ASTM D6433-2009 6875 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf
《ASTM D6433-2009 6875 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM D6433-2009 6875 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf(49页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D6433 09Standard Practice forRoads and Parking Lots Pavement Condition IndexSurveys1This standard is issued under the fixed designation D6433; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision.
2、A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the determination of roads andparking lots pavement condition through visual surveys usingthe Pavement Condition
3、 Index (PCI) method of quantifyingpavement condition.1.2 The PCI for roads and parking lots was developed by theU.S. Army Corps of Engineers (1, 2).2It is further verified andadopted by DOD and APWA.1.3 The values stated in inch-pound units are to be regardedas standard. The values given in parenthe
4、ses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate s
5、afety and health practices and determine the applica-bility of regulatory limitations prior to use. Specific precau-tionary statements are given in Section 6.2. Terminology2.1 Definitions of Terms Specific to This Standard:2.1.1 additional samplea sample unit inspected in addi-tion to the random sam
6、ple units to include nonrepresentativesample units in the determination of the pavement condition.This includes very poor or excellent samples that are nottypical of the section and sample units, which contain anunusual distress such as a utility cut. If a sample unitcontaining an unusual distress i
7、s chosen at random it should becounted as an additional sample unit and another randomsample unit should be chosen. If every sample unit is surveyed,then there are no additional sample units.2.1.2 asphalt concrete (AC) surfaceaggregate mixturewith an asphalt cement binder. This term also refers to s
8、urfacesconstructed of coal tars and natural tars for purposes of thispractice.2.1.3 pavement brancha branch is an identifiable part ofthe pavement network that is a single entity and has a distinctfunction. For example, each roadway or parking area is aseparate branch.2.1.4 pavement condition index
9、(PCI)a numerical ratingof the pavement condition that ranges from 0 to 100 with 0being the worst possible condition and 100 being the bestpossible condition.2.1.5 pavement condition ratinga verbal description ofpavement condition as a function of the PCI value that variesfrom “failed” to “excellent”
10、 as shown in Fig. 1.2.1.6 pavement distressexternal indicators of pavementdeterioration caused by loading, environmental factors, con-struction deficiencies, or a combination thereof. Typical dis-tresses are cracks, rutting, and weathering of the pavementsurface. Distress types and severity levels d
11、etailed inAppendixX1 forAC, andAppendix X2 for PCC pavements must be usedto obtain an accurate PCI value.2.1.7 pavement sample unita subdivision of a pavementsection that has a standard size range: 20 contiguous slabs (68slabs if the total number of slabs in the section is not evenlydivided by 20 or
12、 to accommodate specific field condition) forPCC pavement, and 2500 contiguous square feet, 6 1000 ft2(225 6 90 m2), if the pavement is not evenly divided by 2500or to accommodate specific field condition, for AC pavement.2.1.8 pavement sectiona contiguous pavement area hav-ing uniform construction,
13、 maintenance, usage history, andcondition. A section should have the same traffic volume andload intensity.2.1.9 portland cement concrete (PCC) pavementaggregate mixture with portland cement binder includingnonreinforced and reinforced jointed pavement.2.1.10 random samplea sample unit of the paveme
14、ntsection selected for inspection by random sampling techniques,such as a random number table or systematic random proce-dure.1This practice is under the jurisdiction of ASTM Committee E17 on Vehicle -Pavement Systems and is the direct responsibility of Subcommittee E17.42 onPavement Testing and Eva
15、luation.Current edition approved Nov. 1, 2009. Published December 2009. Originallyapproved in 1999. Last previous edition approved in 2007 as D6433 07. DOI:10.1520/D6433-09.2The boldface numbers in parentheses refer to the list of references at the end ofthis standard.1Copyright ASTM International,
16、100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.3. Summary of Practice3.1 The pavement is divided into branches that are dividedinto sections. Each section is divided into sample units. Thetype and severity of pavement distress is assessed by visualinspection of t
17、he pavement sample units. The quantity of thedistress is measured as described in Appendix X1 and Appen-dix X2. The distress data are used to calculate the PCI for eachsample unit. The PCI of the pavement section is determinedbased on the PCI of the inspected sample units within thesection.4. Signif
18、icance and Use4.1 The PCI is a numerical indicator that rates the surfacecondition of the pavement. The PCI provides a measure of thepresent condition of the pavement based on the distressobserved on the surface of the pavement, which also indicatesthe structural integrity and surface operational co
19、ndition (lo-calized roughness and safety). The PCI cannot measure struc-tural capacity nor does it provide direct measurement of skidresistance or roughness. It provides an objective and rationalbasis for determining maintenance and repair needs andpriorities. Continuous monitoring of the PCI is use
20、d to estab-lish the rate of pavement deterioration, which permits earlyidentification of major rehabilitation needs. The PCI providesfeedback on pavement performance for validation or improve-ment of current pavement design and maintenance procedures.5. Apparatus5.1 Data Sheets, or other field recor
21、ding instruments thatrecord at a minimum the following information: date, location,branch, section, sample unit size, slab number and size, distresstypes, severity levels, quantities, and names of surveyors.Example data sheets for AC and PCC pavements are shown inFigs. 2 and 3.5.2 Hand Odometer Whee
22、l, that reads to the nearest 0.1 ft(30 mm).5.3 Straightedge or String Line, (AC only), 10 ft (3 m).5.4 Scale, 12 in. (300 mm) that reads to18 in. (3 mm) orbetter. Additional 12-in. (300 mm) ruler or straightedge isneeded to measure faulting in PCC pavements.5.5 Layout Plan, for network to be inspect
23、ed.6. Hazards6.1 Traffic is a hazard as inspectors may walk on thepavement to perform the condition survey.7. Sampling and Sample Units7.1 Identify branches of the pavement with different usessuch as roadways and parking on the network layout plan.7.2 Divide each branch into sections based on the pa
24、ve-ments design, construction history, traffic, and condition.7.3 Divide the pavement sections into sample units. If thepavement slabs in PCC have joint spacing greater than 25 ft (8m) subdivide each slab into imaginary slabs. The imaginaryslabs all should be less than or equal to 25 ft (8 m) in len
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD643320096875STANDARDPRACTICEFORROADSANDPARKINGLOTSPAVEMENTCONDITIONINDEXSURVEYS 道路 停车场 路面 条件 系数

链接地址:http://www.mydoc123.com/p-522500.html