NAVY MIL-I-50755 A-1988 IGNITER ASSEMBLY《点火器装置》.pdf
《NAVY MIL-I-50755 A-1988 IGNITER ASSEMBLY《点火器装置》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-50755 A-1988 IGNITER ASSEMBLY《点火器装置》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-1-50755A 5 January 1988 SUPERSEDING 20 November 1972 MIL-1-50755 r Beneficial comments (recommendations, additions , deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Ordnance Station, Standardization Branch (3730),
2、 Indian Head, Maryland 20640-5000, by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. MILITARY SPECIFICATION IGNITER ASSEMBLY This specification is approved for use by all Departments and Agencies of Le Departm
3、ent of Defense. 1. SCOPE 1.1 Scope. This specification covers the Igniter Assembly, Part Number 11740321, for use in conjunction with the Rocket Motor, MI19 in an aircrew emergency escape system . 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following spe
4、cifications and standards form a part of this specification to the extent specified herein, Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the so
5、licitation. SPECIFICATIONS Military 0 MIL-R-50753 Rocket Motor, M119 Assembly STANDARDS Military MIL-STD-105 Sampling Procedures and Tables or Inspection by Attributes MIL-STD-45 3 Inspection, Radiographic DOD-STD-2101 Classification of Characteristics 2.1.2 Other Government documents, drawings and
6、specifications. The following drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DRAWINGS Naval Ordnance Station, Indian Head, Maryland (Code Ident 14083) 1 174032 1 Igniter Assem
7、bly f AMSC NO. N/A THIS DOCUMENT CONTAINS PAGES. FSC 1377 DISTRBUTiON STATEMENT A. Appwved for public release; distribution is unlimited. - _, - y- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_- MIL-I-50755A 13 06 0330b4 I MIL- 1-5 07 5 5A d (Cop
8、ies of specifications, standards and drawings required by contractors in connection with specific acquisitio functions should be obtained from the contracting activity or as directed by the contracting officer). 2.2 Order of Precedence. In the event of a conflict between the text of this specificati
9、on and the references cited herein, the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article sample. When specified in the contract or
10、 purchase order, a sample shall be subjected to first article inspection (see 4.4 and 6.2). 3.2 Materials. All materials, parts and assemblies shall be in accordance with the documents listed on Drawing 11740321. 3.3 Proieclive finish. Protective linish shall be in accordance with the applicable spe
11、cification referenced on the drawings and shall apply to all surfaces regardless of configuration. 3.4 Age 3.4.1 Explosive components. All explosive components including but not limited to ignition powders and igniters shall be manufactured or recertified within 12 months of the delivery date. 3.4.2
12、 Primers. Primers shall have been manufactured and certified within 24 months or recertified within 12 months of the original contract delivery date. 3.5 Leak. The sealed igniter acsenioly shall not exhibit a leak rate of greater than 1 X cubic centimeters (an3) of air per second at a pressure diffe
13、rential of i .O i- O. 1 atmosphere (see 4.5.4. i). 3.6 Radiographic. Each igniter assembly shall be radiographically inspected. Interal configuration and condition shall be as specified on drawing 11740321 (See 4.5.4.2) 3.7 Functional. The igniter assembly shall not fail to fire. 3.8 13allisics. The
14、 igniter assembly, loaded with acceptable explosive components, when fired in an M119 Rocket Motor shall ignite the rocket motor propellant within .O15 seconds maximum at temperatures from minus 65 degrees to plus 160 degrees Fahrenheit (F). 3.9 Workmanship. The requirements for workmanship are as s
15、pecified on the applicable drawings, referenced specifications and the following: 3.9.1 Metal defects. All components shall be free from cracks, splits, laminations, perforations, porosity or other metal defects. 3.9.2 Burr. No part shall have a burr which might interfere with the assembly or functi
16、on of the item or which might be injurious to personnel handling the item. 3.9.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, oil, rust, corrosion or other foreign matter. There shall be no excess sealant on surfaces adjacent to the sealed parts. 2 Provided by IHSNot for Re
17、saleNo reproduction or networking permitted without license from IHS-,-,-r- MIL-I-50755A 13 W 9979706 0330685 3 W MIL-1-5075 5A 4. QUALITY ASSURANCE PROVISIONS 4.1Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the perfor
18、mance of all inspection requirements as specified herein, Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Go
19、vernment reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5.
20、 The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requireincnts in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submi
21、tted to the Government for acceptance comply with all requirements of the contract. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.2 Classification of insp
22、ections, The inspection requirements specified herein are classified as follows: a. First article inspection (see 4.4). b. Quality conformance inspection (see 4.5). 4.3 Inspection conditions. Unless otherwise specified (see 6.2. i), all inspections shall be performed under the following conditions:
23、a. Temperature: Room ambient 65“ F to 95“ F b. Altitude: Normal ground c. Vibration: None - d. Humidity: Rooin ambient to 95 percent relative, maximum 4.4 First article iiispec6ion. First article inspection shall be performed after award of contract and prior to production O by a facility designated
24、 in the contract or order (see 6.2). First article inspection shall be performed on sample units which have been produced using the same materials, equipment, processes and procedures as will be used in regular production, 4.4.1 Sample size. The sample size shall be as specified in the contract (see
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI50755A1988IGNITERASSEMBLY 点火器 装置 PDF
