SANS 10120-5 D-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section D Ear.pdf
《SANS 10120-5 D-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section D Ear.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 D-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section D Ear.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 5 Section D-1982 Earthworks PART 5 : CONTRACT ADMINISTRATION SECTION D CONTENTS Clause 1 . 1 .l 2 . 2.1 2.2 3 . 3.1 3.1 . 1 3.1.2 3.1.3
4、3.1.4 3.1.5 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.2.9 4 . Page Number START OF CONSTRUCTION 1 General 1 . IMMEDIATELY AFTER THE HANDING OVER OF THE SITE 1 General . 1 Existing Services 1 DURING CONSTRUCTION 1 Methods of Construction . 1 Clearing and stripping of site and conservation
5、 of topsoil . 1 Classification . 1 Safeguarding . 1 Explosives 1 Dealing with material that has become slushy or has acquired a low shear vane reading . 2 Administration . 2 Backfilling . 2 Safeguarding . 2 Explosives 2 Advice on blasting . 2 Dealing with water . 4 Disposal of surplus material . 4 D
6、etermination of field densities . 4 Computation of quantities 4 Temporary stockpiling 5 QUALITY CONTROL AND OTHER CONSIDERATIONS . 5 First Revision March 1982 This section of the code supersedes SABS 0120 : Part 5 : Section 0-1979 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS ISBN
7、 0-626-06169-5 SABS 0120 : Part 5 Sect ion D-1982 Earthworks SECTION 1200 D : EARTHWORKS NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 D. 1. START OF CONSTRUCTION 1 .l GENERAL.
8、For the purposes of this part of the code contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. IMMEDIATELY AFTER THE HANDING OVER OF THE SITE GENERAL. The engineer should give immediate attention to the matters set out in 2.2 b
9、elow to ensure that the start of the contractors program is not adversely affected by lack of information. EXISTING SERVICES (Subclause 5.1.2). The engineer should order, and the contractor should carry out, further investigations to detect and expose service lines in those areas where the design en
10、gineer has not been able to provide specific infor- mation. (See also Subclause 2.6 of Section A.) DURING CONSTRUCTION METHODS OF CONSTRUCTION Clearing and Stripping of Site and Conservation of Topsoil. See Subclause 1.3.9.2 of Section D of Part 3 of the code. Classification (Subclause 3.1.1) Change
11、s in classification. The contractor should immediately inform the engineer as and when the nature of the material being excavated changes to the extent that a new classification for further excavation is warranted. Failure on the part of the contractor to advise the engineer timeously should not pre
12、vent the engineer from classifying, in accordance with the correct classification procedure and to the best of his ability, the various materials occurring in the excavation. Classes of excavation (Subclause 3.1.2) a) Soft excavation. Material capable of sustaining plant life and removed to a depth
13、of 150 mm or as otherwise ordered, for use as topsoil, is classified as soft excavation. b) Hard rock excavation. Unweathered or undecomposed rock in thick ledges, bedded deposits, or conglomerate deposits so firmly cemented together as to present all the characteristics of solid rock that cannot be
14、 efficiently loosened, dislodged, or excavated without the use of explosives is generally classified as hard rock excavation. Boulder excavation Class A (Subclause 3.1.2(d). The inclusion in the definition of boulder excavation Class A of the phrase “40 % by volume of boulders“ is an impor- tant cri
15、terion which has the effect of changing the classification of a particular material from “boulder Class A“ to “hard rock“ as the plan dimensions of the exca- vation change from those of a large open area such as a road cutting or a foun- dation for a major structure to those of a confined area or tr
16、ench-like shape such as the individual footings for a structure or a pipe trench. Safeguardin (Subclause 5.1.1.2) The enginee? may order additional lateral support if he considers this to be necessary. As the senior professional engineer on site he may be found negligent in the event of an accident
17、resulting from his failure to order such support BUT he should not exercise this right in an unreasonable manner, and he should not cause the contractor extra costs unnecessarily. The contractor should avoid the dangers of loading the surface adjacent to an exca- vation with excavated material or ma
18、chinery, particularly where bedding planes or seepage may affect the stability of the excavation. (See Drawing DB-5.1 in Section DB for an example of the safe placement of excavated material and pipes.) Explosives (Subclause 5.1.1.3) Stray currents may arise in the vicinity of electrified railway li
19、nes, cathode pro- tected pipelines, transformers, overhead power lines, and other similar situations. Special detonators are available and should be used for blasting in such high risk areas to avoid accidents. Attention is drawn to the monitoring services available from manufacturers of explosives
20、whereby the effects of blasting in the vicinity of vulnerable points may be assessed. (See also Subclause 3.2.3 of Section D of Part 2 of the code.) SABS 0120 : Part 5 Section D-1982 Earthworks Dealing with Material that has Become Slushy or has Acquired a Low Shear Vane Readin . Where a foundation
21、has been over-excavated and low areas have been back- illed with sand and subsequently well compacted from the surface and the sand is + relatively thin, the engineer should carry out tests to determine whether the sand density is satisfactory. Where the backfilled sand layer is relatively thick and
22、 a substantial delay has occurred between the placing and the compacting of the sand, the upper 200 mm to 250 mm of sand may be of adequate density but the lower zone will not have attained an adequate density because of its high moisture content. As the sand is not free draining, it will not be pos
23、sible to compact the lower zone adequately. The sand should therefore be excavated together with any softened underlying clay, replaced with sand of suitable moisture content, and immediately compacted in layers to about 100 % of modified AASHTD maximum density. (See also 3.2.1 below.) ADMINISTRATIO
24、N Backfillin (Subclauses 3.3.2 and 8.3.3). The cost of the temporary stockpiling of material ezcavated from foundations and its subsequent removal and placing as back- fill behind the completed structure is regarded as part of the cost of excavation. The contractor will be paid for “double handling“
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205D1982CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONDEARPDF

链接地址:http://www.mydoc123.com/p-1028592.html