BS F 140-1991 Glossary of parachute terms《降落伞术语词汇》.pdf
《BS F 140-1991 Glossary of parachute terms《降落伞术语词汇》.pdf》由会员分享,可在线阅读,更多相关《BS F 140-1991 Glossary of parachute terms《降落伞术语词汇》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD AEROSPACE SERIES CONFIRMED SEPTEMBER1998 BSF140:1991 Glossary of Parachute termsBSF140:1991 This BritishStandard, having been prepared under the directionof the Aerospace Standards Policy Committee, waspublished under the authorityof the Standards Boardand comes into effect on 28Jun
2、e1991 BSI02-2000 The following BSI references relate to the work on this standard: Committee reference ACE/54 Draft for comment90/70474 DC ISBN 0 580 19123 0 Committees responsible for this BritishStandard The preparation of this BritishStandard was entrusted by the Aerospace Standards Policy Commit
3、tee (ACE/-) to Technical Committee ACE/54, upon which the following bodies were represented: British Fabric Association British Rubber Manufacturers Association British Textile Employers Association Man-made Fibres Producers Committee Ministry of Defence Society of British Aerospace Companies Limite
4、d Society of Dyers and Colourists Amendments issued since publication Amd. No. Date CommentsBSF140:1991 BSI 02-2000 i Contents Page Committees responsible Inside front cover Foreword ii Section 1. Parachute assembly 1 Section 2. Parachute systems 1 Section 3. Canopy types 3 Section 4. Parachute syst
5、em components 4 Section 5. Parachute construction 6 Section 6. Performance 8 Section 7. Miscellaneous 11 Index 14 Figure 1 Double W stitching (517) 12 Figure 2 Examples of stopper knots (712) 13BSF140:1991 ii BSI 02-2000 Foreword This BritishStandard has been prepared under the direction of the Aero
6、space Standards Policy Committee and is one of a series for aerospace purposes. Itreplaces and revises BS185:Section 12, as BS185:Sections 1 to 18 have been declared obsolescent/obsolete. This BritishStandard glossary defines a parachute assembly, and terms relating to parachute systems, types, comp
7、onents, construction and performance. It also gives commonly used acronyms. This glossary covers topics that are the responsibility of the Aerospace Standards Policy Committee relating to parachutes and incorporates revised definitions of many terms so as to reflect current usage and introduces new
8、terms including those relating to ram air parachutes. This glossary is intended as a basic reference document providing a comprehensive list of terms that will promote better understanding between various sections of the aerospace industry, and recreational agencies, facilitate trade and provide bet
9、ter tools for improved handling of information. Many of the definitions in this glossary are essentially the same as those used in different BritishStandards already published, and as these are revised and new standards are produced, the use of the definitions given in this glossary will be encourag
10、ed to promote wider acceptance and recognition of standard terminology. Definitions given in this glossary are intended for general use whereas definitions in other standards are intended to clarify the meaning of terms in that particular standard. Legal definitions in a particular statute are for t
11、he purposes of that statute and may be different from the definitions in this glossary. Terms are listed alphabetically in the index and are referred to by numbers which are found against the term in the body of the standard. Alternative terms are given in medium type below the preferred terms with
12、their status indicated, i.e.non-preferred. These terms are not individually numbered, but are included in the index with a reference to the preferred term. Terms of more than one word, e.g.“emergency parachute”, are written in a direct style, not as “parachute, emergency”. The inverted term is inclu
13、ded in the index with a reference to the direct term. Italicized words in definitions indicate terms that are defined elsewhere in this standard. A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct ap
14、plication. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front cover, an inside front cover, pagesi andii, pages1 to16 and a back cover. This standard has been updated (see copyright date) and may have had ame
15、ndments incorporated. This will be indicated in the amendment table on the inside front cover.BSF140:1991 BSI 02-2000 1 No. Term Definition Section 1. Parachute assembly 101 parachute Aerodynamic device manufactured from textile materials to produce drag and possibly lift. 102 pack Outer container i
16、nto which the parachute components are stowed preparatory to use. 103 canopy Fabric portion of a parachute which provides drag, or drag and lift, when inflated. 104 rigging line Any cord or tape attached to the canopy which transmits the forces on the parachute canopy to the suspended load directly
17、or via lift webs or strops. Section 2. Parachute systems 201 aeroplane parachute Parachute intended to recover the complete aircraft and passengers in an emergency. Usually applicable only to very lightweight aircraft. 202 airborne forces parachute Personnel parachute to deliver a soldier and his eq
18、uipment to the ground from an aircraft in flight. 203 anti-spin parachute Parachute attached to an aircraft to assist in its recovery from a spin. 204 anti-swing parachute Parachute which reduces the amplitude of oscillation of a load supported by other parachutes. 205 automatic parachute Parachute
19、which is caused to deploy at a predetermined altitude, time, or rate of descent, by an automatic sensing device. 206 auxiliary parachute Subsidiary parachute attached to the main canopy or its pack to assist during the deployment sequence; usually one of three types: spring auxiliary parachute, hand
20、 deployed parachute or vane parachute. NOTEIn America the term used is pilot chute. 207 back type parachute Parachute mounted in its pack worn on the back of the harness. 208 chest mounted parachute Parachute carried in its pack mounted on the front of the harness, usually a reserve. 209 cluster Ass
21、embly of two or more parachutes attached to a single load, designed to deploy simultaneously. 210 controller parachute Parachute used to modify the opening characteristics of the main canopy, it may be external or internal to the main canopy. 211 decelerator parachute Parachute used to reduce the sp
22、eed prior to deployment of the main parachute. 212 delayed opening parachute Parachute which is deployed at some time after the initiation of the opening sequence. 213 drogue parachute Relatively small parachute or drag producer used as a controller parachute, a decelerator parachute, an extractor p
23、arachute or a stabilizer parachute. 214 emergency escape parachute emergency parachute non-preferred Personnel parachute used by an occupant of an aircraft for an emergency descent. 215 extractor parachute Parachute used for withdrawing a load from an aircraft in flight.BSF140:1991 2 BSI 02-2000 No.
24、 Term Definition 216 HAHO (high altitude high opening) system Parachute system designed for high altitude exit from an aircraft with subsequent high altitude opening of the parachute. 217 HALO (high altitude low opening) system Parachute system designed for high altitude exit from an aircraft with s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSF1401991GLOSSARYOFPARACHUTETERMS 降落伞 术语 词汇 PDF

链接地址:http://www.mydoc123.com/p-582796.html