REG NASA-LLIS-0278--1993 Lessons Learned Inadequate Time Allocated for Planning for DSN Support.pdf
《REG NASA-LLIS-0278--1993 Lessons Learned Inadequate Time Allocated for Planning for DSN Support.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0278--1993 Lessons Learned Inadequate Time Allocated for Planning for DSN Support.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0278Lesson Info:a71 Lesson Number: 0278a71 Lesson Date: 1993-07-12a71 Submitting Organization: JPLa71 Submitted by: B. LarmanSubject: Inadequate Time Allocated for Planning for DSN Support Abstract: Planning for the two-spacecraft Voyager mission did not consider the extra tim
2、e needed to arrange for the allocation of Deep Space Network (DSN) coverage for the operation of both spacecraft. Lead times for project and institutional planning must be considered at the time the project mission operations plan is being developed.Description of Driving Event: Flight sequence time
3、lines for the two concurrently operating Voyager spacecraft were inadequate because of omissions due to failure to consider in a timely manner trajectory data and DSN coverage plans for both spacecraft. Significant lead time is required for planning the allocation of Deep Space Network (DSN) facilit
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS02781993LESSONSLEARNEDINADEQUATETIMEALLOCATEDFORPLANNINGFORDSNSUPPORTPDF

链接地址:http://www.mydoc123.com/p-1017926.html