1、BC31 Introduction To VMware Site Recovery Manager,Jay Judkowitz Product Line Manager, Disaster Recovery And Data Protection VMware,Housekeeping,Please turn off your mobile phones, blackberries and laptops Your feedback is valued: please fill in the session evaluation form (specific to that session)
2、& hand it to the room monitor / the materials pickup area at registration Each delegate to return their completed event evaluation form to the materials pickup area will be eligible for a free evaluation copy of VMwares ESX 3i Please leave the room between sessions, even if your next session is in t
3、he same room as you will need to be rescanned,Agenda,VMware 2008 Context For Site Recovery Manager VMware And DR Background VMware Site Recovery Manager,4,VMware Leads the Way into the Automated Datacenter,Explore 1st generation 1998 2002,Expand 2nd generation 2003 - 2005,Standardize 3rd generation
4、2006- 2008,Automation = Business Agility,CapEx Savings,OpEx Savings,Production Consolidation Business Continuity Workload Balancing,Automate IT processes Create resource pools Capacity on-demand,Partitioning Small Scale Consolidation,Hypervisor,Virtual Infrastructure,Management & Automation,Hypervis
5、or,Virtual Infrastructure,Hypervisor,Strategic Business Value,Resource Mgt,Availability,Mobility,Desktop Management,IT Service Delivery,Business Continuity,Security,The Virtual Infrastructure Stack,Datacenter Automation,VMware Solutions for IT Service Delivery,IT Service Delivery,Business Continuity
6、,Datacenter Automation,Datacenter Automation Products,IT Service Delivery,Business Continuity,Datacenter Automation,Agenda,VMware 2008 Context For Site Recovery Manager VMware And DR Background VMware Site Recovery Manager,DR : The Killer App For VI3!,2006 Customer Survey (n=2265)85% use VMware in p
7、roduction; 43% set as a default policy for production servers,Press “Best Disaster Recovery Product of 2006” (TechTarget),DR Pain Points,Lack of a reliable disaster recovery plan 27-30% of business have no disaster recovery plan (VMworld, Imation)Inability to meet RTO and RPO needs with current plan
8、 Business needs and/or regulatory needs Need to improve RTO from days to minutes or hours Need to improve RPO from 24 hours to 1 hour or lessExpense related to hardware at remote site Idle hardware at recovery site (capital cost) Need to maintain system and application images at secondary site (oper
9、ational cost) Unable to instantly repurpose machines at the secondary site (RTO impact),Key Features of Virtualization for DR,Hardware-Independence Reliably recover a virtual machine to any hardware Enable waterfalling of equipment to recovery site,Tangible Results Of VMware For DR,Increase ability
10、to recover within recovery requirements Eliminate failures due to hardware dependencies Eliminate manual steps prone to operator error,P-P,V-V,40+ hrs, 4+ hrs,Increase testing success rate Simplified recovery process enables easier testing Non-disruptive testing enables more frequent testing,VMware
11、Infrastructure Transforms DR,Large Printer: With VI, I was able to do a DR test of over 40 applications in four hours. With physical machines, this would be impossible in any timeframe.Large Pharmaceutical: With physical machines and bare metal recovery, I have a 80% success rate and it takes days o
12、f work after restore. With VI, I have 100% restore success as soon as restores complete.,Customer Example: Hosted DR,Production Datacenter,DB,HR,App,App,DR Hosting Provider Site,DB,HR,App,App,Backup data,60 servers (blade and rack servers) Windows 2000, 2003, and NT Database, HR, business applicatio
13、ns, infrastructure applications,Hardware allocated at time of disaster Unknown hardware makes and models Recovery time 24 hours Failing back to primary site takes months,Customer Example: Hosted DR,Production Datacenter,DB,HR,App,App,DR Hosting Provider Site,DB,HR,App,App,14 blade servers 85% of sys
14、tems running in virtual machines OS, application, and data stored on SAN,Recovery to any hardware they receive from hosting provider Recovery time within objectives (24 hours) Failback to primary site takes days, not months,Image and data backups,HP Servers,Dell Servers,Production Environment:400+ V
15、Ms on 68 Physical ESX Servers,Back-Up/DR Environment:400+ VMs on 50 Physical ESX Servers,Primary Data Center,Disaster Recovery Site,Customer Example: In-House DR With Replication,Reduced recovery time from 20 hours to 2 hours,Bank In Mississippi During Hurricane Katrina,“Without VMware Infrastructur
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BC31INTRODUCTIONTOVMWARESITERECOVERYMANAGERPPT

链接地址:http://www.mydoc123.com/p-378874.html