《ASTM C1781 C1781M-2014 Standard Test Method for Surface Infiltration Rate of Permeable Unit Pavement Systems《可渗透单元路面系统表面渗透速率的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1781 C1781M-2014 Standard Test Method for Surface Infiltration Rate of Permeable Unit Pavement Systems《可渗透单元路面系统表面渗透速率的标准试验方法》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1781/C1781M 13C1781/C1781M 14Standard Test Method forSurface Infiltration Rate of Permeable Unit PavementSystems1This standard is issued under the fixed designation C1781/C1781M; the number immediately following the designation indicates theyear of original adoption or, in the case of
2、revision, the year of last revision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope Scope*1.1 This test method covers the determination of the field surface infiltration rate of in pl
3、ace permeable unit pavement systemssurfaced with solid interlocking concrete paving units, concrete grid paving units, or clay paving brick.1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in eachsystem may not be exact equival
4、ents; therefore, each system shall be used independently of the other. Combining values from thetwo systems may result in non-conformance with the standard.1.3 The text of this test method references notes that provide explanatory material. These notes shall not be considered asrequirements of the t
5、est method.1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatorylimitations prior to use.2. Ref
6、erenced Documents2.1 ASTM Standards:2C902 Specification for Pedestrian and Light Traffic Paving BrickC920 Specification for Elastomeric Joint SealantsC936 Specification for Solid Concrete Interlocking Paving UnitsC1232 Terminology of MasonryC1272 Specification for Heavy Vehicular Paving BrickC1319 S
7、pecification for Concrete Grid Paving UnitsC1701 Test Method for Infiltration Rate of In Place Pervious Concrete2.2 Other Standards:3Federal Specification A-A-3110 (TT-P-1536A) Plumbing Fixture Setting Compound3. Terminology3.1 DefinitionsThe terms used in this test method are defined in Terminology
8、 C1232.4. Summary of Test Method4.1 An infiltration ring is temporarily sealed to the surface of a permeable unit pavement system. These pavements typicallyconsist of solid concrete paving units conforming to Specification C936, concrete grid paving units conforming to SpecificationC1319, or clay pa
9、ving brick conforming to Specification C902 or C1272. These pavements allow drainage through joints betweenthe units or through voids formed by the intersection of two or more units or intentionally manufactured into the units. The resultsof this test method for unit pavement systems can be compared
10、 to that using Test Method C1701 for pervious concrete. Afterpre-wetting the test location, a given mass of water is introduced into the ring and the time for the water to infiltrate the pavementis recorded. The infiltration rate is calculated in accordance with 9.1.1 This test method is under the j
11、urisdiction ofASTM Committee C15 on Manufactured Masonry Units and is the direct responsibility of Subcommittee C15.04 on Research.Current edition approved Sept. 1, 2013July 1, 2014. Published September 2013August 2014. Originally approved in 2013. Last previous edition approved in 2013 asC1781/C178
12、1M 13. DOI: 10.1520/C1781_C1781M13.10.1520/C1781_C1781M14.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.3 A
13、vailable from Standardization Documents Order Desk, DODSSP, Bldg. 4, Section D, 700 Robbins Ave., Philadelphia, PA 19111-5098, http:/dodssp.daps.dla.mil.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to
14、the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.*A Summar
15、y of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15. Significance and Use5.1 This test method can be used for acceptance of surface infiltration of new permeable unit pavement syst
16、ems.5.2 Tests performed at the same location across a span of years may be used to detect a reduction of infiltration rate of thepermeable surface, thereby identifying the need for any remedial maintenance intended to increase the infiltration rates topredefined levels.5.3 The infiltration rate obta
17、ined by this method is valid only for the localized area of the pavement where the test is conducted.To determine the surface infiltration rate of the entire permeable pavement, multiple locations must be tested and the resultsaveraged.5.4 The minimum acceptable infiltration rate is typically establ
18、ished by the design engineer of record or the municipality andcan be a function of the design precipitation event.6. Apparatus6.1 Infiltration RingA cylindrical ring, open at both ends (See Fig. 1). The ring shall be watertight, sufficiently rigid to retainits form when filled with water, and shall
19、have a diameter of 300 6 10 mm 12.0 6 0.5 in. with a minimum height of 50 mm2.0 in. The bottom edge of the ring shall be even. The inner surface of the ring shall be marked or scored with two lines at adistance of 10 and 15 mm 0.40 and 0.60 in. from the bottom of the ring. Measure and record the inn
20、er diameter of the ring tothe nearest 1 mm 0.05 in.NOTE 1Ring materials that have been found to be suitable include steel, aluminum, rigid plastic, and PVC.6.2 BalanceA balance or scale accurate to 10 g 0.02 lb.6.3 ContainerAcylindrical container typically made of plastic having a volume of at least
21、 20 L 5 gal, and from which watermay be easily poured at a controlled rate into the infiltration ring.6.4 Stop WatchAccurate to 0.1 s.6.5 Plumbers Putty (Non-Hardening)Meeting Specification C920 or Federal Specification A-A-3110.6.6 WaterPotable water.7. Test Locations7.1 Perform tests at multiple l
22、ocations at a site as requested by the purchaser of testing services. Unless otherwise specified, usethe following to determine the number of tests to perform:7.1.1 Three test locations for areas up to 2500 m2 25 000 ft2.7.1.2 Add one test location for each additional 1000 m2 10 000 ft2 or fraction
23、thereof.7.2 Provide at least 1 m 3 ft clear distance between test locations, unless at least 24 h have elapsed between tests.7.3 Do not test if there is standing water on top of the permeable pavement. Do not test within 24 h of the last precipitation.8. Procedure8.1 Infiltration Ring InstallationCl
24、ean the pavement surface by only sweeping off trash, debris, and other non-seated material.8.2 Take a photograph of the immediate area to be tested to document the pavement pattern and layout. Move the ring over thesurface of the pavement until the pattern, drainage joints and drainage voids framed
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1781C1781M2014STANDARDTESTMETHODFORSURFACEINFILTRATIONRATEOFPERMEABLEUNITPAVEMENTSYSTEMS 渗透 单元 路面

链接地址:http://www.mydoc123.com/p-465813.html