Specific project editing is still required for the resulting section.Motorized drapery systems must be coordinated with electrical and HVAC systems (energy conservation measures), as well as the drapery manufacturer to ver
10、ify weight and related carrying hardware.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recom
11、mended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*SECTION 12 22 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*NOTE: On the drawings, show:1. Windows and other locations requiring drapery. Indicate whether dr
12、apery extends to ceiling or to specific height above windows.2. Location of each different drapery fabric when more than one type, pattern or color is to be provided.3. Width of window and width of drapery extension if bay window.4. Location of sample window installation, if appropriate.5. Indicate
13、draw direction when one-way draw traverse rods or tracks are to be provided.6. Indicate motor location and any integrated components or accessories.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are r
14、eferred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Al
15、so use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part
16、of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM D 3691/D 3691M (2009) Woven, Lace, and Knit Household Curtain and Drapery FabricsSECTION 12 22 00 Page 4Provided by IHSNot for ResaleNo reprodu
17、ction or networking permitted without license from IHS-,-,-GREENGUARD ENVIRONMENTAL INSTITUTE (GEI)GEI Greenguard Standards for Low Emitting ProductsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 701 (2010) Standard Methods of Fire Tests for Flame Propagation of Textiles and FilmsSCIENTIFIC CERTIFI
18、CATION SYSTEMS (SCS)SCS Scientific Certification Systems (SCS)Indoor Advantage1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to
19、the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Qu
20、ality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the app
21、roving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes foll
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS1222002010CURTAINSANDDRAPESSUPERSEDEDARMYUFGS122000 幕布 窗帘 代替 ARMYUFGS122000PDF

链接地址:http://www.mydoc123.com/p-984779.html