《ASTM F2479-2012(2017) Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing《现浇游乐场铺面的规范 采购 安装和维护用标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2479-2012(2017) Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing《现浇游乐场铺面的规范 采购 安装和维护用标准指南》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2479 12 (Reapproved 2017) An American National StandardStandard Guide forSpecification, Purchase, Installation and Maintenance ofPoured-In-Place Playground Surfacing1This standard is issued under the fixed designation F2479; the number immediately following the designation indicates th
2、e year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers information with regard to the d
3、esign,manufacture, installation, and maintenance of poured-in-placeplayground surfaces.NOTE 1This document is a guide and not intended to be used as aspecification; it should be used for educational purposes.1.2 This guide outlines the issues of compliance withexisting standards, durability, and fun
4、ctional longevity.1.3 This guide reviews issues such as edge treatment,abutting surfaces, and combinations with other surfaces de-signed for circulation or protective surfaces.1.4 This guide presents maintenance considerations andgeneral procedures that should be followed by the owner/operator.1.5 T
5、his guide outlines aging considerations such as loss ofimpact absorption, cracking, shrinkage, heaving, and how toprevent, accommodate, or rectify those issues.1.6 This guide presents warranty considerations.1.7 This guide does not imply that an injury cannot beincurred when the surface system is co
6、mpliant with thestandards referred to in this guide.1.8 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.9 This standard does not purpor
7、t to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.1.10 This international standard was developed i
8、n accor-dance with internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2
9、.1 ASTM Standards:2F1292 Specification for Impact Attenuation of SurfacingMaterials Within the Use Zone of Playground EquipmentF1951 Specification for Determination of Accessibility ofSurface Systems Under and Around Playground Equip-ment2.2 CSA Standard:3CSA Z614 Childrens Playspaces and Equipment3
10、. Terminology3.1 Definitions:3.1.1 aliphatic prepolymerprepolymer which does notcontain any 1,3,5-cyclohexatrien group.3.1.1.1 DiscussionGenerally highly color stable when ex-posed to UV radiation, no yellowing.3.1.2 ambient grindingprocess that takes raw rubber prod-ucts and processes it to rubber
11、crumb, chips, buffings, and soforth that is at the temperature generated by the grindingequipment or in the location of production.3.1.3 aromatic prepolymerhydrocarbons that are madefrom only hydrogen and carbon and contain a prepolymerwhich contains one or more 1,3,5-cyclohexatriene group.3.1.3.1 D
12、iscussionAromatic prepolymer are generallysusceptible to change when exposed to UV and moisture.These changes can be seen as a yellowish shading or “amber-ing” of the top surface, especially when encapsulating rubbercrumb that is grey, light blue, blue, eggshell, teal, and so forth.3.1.4 asphalt, ad
13、jacentbituminous bound material that isused as a curb or walkway and comes into contact with thepoured-in-place surface.1This guide is under the jurisdiction of ASTM Committee F08 on SportsEquipment, Playing Surfaces, and Facilities and is the direct responsibility ofSubcommittee F08.63 on Playgroun
14、d Surfacing Systems.Current edition approved April 1, 2017. Published April 2017. Originallyapproved in 2007. Last previous edition approved in 2012 as F2479 12. DOI:10.1520/F2479-12R17.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceas
15、tm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from Canadian Standards Association (CSA), 5060 Spectrum Way,Mississauga, ON L4W 5N6, Canada, http:/www.csa.ca.Copyright ASTM International, 100 Barr Harbor Drive,
16、PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued
17、 by the World Trade Organization Technical Barriers to Trade (TBT) Committee.13.1.4.1 DiscussionThe materials and compaction shallconform to local engineering practices and have a mechanicalcompaction of no less than 98 % standard proctor density. Theedge of the asphalt at the junction with the pour
18、ed-in-placesurface shall be vertical to 30 from horizontal. Considerationshould be given to the use of an appropriate primer asrecommended by the manufacturer to ensure adhesion of thepoured-in-place surface to the asphalt.3.1.5 asphalt, basehard, bituminous bound surface that isunder the poured-in-
19、place surface.3.1.5.1 DiscussionNew asphalt should cure at least 14days, have no residual surface oils, and be pressure washed orhave at least two thorough rainfalls prior to receiving poured-in-place surface. When the surface is flooded with as much as0.2 in. (5.1 mm) of water, there should be no e
20、vidence(rainbow effect) of oils on the surface of the water. A properlyprepared asphalt base will be able to effectively remove anywater which penetrates the poured-in-place surface. This maybe accomplished by sloping the asphalt, installing drainage, orusing porous asphalt.3.1.6 concrete, baseconcr
21、ete surface that is under thepoured-in-place surface.3.1.6.1 DiscussionThe concrete base should be 4 in. (100mm) minimum thickness. All new concrete slabs should curefor a minimum of seven days prior to receiving poured-in-placesurface. Concrete base should have a medium broom finish. Aproperly prep
22、ared concrete base will be able to effectivelyremove any water which penetrates the poured-in-place sur-face. This may be accomplished by sloping the concrete,installing drainage, or using a porous concrete.3.1.7 concrete, adjacentconcrete material that is used as acurb or walkway and comes into con
23、tact with the poured-in-place surface3.1.7.1 DiscussionThe materials and compaction shallconform to local engineering practices and have a moisturecontent less than 5 % at the time the poured-in-place surface isinstalled. The edge of the concrete at the junction with thepoured-in-place surface shall
24、 be vertical. Consideration shouldbe given to the use of an appropriate primer as recommendedby the manufacturer to ensure adhesion of the poured-in-placesurface to the concrete. Other strategies to avoid sinking of thefinal poured-in-place surface would be to provide a “key” or“step” in the vertica
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF247920122017STANDARDGUIDEFORSPECIFICATIONPURCHASEINSTALLATIONANDMAINTENANCEOFPOUREDINPLACEPLAYGROUNDSURFACING

链接地址:http://www.mydoc123.com/p-538816.html