DIN 18218-2010 Pressure of fresh concrete on vertical formwork《新浇混凝土对垂直模板的压力》.pdf
《DIN 18218-2010 Pressure of fresh concrete on vertical formwork《新浇混凝土对垂直模板的压力》.pdf》由会员分享,可在线阅读,更多相关《DIN 18218-2010 Pressure of fresh concrete on vertical formwork《新浇混凝土对垂直模板的压力》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、January 2010DEUTSCHE NORM Normenausschuss Bauwesen (NABau) im DINDIN-SprachendienstEnglish price group 11No part of this translation may be reproduced without prior permission ofDIN Deutsches Institut fr Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,has the exclusive right of sale
2、for German Standards (DIN-Normen).ICS 91.080.40!$mQ“1745646www.din.deDDIN 18218Pressure of fresh concrete on vertical formworkEnglish translation of DIN 18218:2010-01Frischbetondruck auf lotrechte SchalungenEnglische bersetzung von DIN 18218:2010-01Pression de bton frachement malax sur des coffrages
3、 verticauxTraduction anglaise de DIN 18218:2010-01SupersedesDIN 18218:1980-09www.beuth.deDocument comprises pages1904.11 DIN 18218:2010-01 A comma is used as the decimal marker. Contents Page Foreword3 1 Scope 4 2 Normative references 4 3 Terms, definitions and symbols.4 3.1 Terms and definitions .4
4、 3.2 Symbols 6 3.3 Subscripts 6 4 Fresh concrete pressure.6 4.1 General6 4.2 Design value of fresh concrete pressure 6 4.3 Distribution of fresh concrete pressure over the height of the formwork.7 4.4 Determination of the characteristic value of the maximum fresh concrete pressure 8 5 Parameters aff
5、ecting the magnitude of fresh concrete pressure.9 5.1 General9 5.2 End of setting.10 5.3 Temperature .10 5.4 Fresh concrete density .11 5.5 Compaction 11 5.6 Admixtures and additives .11 5.7 Vibrations .12 5.8 Reinforcement12 Annex A (normative) Determination of setting times by the “knead bag” meth
6、od13 A.1 General13 A.2 Apparatus .13 A.3 Sampling and test procedure .13 A.4 Test report 14 Annex B (normative) Diagrams to determine the maximum value of lateral fresh concrete pressure15 2 DIN 18218:2010-01 Foreword This document has been prepared by Working Committee NA 005-07-11 AA Bauausfhrunge
7、n of the Normenausschuss Bauwesen (Building and Civil Engineering Standards Committee). The new edition of the standard was published because of the need to incorporate concrete of consistency classes F5, F6 and self-compacting concrete (SCC), as no provisions covering these types of concrete existe
8、d up to this point in time. The specifications have been developed on the basis of scientific publications and the results of tests on the pressure of fresh concrete on vertical formwork. Amendments The standard differs from DIN 18218:1980-09 as follows: a) the terms and definitions have been brough
9、t into line with technical developments, and the terminology has been adapted to correspond to that used in the reference standards; b) loads are determined using the concept of partial safety factors; c) the influence of fresh concrete temperatures is taken into account; d) the influence of concret
10、e compaction (vibration) is taken into account; e) the method used to determine the pressure of fresh concrete has been amended, particularly with regard to consistency classes F5, F6 and SCC; f) test methods to determine the end of setting of concrete have been specified. Previous editions DIN 1821
11、8: 1980-09 3 DIN 18218:2010-01 1 Scope This standard is intended to be used to determine the fresh concrete pressure on vertical formwork by concrete according to DIN EN 206-1 and DIN 1045-2, and by self-compacting concrete (SCC) according to DAfStb-Richtlinie “Selbstverdichtender Beton” (SCC Code o
12、f practice issued by the German Reinforced Concrete Committee) with a maximum size of aggregate of 63 mm. The fresh concrete pressure established according to this standard is the most important criterion governing the design of vertical formwork and formwork that deviates from the vertical by up to
13、 5. Deviations from the specifications of this standard are permitted if a more precise verification is made on the basis of calculation and/or empirical testing. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, o
14、nly the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. DIN 1045-2, Concrete, reinforced and prestressed concrete structures Part 2: Concrete Specification, properties, production and conformity Application rules for DI
15、N EN 206-1 DIN 4235-1:1978-12, Compacting of concrete by vibrating Vibrators and vibration mechanics DIN 4235-2:1978-12, Compacting of concrete by vibrating Compacting by internal vibrators DIN 4235-3, Compacting of concrete by vibrating Compacting by external vibrators during the manufacture of pre
16、cast components DIN 4235-4, Compacting of concrete by vibrating Compacting of in-situ by formwork vibrators DIN EN 206-1:2001-07, Concrete Part 1: Specification, performance, production and conformity; German version EN 206-1:2000 DIN EN 480-2, Admixtures for concrete, mortar and grout Test methods
17、Part 2: Determination of setting time DIN EN 12350-5, Testing fresh concrete Part 5: Flow table test DIN EN 12812, Falsework Performance requirements and general design DAfStb-Richtlinie Selbstverdichtender Beton (SVB-Richtlinie) (DAfStb Code of practice on self-compacting concrete)1)3 Terms, defini
18、tions and symbols 3.1 Terms and definitions For the purposes of this document the following terms and definitions apply. 3.1.1placing temperature Tc,placingtemperature of the fresh concrete directly after placing (in the formwork) 1) Obtainable from Beuth Verlag GmbH, 10772 Berlin. 4 DIN 18218:2010-
19、01 NOTE The placing temperature can be deduced from the temperature of the fresh concrete at the time of its handover on site and from the prevailing ambient conditions. 3.1.2 depth of penetration of internal vibrator hvdifference in height between the surface of the fresh concrete and the lower end
20、 of the internal vibrator 3.1.3 end of setting tEtime between the first addition of water for making the concrete and the point in time at which the concrete is fully set NOTE The end of setting of the fresh concrete tE can be determined by the Vicat penetration method specified in DIN EN 480-2 usin
21、g mortar that is sieved from the concrete using a sieve of 4 mm aperture size. The end of setting may also be approximated to tE= 1,25 tE,knead, where tE,kneadis the end of setting according to the “knead-bag test” (see Annex A). 3.1.4 fresh concrete mixture of cement, aggregate and water (and, wher
22、e required, admixtures and additions), that has not yet set or hardened and that still requires the support of formwork in order to retain its dimensional stability 3.1.5 lateral fresh concrete pressure hlateral pressure caused by fresh concrete acting on the surface of formwork 3.1.6 fresh concrete
23、 density cdead weight divided by the volume of the fresh concrete after compaction 3.1.7 hydrostatic pressure head hsdifference in height between the surface of the fresh concrete and the point at which the fresh concrete pressure reaches the value hk,max3.1.8 consistency measure of the deformabilit
24、y and flowability of the fresh concrete NOTE The consistency of fresh concrete is evaluated in accordance with DIN EN 206-1 or DIN 1045-2 by means of consistency classes or flow classes. The concrete is classified into classes F1, F2, F3, F4, F5 or F6 or as self-compacting concrete. The flow table t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DIN182182010PRESSUREOFFRESHCONCRETEONVERTICALFORMWORK 混凝土 垂直 模板 压力 PDF

链接地址:http://www.mydoc123.com/p-653930.html